This document is a builders' estimate for a residential construction project. It includes:
1) Itemized estimates for materials, labor, and other costs totaling over 47 million. The largest material costs are for cement, rebar, wood, and bricks.
2) Breakdowns of labor costs for positions like masons, carpenters, and workers. Labor costs total over 16 million.
3) Notes that some finishing items like painting, ceilings, doors, windows, and tiles are not included in the totals, and would amount to over 8 million additional.
4) The previous estimate for the project was 47.7 million, so this estimate is in line with expectations.
This document is a builders' estimate for a residential construction project. It includes:
1) Itemized estimates for materials, labor, and other costs totaling over 47 million. The largest material costs are for cement, rebar, wood, and bricks.
2) Breakdowns of labor costs for positions like masons, carpenters, and workers. Labor costs total over 16 million.
3) Notes that some finishing items like painting, ceilings, doors, windows, and tiles are not included in the totals, and would amount to over 8 million additional.
4) The previous estimate for the project was 47.7 million, so this estimate is in line with expectations.
This document is a builders' estimate for a residential construction project. It includes:
1) Itemized estimates for materials, labor, and other costs totaling over 47 million. The largest material costs are for cement, rebar, wood, and bricks.
2) Breakdowns of labor costs for positions like masons, carpenters, and workers. Labor costs total over 16 million.
3) Notes that some finishing items like painting, ceilings, doors, windows, and tiles are not included in the totals, and would amount to over 8 million additional.
4) The previous estimate for the project was 47.7 million, so this estimate is in line with expectations.
Builders' Estimate Sr.N Particular Quantity Unit Rate Per Amount Expand Remark o A Materials 1 Cement 520 Bag 7,800 Bag 4,057,704 1,930,306 2 Sand 19 Sud 17,500 Sud 337,391 371,000 3 River Shingle 16 Sud 65,000 Sud 1,023,255 570,000 4 J/wood scantling 6 Ton 1,100,000 Ton 7,148,532 5 5ply wood (8'x4') 58 Sht 22,500 Sht 1,304,526 6 Nails and Spikes 40 Viss 6,000 Viss 242,944 8,696,002 7 Fuel 34 Gal 10,000 Gal 341,558 132,300 8 16mmØ Bar 4 Ton 1,745,000 Ton 7,374,812 9 10mmØ Bar 2 Ton 1,870,000 Ton 4,359,843 10 8mmØ Bar 1 Ton 2,205,000 Ton 2,844,459 14,135,903 14,579,114 11 Binding wire 149 Lb 1,000 Lb 149,480 229,500 12 Brick 23674 Nos 155 Nos 3,669,480 1,290,000 13 X met 3739 Rft 150 Rft 560,862 387,200 Piping 33,414,845 78,000 Sand Filling B Labours - 30,000 impermo 1 Surveyor 0.08 Nos 20,000 Nos 1,512 142,000 General 2 Mason 179.34 Nos 15,000 Nos 2,690,131 95,500 Transportation 3 Steel fixer 136.56 Nos 15,000 Nos 2,048,345 67,400 Treat 4 Carpenter 290.78 Nos 15,000 Nos 4,361,651 6,100,000 Labour 6 Machine Operator 8.54 Nos 12,000 Nos 102,468 1,090,000 Door 7 Worker 711.55 Nos 10,000 Nos 7,115,488 1,081,000 Concrete 16,319,596 14,200,000 Total (A+B) 47,614,845 Previous Say 47,700,000 27,730,109 38,918,844 Not included - Painting, Ceiling, 49,734,441
Door ,D1,3 900,000 kbz special 20,000,000
Door ,D2,6 900,000 kbz special 10,000,000 Window, 21 1,680,000 LL 300,000 Toilet ,4 1,000,000 Loan 3,000,000 Main Lighting Point 1,200,000 33300000 Main lighting Swift 28,000 5,569,891 Minor Lighting Poin 36,000 Minor lighting Swif 24,000 Cable -400 ft 320,000 Cable trucking -40 322,000 Main Board 150,000 Waste Pipe Floor and Wall Tile 600,000 Pipe 600,000 Worker Fee for M& 1,000,000 8,760,000 47,678,844