MEP RWANDA Ltd

Contracting in Design, Installation, Maintenance and Repair of Lifts, All


Mechanical, Electrical and Plumbing works in the building constructions.
Engineering for customer needs

A. SUPPLY &INSTALLATION NEW WATER TANK OF


5000L
ITEM DESCRIPTION QTY U. PRICE T. PRICE
NO (Rwf) (Rwf)
1 water tank include transport to the site 1
400,000 400,000
2 Clean water pump 1.5KW 1 520,000 520,000
3 Float valve 1" 1
30,000 30,000
4 Pressure regulator 1 40,000 40,000
5 Non -return valve 1” 1 6,500 6,500
6 Double union valve 32mm 5 7,000 35,000
7 Ppr Union adapter32mm 2 2,000 4,000
8 Ppr tee 32mm 2 2,000 4,000
9 ppr socket 5 2,000 10,000
10 ppr elbow32mm 8 2,000 16,000
11 Ppr pipe1” 4 7,500 30,000
12 Ppr pipe 3/4 1 6,000 6,000
13 niple 1" 1 1,200 1,200
14 galvanized elbow 1" 1 2,000 2,000
15 traverse 1 8,000 8,000
16 Teflon 3 1,000 3,000
17 Electric Cable for pump connection 8 1,200 9,600

Total cost for materials 1,125,300


MEP RWANDA LTD ACCOUNT NUMBER:100087853718 BANK OF KIGALI
Email: meprwanda@gmail.com
Tel:+250784363002
TIN:120784920
KIGALI-RWANDA
MEP RWANDA Ltd
Contracting in Design, Installation, Maintenance and Repair of Lifts, All
Mechanical, Electrical and Plumbing works in the building constructions.
Engineering for customer needs

B. NEW CLEAN WATER TANK STAND MAKING


ITEM DESCRIPTION QTY U. PRICE T. PRICE
NO (Rwf) (Rwf)
1 Tube 80x40 11
35,000 385,000
2 Tube 30x30 5
15,000 75,000
Tube 60X40 2
18,000 36,000
3 Tole plane 2
45,000 90,000
4 Baguette 1
12,000 12,000
5 cutting disc 1
12,500 12,500
6 Anti -rouille 1
12,000 12,000
7 cement 2
13,000 26,000
8 concase 3
5,000 15,000
9 sand 2
5,000 10,000
Material transport 1
30,000 30,000
Total material cost
703,500

MEP RWANDA LTD ACCOUNT NUMBER:100087853718 BANK OF KIGALI


Email: meprwanda@gmail.com
Tel:+250784363002
TIN:120784920
KIGALI-RWANDA
MEP RWANDA Ltd
Contracting in Design, Installation, Maintenance and Repair of Lifts, All
Mechanical, Electrical and Plumbing works in the building constructions.
Engineering for customer needs

PUMP SHELTER MAKING


ITEM U. PRICE T. PRICE
DESCRIPTION QTY
NO (Rwf) (Rwf)
1 Metal tube 30*30mm 10 9,000 90,000
2 Sheet metal 1 8,500 8,500
3 velour 1 2,000 2,000
3 Pomelle 2 1,500 3,000
4 Nails for sheet metal 1/2kg 2,000 2,000
5 Paint with anti-corrosion 2 8,000 16,000
5 Brush 1 1,500 1,500
6 Tinel 1L 2,000 2,000
7 Rock(cadenat) 1 2,500 2,500
Transport For Tube 1 10,000 10,000
Total material cost 137,500
GRAND TOTAL MATERIAL
COST 1,966,300
LABOR COST
400,000
MATERIAL+LABOR
2,366,300
CONTRACTOR CLIENT

MEP RWANDA LTD SALESIEN DE DON BOSCO

Eng. Cassien NTIBAGIRIMPUHWE

MEP RWANDA LTD ACCOUNT NUMBER:100087853718 BANK OF KIGALI


Email: meprwanda@gmail.com
Tel:+250784363002
TIN:120784920
KIGALI-RWANDA