Contracting in Design, Installation, Maintenance and Repair of Lifts, All
Mechanical, Electrical and Plumbing works in the building constructions. Engineering for customer needs
A. SUPPLY &INSTALLATION NEW WATER TANK OF
5000L ITEM DESCRIPTION QTY U. PRICE T. PRICE NO (Rwf) (Rwf) 1 water tank include transport to the site 1 400,000 400,000 2 Clean water pump 1.5KW 1 520,000 520,000 3 Float valve 1" 1 30,000 30,000 4 Pressure regulator 1 40,000 40,000 5 Non -return valve 1” 1 6,500 6,500 6 Double union valve 32mm 5 7,000 35,000 7 Ppr Union adapter32mm 2 2,000 4,000 8 Ppr tee 32mm 2 2,000 4,000 9 ppr socket 5 2,000 10,000 10 ppr elbow32mm 8 2,000 16,000 11 Ppr pipe1” 4 7,500 30,000 12 Ppr pipe 3/4 1 6,000 6,000 13 niple 1" 1 1,200 1,200 14 galvanized elbow 1" 1 2,000 2,000 15 traverse 1 8,000 8,000 16 Teflon 3 1,000 3,000 17 Electric Cable for pump connection 8 1,200 9,600
Total cost for materials 1,125,300
MEP RWANDA LTD ACCOUNT NUMBER:100087853718 BANK OF KIGALI Email: meprwanda@gmail.com Tel:+250784363002 TIN:120784920 KIGALI-RWANDA MEP RWANDA Ltd Contracting in Design, Installation, Maintenance and Repair of Lifts, All Mechanical, Electrical and Plumbing works in the building constructions. Engineering for customer needs
B. NEW CLEAN WATER TANK STAND MAKING
ITEM DESCRIPTION QTY U. PRICE T. PRICE NO (Rwf) (Rwf) 1 Tube 80x40 11 35,000 385,000 2 Tube 30x30 5 15,000 75,000 Tube 60X40 2 18,000 36,000 3 Tole plane 2 45,000 90,000 4 Baguette 1 12,000 12,000 5 cutting disc 1 12,500 12,500 6 Anti -rouille 1 12,000 12,000 7 cement 2 13,000 26,000 8 concase 3 5,000 15,000 9 sand 2 5,000 10,000 Material transport 1 30,000 30,000 Total material cost 703,500
MEP RWANDA LTD ACCOUNT NUMBER:100087853718 BANK OF KIGALI
Email: meprwanda@gmail.com Tel:+250784363002 TIN:120784920 KIGALI-RWANDA MEP RWANDA Ltd Contracting in Design, Installation, Maintenance and Repair of Lifts, All Mechanical, Electrical and Plumbing works in the building constructions. Engineering for customer needs
PUMP SHELTER MAKING
ITEM U. PRICE T. PRICE DESCRIPTION QTY NO (Rwf) (Rwf) 1 Metal tube 30*30mm 10 9,000 90,000 2 Sheet metal 1 8,500 8,500 3 velour 1 2,000 2,000 3 Pomelle 2 1,500 3,000 4 Nails for sheet metal 1/2kg 2,000 2,000 5 Paint with anti-corrosion 2 8,000 16,000 5 Brush 1 1,500 1,500 6 Tinel 1L 2,000 2,000 7 Rock(cadenat) 1 2,500 2,500 Transport For Tube 1 10,000 10,000 Total material cost 137,500 GRAND TOTAL MATERIAL COST 1,966,300 LABOR COST 400,000 MATERIAL+LABOR 2,366,300 CONTRACTOR CLIENT
MEP RWANDA LTD SALESIEN DE DON BOSCO
Eng. Cassien NTIBAGIRIMPUHWE
MEP RWANDA LTD ACCOUNT NUMBER:100087853718 BANK OF KIGALI