The document provides a cost estimate for installing pipe lines and valves. It lists the materials, quantities, unit prices, and subtotals for MS and GRP pipe lines. Installation of each includes manpower, supervision, safety equipment, tools, worker accommodations, food, transportation, and hydrotesting. The total cost estimate without VAT is 127,000.
The document provides a cost estimate for installing pipe lines and valves. It lists the materials, quantities, unit prices, and subtotals for MS and GRP pipe lines. Installation of each includes manpower, supervision, safety equipment, tools, worker accommodations, food, transportation, and hydrotesting. The total cost estimate without VAT is 127,000.
The document provides a cost estimate for installing pipe lines and valves. It lists the materials, quantities, unit prices, and subtotals for MS and GRP pipe lines. Installation of each includes manpower, supervision, safety equipment, tools, worker accommodations, food, transportation, and hydrotesting. The total cost estimate without VAT is 127,000.
SLNO DESCRIPTION PIPE SIZE QTY PRICE AMOUNT/PER CONNECTION AMOUNT QTY JOINT 1 MS PIPE LINE JOINT WELDING 24 2 12,800 25600 2 51,200.00 2 GATE VALVE 24 1 2400 2400 2 4,800.00 3 20 mm copper tubing 20 mm 2 2 12,500.00 flow transmitter with manifold 20 mm 10 300 3,000.00 support and base plate 4,000.00 hydro test with meterials 8,000.00 83,500.00 - GRP LINE - - 1 GRP LINE INSTALLING FLANGE PER JOINT 24 2 13500 27000 1 27,000.00 2 GATE VALVE 24 1 1500 1500 1 1,500.00 20 mm copper tubing 20 mm 1 6,500.00 flow transmitter with manifold 20 mm 1 1,500.00 support and base plate 2,000.00 hydro test with meterials 5,000.00 43,500.00
SUB TOTAL AMOUNT WITHOUT VAT 127,000.00
A MS PIPE LINE VALVE INSTALLATION(INCLUDING)
1 MANPOWER 2 SUPERVISOR 3 WPR 4 SAFETY 5 CONSUMER 6 PPE 7 POWER TOOLS 8 HAND TOOLS 9 WORKERS ACCOMADATION 10 FOOD 11 TRANSPORTATION 12 SUPPORT MANPOWER FOR LEAKAGE TEST ONLY. 13 hydrotest
B GRP PIPE LINE VALVE INSTALLATION(INCLUDING)
1 MANPOWER 2 SUPERVISOR 3 WPR 4 SAFETY 5 CONSUMER 6 PPE 7 POWER TOOLS 8 HAND TOOLS 9 WORKERS ACCOMADATION 10 FOOD 11 TRANSPORTATION 12 SUPPORT MANPOWER FOR LEAKAGE TEST ONLY. 13 hydro test