Technical Proposal

WSP ISP
wazirakbarkhan Date: 6/1/2024

No Item Discription Unit Qty Unit Price Total Price Remark


Customer Demarcation Device, Layer2 Media Converter 10/100/1000mbps
1 1000Base-Lx (Single fiber)
set 1 8,000.000 8,000.000

AfTel End Device, Layer2 Media Converter 10/100/1000mbps


2 1000Base-Lx (Single fiber)
set 1 8,000.000 8,000.000
3 G.657D Single Mode12core Fiber Optic Cable mtr 870 60.000 52,200.000
4 Optical Distribution Frame, rack mount with SC/PC SM 1mtr Pigtails pcs 1 7,000.000 7,000.000
5 Cable Laying in Conduit (Using Cable rodder & Cable blowing machine) mtr 870 25.000 21,750.000
6 Trenching/Backfilling Pipe laying and repairing(normal Area) mtr 0 120.000 -
7 Trenching/Backfilling Pipe laying and repairing mountains Area(‫)سخره‬ mtr 250 400.000 100,000.000
8 Trenching Pipe laying and repairing concrete/asphalt area mtr 0 400.000 -
9 Boring the Asphalt/Concrete Road mtr 520 250.000 130,000.000
10 Manhole no 0 30,000.000 -
11 Handhole no 1 25,000.000 25,000.000
12 Underground Warning tape, mtr 0 5.000 -
13 High-Density Polyethylene Pipe (Pure HDPE) mtr 820 70.000 57,400.000
14 Steel Pipe (crossing from road/walkway/river) mtr 4 400.000 1,600.000
15 Single-Mode, 9-Micron Duplex Fiber Optic Patch cord Cable, LC/PC-SC/PC, PVC, 10mtr 2.00mm pair 1 250.000 250.000
16 Single-Mode, 9-Micron Duplex Fiber Optic Patch cord Cable, LC/PC-LC/PC, PVC, 5mtr 3.00mm pair 1 200.000 200.000
17 Installation of HDPE pipe on wall or along bridges with metal clips in each meter set 50 80.000 4,000.000
18 Black Box, 2in/2out12Core Under Ground Waterproof Joint Enclosure, pcs 1 2,000.000 2,000.000
19 Link Basic rack size_6U set 0 8,000.000 -
20 Fiber Optic Fusion Splicing & Testing set 2 3,000.000 6,000.000
21 Engineering and Transportation Cost time 1 5,000.000 5,000.000
Surveyed By: Engr.Naser & Engr.Nader, The above survey is supposed from manhole at Wazirakhbar Khan square.
Sub total 428,400.00
Discount: -
Fright: -
Tax:
Grand Total AFN: 428,400.000
Amount in words (four hundred twenty-eight thousand four hundred Afghanis )

Terms & Conditions:

• Offer valid for 30 days,


• Service delivery time for construction is ........ working days after PO (Except RoW, Gov restriction or delay),
• Warranty 30 days for Devices,
• AC/DC Power source, Space for equipments at the customer end will be provided by the Customer,
• Permission of work for inside & outsied Premises be provided by Customer,
• Test results will be provided for Afghan Telecom,
• Prices are in Afghanis,
• If there is any changes in geography extra payments will be charged accordingly,
Note: Converting to other currencies based on Central Bank of Afghanistan http://www.centralbank.gov.af/foreignexchange.php daily Exchange Rate will calculate),