Professional Documents
Culture Documents
LABOR P 988,110.04
X CONTINGENCIES P 345,838.60
------------------------
XI TOTAL CONSTRUCTION COST P 3,804,224.64
:
BILL OF MATERIALS AND ESTIMATES
I DEMOLITION
P 5,000.00
II CONCRETE / MASONRY WORKS
ITEM
1½" Φ G.I. PIPESCHEDULE 40 3 PCS. 980.00 2,940.00
10 MM SQURE BAR 8 PCS. 240.00 1,920.00
2" x ¼" FLAT BAR 3 PCS. 530.00 1,590.00
WELDED ROD 3 BOX 2,268.00 6,804.00
P 13,254.00
PROJECT : A PROPOSED TWO-STOREY RESIDENCE WITH ROOF DECK
LOCATION : BRGY. STA. MONICA OTON,ILOILO
P -
CONTINGENCIES P -
PREPARED BY:
FELLOW, NAMPAP
RMP, PRC. NO.
TIN. NO.
PTR NO.
PLACE:
DATE:
PROJECT : A PROPOSED TWO-STOREY RESIDENCE WITH ROOF DECK
LOCATION : BRGY. STA. MONICA OTON,ILOILO
PREPARED BY:
#REF!
#REF!
3,458,386.04
0.00
3,458,386.04
345,838.60
3,804,224.64
#REF!
2FB1 12.6 0.2 0.5 1.26 8 18 16MM 5 63 13 9mm
0 #REF! #REF!
CONCRETE VOL. a REBAR
#REF!
I. DEMOLITION
V PAINTING WORKS
VI FINISHING/TILEWORKS
COST OF MATERIALS
V PAINTING WORKS
VI FINISHING / TILEWORKS
ITEM
1½" Φ G.I. PIPESCHEDULE 40 3 PCS. 980.00
10 MM SQURE BAR 8 PCS. 240.00
2" x ¼" FLAT BAR 3 PCS. 530.00
WELDED ROD 3 BOX 2,268.00
5,000.00
126,035.00
89,611.00
41,400.00
262,046.00
COST
5,000.00
P 5,000.00
COST
44,800.00
22,500.00
56,000.00
1,085.00
1,650.00
P 126,035.00
COST
43,680.00
9,408.00
12,155.00
15,912.00
280.00
120.00
4,500.00
420.00
3,136.00
P 89,611.00
COST
6,000.00
7,350.00
20,000.00
5,400.00
4,200.00
1,500.00
2,500.00
270,000.00
195.00
P 278,395.00
COST
12,000.00
29,400.00
P 41,400.00
2,940.00
1,920.00
1,590.00
6,804.00
P 13,254.00