PACKAGE
Item Description Qty. Unit Unit Cost Labor Total Unit Cost Amount
Materials 30.00%
I REMOVAL
Removal of Existing Roof 13,000 13,000
Removal of ceiling and ceiling frame 7,500 7,500
Removal of trusses 9,500 9,500
Sub-total 236,830.00
TOTAL 355,245.00
PREPARED BY:
JUN REY P. MAWE
LISCENCE CIVIL ENGINEER
Page 1 PACKAGE A
DETAILED ESTIMATE
PACKAGE
Item Description Qty. Unit Unit Cost Labor Total Unit Cost Amount
Materials 30.00%
Sub-total 173,808.10
PREPARED BY:
JUN REY P. MAWE
LISCENCED CIVIL ENGINEER
HOTEL 1 (3RD FLOOR)
CEILING WORKS
Quantity Width Length AREA
Rooms 16 4.38 7.60 532.00
Rooms 16 4.08 8.30 541.82
AHU 2 2.00 3.40 13.60
HallWay 16 1.80 4.12 118.66
2 1.80 2.00 7.20
Balcony 14 1.20 3.75 63.00
CEILING WORKS
Quantity Width Length AREA Materials
Rooms 16 4.38 7.60 532.00
Rooms 16 4.08 8.30 541.82
AHU 2 2.00 3.40 13.60
HallWay 16 1.80 4.12 118.66
2 1.80 2.00 7.20
Balcony 14 1.20 3.75 63.00
FR 1 1 95.00
FR 2 1 88.92
FR 3 1 95.00
FR 4 1 88.92
Foyer 1 87.00
Pre Function 1
Grand Ballroom 1192.90
PWD Toilet 1 32.00
Female Toilet 1 47.4
Male Toilet 1 48.5
All Day Dining Restaurant 521.99
36.86 485.129
Painting Works Wall Height
DDR 1 4 4.38 7.20 138.9 3.00
DDR 2 4 4.38 7.20 138.9 3.00
DDR 3 2 4.38 7.20 69.45 3.00
KR 1 3 4.38 7.20 104.175 3.00
KR 4 2 4.38 7.20 69.45 3.00
KR 5 1 4.38 7.20 34.725 3.00
ER 3 7.90 12.00 179.1 3.00
TS 1 4.35 7.20 69.3 3.00 2.00
LS 1 4.2 7.20 68.4 3.00 2.00
AHU 2 1.79 3.00 57.48 3.00 2.00
HallWay 1 4.10 16.00 60.3 3.00
1 4.10 16.00 60.3 3.00
1 0.90 1.90 16.8 3.00 2.00
EL 1 7.40 22.2 3.00
Linen Room 1 8.14 48.84 3.00 2.00
EE Room 1 1.10 3.00 24.6 3.00 2.00