12" 18"
F.F.L F.F.L 7"
SUMP
1 1/2" TH D.P.C (1:2:4)
15"
2'X2'
BOUNDARY:-
8'-0"
F.F.L F.F.L
7'-6"
5'
3-1/2"Ø 6"
12"
6" 6" 6" TO M.HOLE
12"
12"
SCHEDULE OF AREA
5'
6" 6"
R.L R.L
10" P.C.C 1:4:8
13"
6"
ROAD.LEV ROAD.LEV 13'-3"
COLUM 1.TOTAL PLOT AREA = 2500-00 SFT;
9"
6"
6"
18"
2.GROUND FLOOR AREA = 1900 -00 SFT;
SCALE 1"=1'-0"
SEPTIK TANK DETAIL
4'
1
22" 132"
12" 6"
6'
6"
SCALE 1/4"=1'-0" 3.FIRST FLOOR AREA = 1900 -00 SFT;
4.SECOND FLOOR AREA
2'
= 000 -00 SFT;
3' P.C.C (1:6:12) BOTTAM JALI BOTH WAY
5'
P.C.C (1:6:12) 12MM 125CC 5.BUILT UP AREA = 3800-00 SFT;
6.COVERAGE = 91.26% 7. OPENING = 8.74%
FOUNDATION DETAIL 10"
DRAWN ,VERIFIED & SIGN.BY
SCALE 1/2"=1'-0"
10"
10"
5'
3/8"Ø @ 8"C/C
1½" TH.BRICK TILES GROUTED IN C.S.MORTER (1:2)
1-3/8"Ø 4" MUD & MUD PLASTER B B
ONE LAYER OF POLYTHENE SHEET
6"
6 RODS OF 12 MM O
6 MM O RING @ 6" C/C 3/8"Ø @ 9" C/C 2" THICK HIGH DENSITY THERMOPORE SHEET
6"
1/2"Ø @ 8"C/C ONE LAYER OF POLYTHENE SHEET
TWO COATS OF HOT BITUMEN
3-1/2"Ø
1/2"Ø @ 8"C/C ASPHALT PRIMER 5'
10"
4-3/4"Ø 6" THICK R.C.C SLAB 1:2:4
FOUNDATION PLAN
STAIR DETAIL
10" 6" SLAB
10" BEAM
SCALE 1/2"=1'-0" SCHEDULE OF DOOR & WINDOWS
SCALE 1/2"=1'-0" BEAM S.NO TYPE SIZE SILL REMARKS
SCALE 1"=1'-0"
1. D1 3'-6"X7'-0" 0'-0" WOODEN
2. D2 3'x7' 0'-0"
" "
3/8"Ø @ 9" C/C 3. D3 2'6"X7'-0" 0'-0" " "
3-1/2"Ø
4. D4 4'X7'-0" 0'-0"
" "
10"
4-3/4"Ø 5. W 4'X4' 0'-4" ALMN GLZD
ELEVATION 6. W2 3'X4' 0'-4"
SCALE 1/2"=1'-0" " "
10" 3'
10" 6" SLAB
APPLICANT SIGN
10" BEAM
COLUM
SCALE 1"=1'-0"
10'2"
SCHEDULE OF REINFORCEMENT
28'-1" 28'-1" 6" SLAB SHORTER SPAN LONGER SPAN
6"
10" BEAM
3/8"Ø @ 8" C/C 3/8"Ø @ 8" C/C
6"
10" S;QTR+M.ROOM
S,KIT; 3/8"Ø @ 7" C/C 3/8"Ø @ 8" C/C
10'6"
3' M.BATH+BATH1,2,3 1/2"Ø @ 6" C/C 1/2"Ø @ 8" C/C
3"
SHOP
BED1,2 1/2"Ø @ 5" C/C 1/2"Ø @ 7" C/C
SHOP 10'4"X10'4"
5'
8'3"X10'4"
G;LEV; 12" TIE BEAM
APPROVED BY
SECTION AT A-A
8'10"
SCALE 1/8"=1'-0"
WIDE WAY
56'
56'
"
53'10
"
53'10
SHOP
SHOP HALL
10'4"X9'6"
13'1"X9'6" 28'1"X40'4"
AREA
UP
53'10"
56'
SHOP BUILTUP 3-1/2"Ø
A
10'4"X11'
SPICIFICATIONS
DN
DN
15"
1.FOUNDATION 1:1.5:3 ISOLATED FOOTING FOUNDATION
2. PLINTH AND FIRST CLASS B/W IN CM 1:8 SUPERSTUCTURE 3" THICK CC 1:2:4 DPC WITH DPC POWDER
4-3/4"Ø 3. FLOORING 1" MOSAIC FLOORING OVER 6" DRK
4. LINTEL 6" RCC LINTEL AND BAND OVER ALL WALL
40'-5" 40'-5" 5. ROOFING 4" RCC SLAB AND BEAM 1:1.5:3 ROOF TILES OVER RCC SLAB
6. WOODWORK SAL WOOD CHAUKHAT 4"X3"SIZE AND 1.25" THICK SHUTTERS DOOR AND WINDOWS
GROUND FLOOR PLAN FIRST FLOOR PLAN SITE & LOCATION PLAN 10" 7. FINISHING TWO COATS WHITE WASHING OVER 1/4" CEMENT PLASTER
1:4 IN CEILLING AND 1/2" CEMENT PLASTER 1:6 BOTH SIDE WALLS
NO SCALE 8. SANITATION 1.POWER DRIVEN TUBE WELL
SCALE 1/8"=1'-0" SCALE 1/8"=1'-0" BEAM 1 2. PROVISION OF SEPTIC TANK WITH SOAK PIT AS
PER DETAILED DRAWING & 6"X6" PUCCA DRAIN ALL SIDE OF WALLS
SCALE 1"=1'-0"
9. EARTQUAKE RESISTANT RCC FRAMED STRUCTURE