You are on page 1of 1

6m Pole BOQ.

ERECTION LENGTH NOS. UNIT WT. TOTAL WT.


DESCRIPTIONS SECTION REMARKS
MARK IN mm. REQD. (Kgs./m or m2) (Kgs.)
1 MAIN PIPE 88.9x4 PIPE 2980 1 8.36 24.91
1A MAIN PIPE 88.9x4 PIPE 2984 1 8.36 24.95
2 BASE PLATE PL.200x10 200 1 78.50 3.14
3 STIFFENER PLATE PL.50x8 150 4 62.80 1.88
4 PLATE PL.200x10 200 2 78.50 6.28
5 PLATE PL.88x6 115 2 47.10 0.95
6 STRUT PIPE 48.3x3.2 PIPE 3768 2 3.56 26.83
7 BRACING 48.3x3.2 PIPE 679 2 3.56 4.83
7A BRACING 48.3x3.2 PIPE 1116 1 3.56 3.97
8 PLATE PL.70x6 95 4 47.10 1.25
9 PLATE PL.50x6 65 4 47.10 0.61
10 PLATE PL.50x6 95 4 47.10 0.89
11 COVER PLATE PL.210x6 210 1 47.10 2.08
12 COVER PLATE PL.210x6 210 1 47.10 2.08
13 MS ROD ROD 16 DIA 560 1 1.58 0.88
14 STEP ANGEL L 45x45x5 450 10 3.40 15.30
15 FLANG PLATE PL.210x10 210 2 78.50 6.92
16 STIFFENER PLATE PL.62x8 75 6 62.80 1.75
17 EARTHING PLATE PL.50x6 70 1 47.10 0.16
18 LIFTING BRACKET PLATE PL.110x8 220 8 62.80 12.16
141.82
GALVANISED WT. 4% 5.67
WEIGHT (Kgs.) = 147.49
MATERIALS OF BOLT LIST (5.6 GRADE)
ERECTION LENGTH NOS. UNIT WT. TOTAL WT.
DESCRIPTIONS SECTION 2 REMARKS
MARK IN mm. REQD. (Kgs./m or m ) (Kgs.)
STRUTS & BRACING M16 60 10 0.19 1.90 1 BOLT + 1 NUTS + 1 WASHERS
FLANGE M16 65 10 0.23 2.30 1 BOLT + 2 NUTS + 2 WASHERS
FOR ANTI SLIP M12 80 20 0.15 3.00 1 BOLT + 2 NUTS + 2 WASHERS
STRUTS & BRACING Pack Washer 40x40x8 10 0.10 1.00
WEIGHT (Kgs.) = 8.20
TOTAL WEIGHT (Kgs.) (147.49+8.20) = 155.69
M12/110 LONG HIT-HY 200-R V3+HIT-V (5.8) (EMBEDMENT DEPTH75mm) = 12NOS.

You might also like