You are on page 1of 13

WELMEC 11

Subgroup Electricity
Standard mapping IEC TC13 & ISC77A – CLC TC13X

12th October 2021


Version V1 Jean-Luc Pfaff
(Gimelec)

All information contained in this presentation is the confidential property of ©2020 1


Welmec. The presentation and its content cannot be copied or distributed
without the expressed consent of the owners.
New publication IEC TC13 standards 2021
Work programm IEC TC13

Standard Title Publication


date
IEC 62053-31 ED2 Electricity metering equipment (AC) - General requirements, tests and test conditions - Part 2022-12
31: Product safety requirements and tests

IEC 62052-41 ED1 Electricity metering equipment – General requirements, tests and test conditions – Part 41: 2022-09
Energy registration methods and requirements for multi-energy and multi-rate meters

IEC 62055-31 ED2 Electricity metering - Payment systems - Part 31: Particular requirements - Static payment 2022-07
meters for active energy (classes 1 and 2)

IEC 62055-42 ED1 Electricity metering - Payment systems - Part 42: Transaction Reference Numbers (TRN) 2022-08

IEC 62056-5-3 ED4 Electrcity metering data exchange - The DLMS/COSEM suite - Part 5-3: DLMS/COSEM 2022-10
application layer
Lastest news :
IEC 62056-6-1 ED4 Electricity metering data exchange - The DLMS/COSEM suite - Part 6-1: Object Identification 2022-10
System (OBIS)
PNW TS 13-1850
ED1: Electricity
IEC 62056-6-2 ED4 Electricity metering data exchange - The DLMS/COSEM suite - Part 6-2: COSEM interface 2022-10
classes digital revenue
IEC 62057-1 ED1 Test equipment, techniques and procedures for electrical energy meters - Part 1: Stationary 2022-06
metering
Meter Test Units (MTU)

IEC 62057-3 ED1 IEC 62057-3 ED1 Test equipment, techniques and procedures for electrical energy meters - 2022-09
Part 3: Automatic Meter Testing System (AMTS)
Status of IEC based standards – step 1

IEC CENELEC publication


Cenelec
« As Is »
General IEC 62052-11 Ed.2 ie EN IEC 62052-11 : 2021
published june 2020 not harmonised published April 2021

IEC 62053-21 Ed.2 EN IEC 62053-21 : 2021


AC -
Active IEC 62053-22 Ed.2 EN IEC 62053-22 : 2021

IEC 62053-23 Ed.2 EN IEC 62053-23 : 2021


AC -
Reactive IEC 62053-24 Ed.2 EN IEC 62053-24 : 2021
published june 2020 published April 2021

DC IEC 62053-41 Ed.1


published june 2021
Status of IEC based standards – step 2

IEC CENELEC Cenelec


publication ✔
harmonised MID
General IEC 62052-11 Ed.2 EN IEC 62052-11 : 2021:A11
EMCD x
published june 2020


IEC 62053-21 Ed.2 EN IEC 62053-21 : 2021:A11 EMCD
AC - ✔
Active IEC 62053-22 Ed.2 EN IEC 62053-22 : 2021:A11 EMCD
Modifications
IEC 62053-23 Ed.2 EN IEC 62053-23 : 2021:A11 ✔
+ Annexes ZA & ZZ EMCD
AC -
Reactive IEC 62053-24 Ed.2 EN IEC 62053-24 : 2021:A11 EMCD ✔

published june 2020 published july 2021


DOW : may 2024

DC prEN IEC 62053-41 : 2021 x


IEC 62053-41 Ed.1 EMCD

published june 2021 Approval stage


Direct integration of
Annexes ZA & ZZ
Status of harmonization work

x • ENQ vote End of October 2021


EMCD
EN IEC 62052-11 : 2021:A11 • Country and HAS comments will be validated during
next meeting CLC TC 13 WG01
• Availability expected in July 2022
• DOW is currently set to January 2023 but will
probably shift once we’ll move forward

• Wait for publication of validation of EN IEC 62052-


prEN IEC 62053-41 : 2021 EMCD
x 11 :2021/A11
• Some minor modifications to be done for HAS
Approval stage
validation
Status of European standards

2006 2017 x
2021

MID MID EN IEC 62052-11 MID
General EN 50470-1 EN 50470-1:A1 x :2021:A1 x
EMCD EMCD EMCD


MID
EN 50470-1
EMCD ✔
x
AC Electro- MID MID ✔
EN 50470-2 EN 50470-2:A1 MID
mechanic EN 50470-2:
Amdts for
confirmed per vote,
safety no revision
standard revision
62052-31
AC Static EN 50470-3 EN 50470-3:A1 EN 50470-3 : 2021 ✔
x MID
MID MID based on
62052-11 in progress -

DC Pr EN 50470-4 ?
MID
New project
Status of harmonization work

• ENQ vote End of October 2021


EN 50470-3 : 2021 ✔ • Country comments will be validated during next
MID meeting CLC TC 13 WG01
• Final draft for FV planned for end of 2021
• Availability expected in July 2022
• Date of withdrawal in JOUE : February 2023

MID
EN 50470-1 • No revision , confirmed per vote,
EMCD ✔ • Date of withdrawal in JOUE : February 2023

MID
EN 50470-2:
Overview Work programm CLC TC13 1/2

Standard Title Status

prEN 50470-3 Electricity metering equipment (AC) - Part 3: Particular requirements - Static meters for Under Approval
active energy (class indexes A, B and C)

prEN 50470-47 Electricity metering equipment - Part 4: Particular requirements - Static meters for DC Under Drafting
active energy (class indexes A, B, C)

EN IEC 62052- Electricity metering equipment - General requirements, tests and test conditions - Part 11: Under Enquiry
11:2021/prAA Metering equipment

prEN IEC 62052-31 Electricity metering equipment (AC) - General requirements, tests and test conditions - Under Drafting
Part 31: Product safety requirements and tests

prEN IEC 62052-41- Electricity metering equipment - General requirements, tests and test conditions - Part 41: Under Enquiry
ED1:2021 Energy registration methods and requirements for multi-energy and multi-rate meters

FprEN IEC 62053- Electricity metering equipment - Particular requirements - Part 41: Static meters for DC Under Approval
41:2021 energy (classes 0,5 and 1)

prEN IEC 62055- Electricity metering - Payment systems - Part 31: Particular requirements - Static payment Under Approval
31:2021 meters for active energy (classes 1 and 2)
Overview Work programm CLC TC13 2/2

Standard Title Status

prEN IEC 62055- Electricity metering - Payment systems - Part 42: Transaction Reference Numbers (TRN) Under Approval
42:2021

prEN IEC 62056-5-3 Electrcity metering data exchange - The DLMS/COSEM suite - Part 5-3: DLMS/COSEM Under Drafting
application layer

prEN IEC 62056-6-1 Electricity metering data exchange - The DLMS/COSEM suite - Part 6-1: Object Under Drafting
Identification System (OBIS)

prEN IEC 62056-6-2 Electricity metering data exchange - The DLMS/COSEM suite - Part 6-2: COSEM interface Under Drafting
classes

prEN IEC 62057- Test equipment, techniques and procedures for electrical energy meters - Part 1: Stationary Under Approval
1:2020 Meter Test Units (MTU)

prEN IEC 62057-3 IEC 62057-3 ED1 Test equipment, techniques and procedures for electrical energy meters - Under Drafting
Part 3: Automatic Meter Testing System (AMTS)

prEN IEC 62055- Electricity metering - Payment systems - Part 42: Transaction Reference Numbers (TRN) Under Approval
42:2021
New publication IEC/SC77A standards 2021

Standard Title

IEC 61000-3- Interpretation Sheet 1 - Amendment 1 - Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits
2:2018/AMD1:2020/ISH1:2021 for harmonic current emissions (equipment input current ≤16 A per phase)

IEC 61000-3-3:2013/AMD2:2021 Electromagnetic compatibility (EMC) - Part 3-12: Limits - Limits for harmonic currents produced by
equipment connected to public low-voltage systems with input current >16 A and ≤ 75 A per phase

IEC 61000-4-30:2015/AMD1:2021 Amendment 1 - Electromagnetic compatibility (EMC) - Part 4-30: Testing and measurement techniques
- Power quality measurement methods
Work programm IEC/SC77A

Standard Title Publication


date
PWI 77A-2 ED1 IEC 61000-3-17: Electromagnetic compatibility (EMC) - Part 3-17: Limits - Limitation of voltage
changes, voltage fluctuations and flicker for LV generators

PWI TR 77A-3 ED1 Limits- Assessment of network characteristics for the application of harmonic emission limits for
equipment to be connected to LV distribution systems not currently covered by IEC 61000-3-2 and/or
61000-3-12
PWI TR 77A-4 ED1 IEC TR 61000-2-15: <em>Description of the characteristics of networks with high penetration of power
electronics equipment</em>

IEC TR 61000-1-4 ED2 Electromagnetic compatibility (EMC) - Part 1-4: General - Historical rationale for the limitation of power- 2021-04
frequency conducted harmonic current emissions from equipment, in the frequency range up to 2 kHz

IEC 61000-2-4 ED3 Electromagnetic compatibility (EMC) - Part 2-4: Environment - Compatibility levels in industrial plants 2019-09
for low-frequency conducted disturbances

IEC TR 61000-3-10 ED1 Emission limits in the frequency range 2 ... 9 kHz

IEC TS 61000-3-16 ED1 Electromagnetic compatibility (EMC) - Part 3-16: Limits - Limits for currents produced by the inverter of 2020-02
inverter-type electrical energy-supplying equipment with a reference current less than or equal to 75 A
per phase connected to public low-voltage systems
13

You might also like