You are on page 1of 1

Spacing

@0.5mx0.5m
0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.66

0,5m
0,5m
0,5m
0,5m

0,5m
0,5m
0,5m
0,5m
0,5m
0,5m
0,5m
0,5m

Spacing
0,5m

@0.5mx0.5m
0,5m

0,5m
0,5m

0,5m

0,5m

0,5m

0,5m

0,5m

0,5m
0,5m

0,5m

0,5m

0,5m

0,5m

0,5m

0,5m

0,5m
0,5m 0,67m

REPUBLIC OF THE PHILIPPINES PROJECT TITLE & LOCATION: SHEET CONTENT: PREPARED BY: SHEET NO.
PROVINCE OF AURORA REVIEWED & CHECKED BY: APPROVED BY:
REHABILITATION OF CEILING
LOCAL GOVERNMENT UNIT ANGEL JOE O. BERNARDO MR. MARLON G. AMAZONA
OF SAN LUIS MULTI-PURPOSE BUILDING JOIST ENGR.DIOSDADO G. ESPAŇA
OFFICE OF THE MUNICIPAL ENGINEER Brgy. Ditumabo, San Luis, Aurora Technical Staff Municipal Engineer Brgy. Captain

You might also like