Office of the Municipal

Engineer
INFRASTRUCTURE PROJECTS
ACCOMPLISHMENT REPORT

JANUARY - DECEMEBER, 2019


INFRASTRUCTURE PROJECT
`
JANUARY –DECEMBER 2019
By CONTRACT

BARANGAY ELECTRIFICATION BARANGAY WATER SYSTEM


San Luis, Aurora
San Luis, Auroa
₱ 853,160.00 ₱ 897,840.00
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY – DECEMBER 2019
By CONTRACT

CONSTRUCTION OF WATER SYSTEM IMPROVEMENT OF WATER SYSTEM


Brgy. Bacong, San Luis, Aurora Brgy. Diteki, San Luis, Aurora
₱ 998,325.00 ₱ 997,500.00
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY – DECEMBER 2019
By CONTRACT

CONSRUCTION OF WATER SYSTEM REHABILITATION OF WATER SYSTEM


Brgy. Zarah, San Luis, Aurora Proper to Purok 7 L. Pimentel
₱ 999,220.00 ₱ 997,600.00
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY – DECEMBER 2019
By CONTRACT

ADDITIONAL PIPE LAYING FOR WATER


IMPROVEMENT OF WATER SYSTEM SYSTEM
Brgy. Nonong Sr., San Luis, Aurora
Hacienda 1 and 2 Brgy. Nonong
₱ 598,012.25
₱ 498,086.43
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY – DECEMBER 2019
By CONTRACT

CONSTRUCTION OF WATER CONSTRUCTION OF ISOLATION


SYSTEM FACILITY
San Luis, Aurora
Brgy. San Isidro, San Luis, Aurora
₱ 7,996,190.05
₱ 996,801.31
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

eted
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

CONCRETING OF ROAD
Kamias St. Brgy. 03, San Luis, Aurora
₱ 298,245.20
Completed
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

COMPLETION OF CONCRETING OF
ROAD CONCRETING OF ROAD
Susada St., Brgy. 03, San Luis, Aurora Mondala St. Brgy. 02, San Luis, Aurora
₱ 497,484.00 ₱ 796,028.00
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

CONSTRUCTION OF DRAINAGE CANAL CONSTRUCTION OF MICRO-HYDRO


Infront of INC
Brgy. Nonong Sr., San Luis, Aurora Dibanga Brgy. Dimanayat, San Luis, Aurora
₱ 499,103.92 ₱ 498,842.00
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

CONSTRUCTION OF MULTI-PURPOSE BLDG.


CONSTRUCTION OF MULTI PURPOSE BLDG.
Brgy. Dibut, San Luis, Aurora So. Diotorin. Brgy. Dibayabay, San Luis, Aurora
₱ 997,800.00 ₱ 996,958.68
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

CONSTRUCTION OF MULTI- PURPOSE CONSTRUCTION OF MULTI-PURPOSE


BLDG. PHASE I BUILDING RRTNHS
Brgy. Real, San Luis, Aurora Brgy. San Isidro, San Luis, Aurora
₱ 997,023.15 ₱ 1,997,700.00
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

CONSTRUCTION OF MULTI-PURPOSE BUILDING


CONSTRUCTION OF BOX CULVERT
DNHS Brgy. Ditumabo, San Luis, Aurora So. Ibayo Brgy. L. Pimentel, San Luis, Aurora
₱ 298,800.01 ₱ 997,732.31
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

CONSTRUCTION OF MICRO-HYDRO WEIR/CREST


CONSTRUCTION OF VILLAGE BASE
TOWER STATION CELLULAR SITE
So. Dibanga Brgy. Dimanayat, San Luis, Aurora Brgy. Dimanayat, San Luis, Aurora
₱ 498,985.00 ₱ 1,923,817.15
Completed On- Going
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

COMPLETION OF MULTI-PURPOSE BLDG


DIKAPINISAN NATIONAL HIGH SCHOOL
Brgy. Dikapinisan, San Luis, Aurora
₱ 198,800.00
Completed
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

FLOOD CONTROL DREDGING CAUNAYAN RIVER


Brgy. L. Pimentel, San Luis, Aurora
₱ 697,700.00
Completed
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT
PURCHASED AND INSTALLATION OF
MUNICIPAL STREET LIGHTS WITH DECORATIVE
POST FLOOD CONTROL
San Luis, Aurora So.Diotorin Brgy. Dibayabay, San Luis, Aurora
₱2,170,000.00 ₱ 98,000.00
Completed Completed
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

CONCRETING OF ROAD CONCRETING OF ROAD


España- Novicio VT Querijero St.
Brgy. Zarah, San Luis, Aurora Brgy. San Jose, San Luis, Aurora
₱ 797,034.54 ₱ 497,946.19
On- Going On going
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

CONSTRUCTION OF MULTI-PURPOSE SSF BUILDING


NHA Brgy. Nonong Sr., San Luis, Aurora
₱394,127.560
On-Going
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

COMPLETION OF MULTI-PURPOSE BLDG.


So Dau Brgy.Zarah, San Luis, Aurora
₱ 346,997.03
Completed as per Inspection
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

CONCRETING OF ROAD
(REAL- DININGLIAN FTMR)
San Luis, Aurora
₱ 1,996,210.58
On-Going
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

REHABILITATIONOF DIABOYO-DIALATNAN FTMR


San Luis, Aurora
₱ 1,997,595.16
On-Going
INFRASTRUCTURE PROJECT
`
JANUARY-DECEMBER 2019
By CONTRACT

Rehabilitation of/Improvement of SB Bldg. and Conts. Of Children Library


Brgy. 02, San Luis, Aurora
₱ 177,531.21
Completed
BIDDED AND AWARDED INFRASTRUCTURE
` PROJECT 2019

PROJECT / DESCRIPTION LOCATION PROJECT COST


1. CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. DIBUT ₱500,000.00

2.COMPLETION OF MULTI-PURPOSE SC BUILDING BRGY. 02 ₱ 200,000.00

3. EXTENSION OF MULTI-PURPOSE SC BUILDING BRGY. 04 ₱ 500,000.00

4. SPRING DEVELOPMENT BRGY. DIMANAYAT PROPER ₱ 500,000.00


5. WATER SYSTEM DEVELOPMENT BRGY. DIBALO ₱ 200,000.00
6. COMPLETION OF BRGY. HEALTH STATION BRGY. DIKAPINISAN ₱ 1,000,000.00
7. COMPLETION OF MULTI-PURPOSE BLDG. RRTNHS BRGY. SAN ISIDRO ₱ 900,000.00
DBP LOAN PROJECT
` 2018

PROJECT / DESCRIPTION LOCATION PROJECT COST


1. Construction of Water System for theBarangay’s of
Nonong Sr., San Isidro, Bacong and San Jose
Lot 1: Drilling, Electrical House and Power House Brgy. Nonong PHP 6,548,500.00
Winsfort Construction and Development
100 %Completed
Construction of Water System for theBarangay’s of
Nonong Sr., San Isidro, Bacong and San Jose
Nonong Sr., San Isidro, Bacong
Lot 2.Pipe lines Php 18,241,750.00
and San Jose
EDFROBON Construction Services Inc.
95.41% completed
Establishment of Municipal Park with Construction
of Municipal Gymnasium
Brgy 02, San Luis, Aurora 42,991,888.97/On-Going
Lot 1: Construction of Multi Purpose Gymnasium with
Landscaping and Childrens Outdoor Playground
Establishment of Municipal Park with Construction
Brgy 02, San Luis, Aurora
of Municipal Gymnasium
3,195,000.oo/Completed
Lot 2: Construction of Pipe Culvert
DILG Funded/BFAR
`

PROJECT / DESCRIPTION LOCATION PROJECT COST


2,996,750.01/Completed
Construction of Fish Port So. Diotorin, San Luis, Aurora
As Per Inspection
Local Access Road-Local Road Rehab.
Brgy. Dibut, San Luis, Aurora 3,300,000.00/Completed
/Improvement

Brgy. San Isidro,San Luis, Aurora


Local Access Roal – Local Road Upgrading 3,600,000.00/Completed
`
MUNICIPAL ENGINEERING OFFICE EMPLOYEE
JANUARY- DECEMBER 2019

NUMBER
PERMANENT EMPLOYEE (17)
Municipal Engineer 1
Technical Staff 2
Admin Personnel 4
Water System Operation & Maintenance 3
Heavy Equipment Operator 4
Construction Fieldmen 3
DETAILED TO MUNICIPAL SOLID WASTE MANGEMENT OFFICE 1
DETAILED FROM MAYOR’S OFFICE 1
DETAILED FROM M.D.R.R.Office 1
`
MUNICIPAL ENGINEERING OFFICE EMPLOYEE
JANUARY- DECEMBER 2019

NUMBER
CASUAL EMPLOYEE (5)
Heavy Equipment Operator 1
Technical Staff 2
Fieldmen 2
JOB ORDER (8)
Office Clerk 1
Technical Staff 1
Heavy Equipment Operator 2
Fieldmen 3
Office Security Guard 1
TECHNICAL AND MANPOWER ASSISTANCE TO OTHER
DEPARTMENTS (By
` Administration)
JANUARY – DECEMBER 2019

PROJECT / DESCRIPTION LOCATION


1. CONSTRUCTION OF BAMBOO ARC for the SAN LUIS 60th
Founding San Luis, Aurora
Anniversary
Municipal Plaza, Brgy.02, San Luis, Aurora
2. CONSTRUCTION OF DETACHABLE MUNICIPAL STAGE
TECHNICAL AND MANPOWER ASSISTANCE TO OTHER
DEPARTMENTS (By
` Administration)
JANUARY –DECEMBER 2019

PROJECT / DESCRIPTION LOCATION

3. RETURN OF TABLES & CHAIRS Maria Aurora, Aurora

4. DEMOLITION OF BAMBOO ARC Poblacion, San Luis, Aurora

5. DEMOLITION OF DETACHABLE MUNICIPAL STAGE Municipal Plaza, Brgy.02, San Luis, Aurora

6. RETURN OF STEEL FABRICATED STAGE Ditumabo National High School

7. REMOVAL OF DECORATIVE STREET LIGHTS Poblacion, San Luis, Aurora


TECHNICAL AND MANPOWER ASSISTANCE TO OTHER
DEPARTMENTS (By
` Administration)
JANUARY- DECEMBER 2019

PROJECT / DESCRIPTION LOCATION

8. FABRICATION OF 2 Sets of TABLE TENNIS BOARD San Luis Central Shool

9. REPAIR OF BOY SCOUT COMFORT ROOMS Camp Cesar, Baler, Aurora

10. SEALING OF OFFICE WINDOW Municipal Accounting Office

11. INSTALLATION OF ELECTRICAL WATER PUMP ASCOT Dormitory, Baler, Aurora

12. MAINTENANCE OF SAN LUIS WATER SYSTEM BRGY’s. 02, 03 & 04


TECHNICAL AND MANPOWER ASSISTANCE TO OTHER
DEPARTMENTS (By
` Administration)
JANUARY – DECEMBER 2019

PROJECT / DESCRIPTION LOCATION


15. Construction of Aurora Day Booth San Luis, Aurora
16. Improvement of Municipal Treasury Office San Luis, Aurora
17. Construction of Drainage Canal and Cross Drainage Bernabe Village, Brgy. Nonong Sr.
18. Installation of Electrical Water Pump Diteki Elementary School
19. Repair of Water System Senior Citizen Building, Brgy. 02
20. Repair and Installation of Water System Diotorin Elementary School
21. Repair of Water System Brgy. Hall, Brgy. 02
22. Repair of Water System MedTech Office
23. Installation of Electrical Water Pump R. Tangson National High School
24. Repair of Water System Training Center, Hacienda Nonong SR
TECHNICAL AND MANPOWER ASSISTANCE TO OTHER
DEPARTMENTS (By
` Administration)
JANUARY – DECEMBER 2019

PROJECT / DESCRIPTION LOCATION


25. Ground Preparation During Nutrition Month San Luis, Aurora
26. Fabrication and Installation of Giant Christmass Tree Municipal Plaza San Luis, Aurora
27. Installation of Christmass Light Municipal Plaza Municipal plaza San Liuis, Aurora
TECHNICAL AND MANPOWER ASSISTANCE TO OTHER
DEPARTMENTS (By
` Administration)
JANUARY – DECEMBER 2019
13. CLEARING OF NATIONAL & MUNICIPAL ROAD
( Brgy. 01 to Brgy. 04 ,Brgy. Diteki, Brgy. Ditumabo,Brgy. Nonong Sr.,Brgy. Zarah, Brgy.San Isidro, Brgy. Bacong,Brgy. San Jose & Brgy. Real )
TECHNICAL AND MANPOWER ASSISTANCE TO OTHER
DEPARTMENTS (By
` Administration)
JANUARY – DECEMBER 2019

14. CONSTRUCTION OF MUNICIPAL PLAZA PAVEMENT - Municipal Plaza, Brgy.02, San Luis, Aurora
OTHER OFFICE ACCOMPLISHMENT REPORT
(FOR THE ISSUANCE OF
` BUILDING PERMITS)
JANUARY- DECEMBER 2019

NO. OF PERMIT
TITLE AMOUNT
ISSUED

A. RESIDENTIAL 210 ₱ 139,856.70

B. AGRICULTURAL PERMITS
1 ₱ 20,086.89
( Ground Preparation & Excavation )

C.EDUCATIONAL/ INSTITUTIONAL 3 0

D.COMMERCIAL 10 ₱ 57,467.68

TOTAL = ₱ 217,411.27
ELECTRICAL ACCOMPLISHMENT REPORT
(By Administration)
`
January- DECEMBER 2019

PROJECT / DESCRIPTION LOCATION

1. Electrical Works Municipal Grounds

2. Clearing of Electrical Line Coastal Barangay

3. Meter Reading Every last week of the month Dibalo to Dikapinisan San Luis, Aurora

4. Water Pump Operator San Luis Water System


TECHNICAL AND MANPOWER
` ASSISTANCE
JANUARY – DECEMBER 2019

Number of Program of Works & Plans

National 7

Local Government Unit


42

Barangay’s 56

School’s 24
Heavy Equipment Accomplishment
` Report
JANUARY –DECEMBER 2019
PROJECT / DESCRIPTION / LOCATION
A. Maintenance of roads at different Barangay’s of the Municipality as request and approved by the LCE.
1. Opening of Dibalo – Kalapnit Road.
Heavy Equipment Accomplishment
` Report
JANUARY- DECEMBER 2019

2. Clearing and Demolition Works along National Road and Primary & Secondary Road.
Heavy Equipment Accomplishment
` Report
JANUARY- DECEMBER 2019

3. Demolition of Perimeter Fence at Municipal Plaza


Heavy Equipment Accomplishment
` Report
JANUARY – DECEMBER 2019

4. Assist in the erection of Street Arc Decors and removal of the Detachable Stage.
Heavy Equipment Accomplishment
` Report
JANUARY – DECEMBER 2019

PROJECT / DESCRIPTION / LOCATION


A. Maintenance of roads at different Barangay’s of the Municipality as request and approved by the LCE.

5. Race-truck Construction for the 4x4x and Moto-Cross Competition.

6. Landfill Rehabilitation/ Digging / Excavation.

7. Rehabilitation and Digging Works Municipal Abatoir.

8. Hauling and Grader Works of San Luis Central School Oval in preparation for District Meet.

9. Maintenance to L. Pimentel – Camalatan FTMR

10. Maintenance to Brgy. San Isidro to So. Balitwak Road


Heavy Equipment Accomplishment
` Report
JANUARY – DECEMBER 2019

PROJECT / DESCRIPTION / LOCATION


A. Maintenance of roads at different Barangay’s of the Municipality as request and approved by the LCE.

11. Clearing works to Propose ASCOT Brgy. 2, San Luis, Aurora.


12. Maintenance to Brgy. Zarah- España Village Road
13. Maintenance to Hacienda- Camalatan Road
14. Maintenance to Bernabe St. Brgy. Nonong, San Luis, Aurora.
15. Maintenance to Brgy. Real Road
16. Maintenance to Barangay Road, Brgy. Real San Luis, Aurora.
17. Maintenance to Barangay Road at Brgy. Diteki, San Luis, Aurora
18. Maitenance to Ditumabo-Diaboyo, Likas Yaman(DL) Road
19. Maintenance to Camalatan Proper Road
20. Construction of Road Opening to Gymnassium Site at Brgy. 02, San Luis, Aurora
Heavy Equipment Accomplishment
` Report
JANUARY – DECEMBER t2019
PROJECT / DESCRIPTION / LOCATION
B. PUBLIC SERVICE
1. Sand & Gravel Donation for the deceased ( Ka Ely Teneza & Felipe Tutor )
2. Fetch the cadaver fom Cagayan province.
3. Transportation service to get the shreading machine as requested by the Municipal Agriculture Office (MAO)
and SWM Office.
4. Haulling of various materials as requested by Tourism Office in preparation for Fiesta Celebration.
5. Transportation service of Schools during Fiesta and district meet from coastal areas.
6. Transportation service in returning the band instruments to Pasig City as requested by MCSSL.
7. Transportation service of scouts BSP and GSP during Provincial encampment at Camp Cezar S. Valenzuela
and Army Camp at Barangay Calabuanan Baler, Aurora.
8. Trasportation service of students from Ditumabo National High School and R. Tangson National High School
for medical check-up at RHU San Luis.
Heavy Equipment Accomplishment
` Report
JANUARY – DECEMBER t2019

PROJECT / DESCRIPTION / LOCATION


B. PUBLIC SERVICE

9. Transportation service to get various goods from DSWD Regional Office.


10. Transportation service during Aurora Foundation Day Celebration 2019
11. Sand and Gravel Assistance to IRM- Church, Brgy. San Jose Maria Aurora, Aurora (c/o June
Silvestre)
12. Transportation Service for Wedding at Dinalungan, Aurora.
13. Sand and Gravel Assistance to 71st Infantry Division at Brgy. Calabuanan, Baler, Aurora.
14. Gravel assistance to Nonong Elementary School.
15. Gravel assistance to Brgy. 04, St. Mark Chapel.
16. Gravel Assistance to Brgy. Zarah Chapel.
THANK YOU!

You might also like