AMENDED DRAFT POLICY FOR
EXTERNAL ELECTRIFICATION OF
HOUSING SCHEMES / COLONIES
/SOCIETIESTable for Contents
n Lengths
ines for Electrification of Housing
Joad Demand upto 2500 KW
Joad upto 2500 KW
‘System beyond Metering point
Guidelines for Electrification of Housing Societies having ullimate
| toad demand from 2,5 MW 40 1M
‘overable from the Sponsors opting for ind
‘Amount
load 2.5 MW to 10 MW.
‘Amount recoverable from the Sponsors op
| toad 2.5 MW te LO MW
System beyond Metering point
Guidelines for Elect: in of Housin;
| Joad Demand more (han LO MW. ae
‘A= Housing Society having ultimate demand load more than 10 MW
(Construction of Grid station for one point supply) __
B= Housing Society having ultimate demand load more than 10 MW
(System beyond Metering point for Individual Metering)
CG Mousing Society having ultimate demand load more than 10 MW
{System beyond Metering point for One point supply)
D=Housing Society having uitimate demand load more than 10 MW
(System beyond Metering point for Individual Meteri
al metering for
ig lor One point supply for
Societies having ultimate
Design Criteria of Feeders ae
Procedure for Electrification of Housing Sc = aes
Fectrification of Housing Schemes having Individual Metering iW
Procedure for provision of Bank Guarantee Eee
‘Amounts recoverable from the Sponsors Opt 7
for load upto 2500 KW Rees
Amounts recov le from the § is
E= Immediate demand of Housing Societ 33
ergization, Operation and Maintenance 3
References 3
a b=. This self contained guideline will secve as a practical guide for DISCO engi
|. The refer:
Preamble _
In order to streamline the procedures for external electrification of housing colonies /
; societies, a series of instructions had been issued by the Member (Power) WAPDA, General
Manager (Distribution) WAPDA, General Manager (Operation) WAPDA, General Manager
(CRM) WAPDA, General Manager (RED&S) WAPDA, Chief Engineer (Distribution
Engineering) WAPDA etc., in the past. These instructions were subsequently amended by
the concerned offices of DISCOs from time to tinte to update the sare ds per changing
requirements. Ironically these instructions’subsequent amendments did not reach the
concerned personne! and thus remain unimplemented. Presently, some of the DISCOs are
practicing different approaches in this regard after getting approval fron their respective
BoDs.
itis of common knowledge that the SOPs for external electrification of fousing schemes /
: societies / colonies were standardized by WAPDA 25-years back, while dynamics of the
Sector have changed tremendously since then. Consequently, revision afexisting policy is
badly felt,
. In response to various queries raised by HESCO and to bring uniformity anong all DISCOs
in this regard, a series of meetings and consultative discussions / session were held with
coneemed technical officers of all DISCOs / NTDCL and existing poicy for external
electrification of housing schemas! societies has been revised / consolidated in the form ofa
booklet.
gers who are
rial elecisification of housing schemves hocieties. tt will
garing the design of extemal electrificiien of housing
the design of
also facilitate the consultants for pr
sch
ses of instructions imparted from time to time by the WAPDA/PEPCO authority
he
have also been appended her
ce only for preparation of the company
. schemes { colonies / societies, while
Incorporating specific loca! requirements, if néeded. Implementation of the sane in the field,
however, will be affer approval or ratification by the respective BODs of DISCOs.
‘As PEPCO coordinated with all the DISCOs and has provided technical support for
preparation of 2 draft of uniform policy / guidlines on the issue, the draft SOPs may not be
considered as any specific direction from 1 igement company and the final document,
2 fimed-up as a DISCO SOP, thus warding-off any possible future legal complications for
PEPCO.
This draft SOP is required to be taken as gu
‘cific SOP for external electrificati
General Manager (Tecliical Services)
PEPCODocuments to be submitted by the Sponsors
sponsor fram owners of land
> Photo copy of consultant's
registration certificate with
P.E.C duly renewed for the
current year
> Geographical site sketch
+ (0 copies) of
sponsor duly attested
> Authority letter from sponsor in
2m of constiltant
ered &PEPCO
tant as per
PEPCO's instructions contained in
this SOP
[For Individual Connections For One Point Supply
T. Approval from respective T._ Approval from respective Development
Development Authority / Town Authority / Town Management/Cantonment
Managemenit/Cantonment Board/Concerned Civie Authority. This
Board/Concerned Civic Authority. includes:
This includes: + Approval letter
+ Approval fetter + Approved master plan of society with
© Approved master plan of sanction letter *
society with sanction letter * 2. Application for load along with following
2. Application for load along with documents:
| following documents: > Proof of ownership, registry, original fresh
> Proof of ownership, registry, ard :
original fresh fard > “Power of attorney in favor of sponsor fiom
> Power of attorney in favor of owners of land
Phota capy of consultant’sregistration
certificate with P.E.C dulyrenewed for the
current year
> Geographical site sketch
> OM. Ge copies) of ponsor duly
ted
ity letter from sponsor in favour of
consultant
License from NEPRA for distribution of
ower (as pet NEPRA Regulations, 2015 for
1 issued vide SRO No. 1134
lead demand of 0M\V and
Approval from NEPRA for 0& M
agreement (as per NEPRA Regulations, 2915
for sale of power issued vide SRO No.1 134
(12015).
4. Design of external electrification duly
prepared by PEC registered &
PEPCO!DISCO approved conuultant as per
PEPCO’s instructions contained in this SOP.
E:~ “Note: Defore processing applications for external electrification of housing sociaies, clearance
from all concerned civic (development)
thorities must be obtained.
4 eeStandards & Design Criteriarated capacity.
Load Assessment Criteria
‘The consultant will work out detail of plots to be fed froni each distribution transformer according
to load criteria, The assessed load on each distribution transformer should not exceed 80% of its
Load Criteria for Cities, Dist. HQ Level, All Cantonment Areas
= Componsnis ": Not] wants [feet My _| Total Load (kW)
2 [aioe qe} ao —} a a
[Ceiling Fans 20 #0 1.600 DAR
(teens SES ane =
% | Ondinary Plugs 25 100] 2.500 073
- Power Plugs 6 1000 6.000 T 6.00,
Ee altaCe 6 1500 9.000 | 9.000
oral Lox Tr 1W
= Components wo. | wars | ay | pacman, [-terat Load (KW)
2 | LightPoinis oy wo 3.200 30 036
| [Geling Fans [16 30, 1280. 30 tas
E [esas Fans 7 30 1.560 30 0.17
3 [ordinary Pluss 20 100 | 2.000 30 0.60
2 [Power Pugs 4 1000 | 4.000. 700 4.00
ACE 3 1500 —| 4.500. 700 450
Total Load) Tae kW
= = Total mand :
z Components I a
2 [Tiga Pome a oo |___ 30
= [ailing Fane tis60 3a
[exnsusi Fans 0.480 30
% [Ordinary Plugs [1.550 3
2 [Power Plugs 2.600 100
ACS nn Ta
e Gankw —]
q Components no | was) | ivy [pommel | Totat Lona (Rsv
2 [ogra [enioad aan as |S Laoo 3 aa
[siting Fane §_ 960 Fl 019
£ shaun Fans 6 si | 0.480. 0 Ola
2 [Ordinary Plugs: 10 109 [7.000 30
2 Power Plugs 7 1009 2900) 1007
[acs [emiaeafematsea es) eat stor tee
Tort Land
= emery Se oss ae | eee aca
2 [Eight Poiras a Osi) 30 Dey
5 :
i aan i 7a 3 Tiree
& [Exsaus Fans jes 0.160 30 003]
= —[ortinanFlagt ae 7 a
= [Power Pes TH | 1.000 To 10)
ACs 1590 [1.00 1 150
Total Lawl Sasi
ification of HoukNy Schem2s
\ce
lah {Load Criteria for Commercial Centers
oe Description sae
Banks, Office Buildin; 5
Beauty Parlors, Hair Saloons. 4
Schools, Mosques aa
Shops, Hospitals, Clubs, Community Centres, Restaurant, Flotels, Motels, Court
Rooms
Lodges 1.5
Auditoriums, Masjid, Church 1
Garages, Corridors 0.5
Ware-House Storage, Play Ground : 0.
2:
Fan Load, TV, Refrigerator, Deep Freezer 2
Air Conditioning Load 3
Note: Load of other provisions like escalator:
demand.1, Development Factor
2. Diversity Factor = 125%
3. Power Factor : = 85%
4, Location F
ctor (Big City) = 100%
5. Location Factor (Small City) = 80%
U.LD =
Diversity Factor
U.LD =
ate Load Demand
Loading of T/F may be kept within 80 %
© Big City = Dist, 11Q.Cantonment Boards
© Sinall City = Tehsil, Sub Tehsil & UC a
ministration,
Ye .
\a
Draft SOP for electrification of Housing Schemes. Page-7Design Criteria for Over Head Network
Residential plots of 2 Kanals & above are to be fed from 200 kVA distribution transformers
& 3 Marlas must be supplied electricity
Residential plots of | Kanal, 10 Marlas, $ Mark:
from 200/100 KVA distribution
For main 11 kV circuits ACSR conductors will be used (HT conductors and cables be
\sformers with ratio of 2:3
provided strictly in accordance with their rating not more than 80% loading)
For LT fines Wasp & Ant conductors will be used (LT conductors and cables be provided
strictly in accordance with their rating not more than $0% loading)
Length of LT line must not exceed $00 feet :
Maximum 6 No, services to be tapped: from one structure / pole, Every connection must be
given through independent service.
Independent transformers of appropriate capacity shall be used for street light & for tube
wells, The load for street light shall be accessed and incorporated in the design.
246
Two separate earths shall be provided for every distribution transformer, one for neutral and
Every HT/LT steel structure shall be earthed as per SDI No.PTW/D!
other for the body of transformer as per SDI No.PTW/DF-254
‘The approved design shall remain intact till completion of the project provided the design
vetting charges are paid within a period of one month,
Standard De
in poles shall also be earthed as per lat: Instructions.
seJ on the basis of
ings, load will be re~
ion will be processed acccrdingly.
2 Load of a1 | buildi will be a:
single-stery design. However, in
assessed as per actual covered areaDesign Criteria for Underground Network
Residential areas are to be fed from 200kVA & 400kVA pad mounted transformers and
commercial areas/high-rise buildings from 400KVA & G30KVA transformess depending
upon the acttial covered ares
HT and LT cables 10 be provided strictly in accordance with their rating net more than 60%
loading.
Sizes of HT Single Core cables (¢.g. 240mm?, 120mm*) & LT cables shall be strictly in
accordance with NTDCL/DISCO specifications.
Single phase 63 kVA pad mounted transformers shall be used for street lighting. The load
for street light shall be accessed and incorporated in the design.
Every steel enclosure and pole shall be earthed.
Three separate earths to be provided for every pad mounted transformer.
The approved design shall remain intact till completion of the project provided the design
vetting charges are paid within a period af one month.
Design of underground electrical power distribution system shall be strictly in accordance
wetions (SDIs).
‘DD
with following Standard Design,
«Standard Design Instruction No.
Load of commercial buildings located in scheme will be assessed on the basis of
single-stéry design, However, in case of mult
storied commercial buildings, load will te re~
assessed as per aciual covered a ion will be processed accordingly.Design Criteria-Maximum Span Lengths
Single Circuit Double/Triple Cireuit__ |
366 ft. Steel Structure 36 ft. Spun Pole 45 ft. Steel oO
200 ft. 200 ft. 200 ft. |
200 ft. 2008. 200 f.
200 ft. 200 ft. 200 nt.
|
Wee ;
{yn
\4% a) ) dy
Clg Mp
7 « @
Otajt SOP far Eiectrification of Housing Schemes 10pPu
©
$Guidelines for Electrification of
Housing Societies Having Ultimate
Load Demand upto 2500 kWDesign Criteria of Feeders
For Load upto 2500 1\¥
For an ultimate toad demand upto 2S00-K\V, supply of power shall be proposed ftom the existing
nearest 11 KV feéder with the assurance that its voltage drop and technical losses will remain within
permissible limits of 5% and 3.5% (kW loss) respectively.
If the voltage drops and technical losses of the ting 11 kV feeder from which the electrification is
proposed are within permissible limits and remain within permissible limits even with simulation of
the ultimate load demand, the proposed load shall be accommodated.
If the voltage drops and technical losses of the existing 11 kV feeder from which the electrification is
proposed, are within permissible limits: before simulation of the toad demand of the scheme but
exceeds the permissible limits when analyzed the ultimate load demand, then rehabilitation of the
feeder shall have to be done. The sponsor shall pay the cost of rehabilitation in a way to bring voltage
drop and technical losses within permissible Timits.
If the existing 11 kV feeder from which the load is proposed has percentage voltage drops and
technical losses already more than the specified value, analysis may be made With the consideration
of feeding the proposed load through augmentation / renovation to bring down the voltage drops and
technical losses within permissible limits. The sponsor shall pay the cost of rehabilitation on cost
sharing basis in a way to bring voltage drops and technical losses within permissible limits. His cost
share will be to compensate for Pee in voltage Beis and power loss percentages arising out of the
" on DISCO's part. The physi
ltation of the system under DISCO program eee not i made a pre-requisite because DISCO
its own program to follow, as t! sg time to fully develop. *
housing soci
er (along
if opted for the same on
t of allied material and
Power supply can be given from ind.
full-cest deposit basis with cost of a end circi
installation, tes!
ye
Srajs SO? for Electrification of Housing SchomssProcedure for Electrification of Housing Socicties
1. Sponsor / Consultants shall submit proposal of design to Chief
cutive officer /
Chief Engineer (P&E) of DISCO alongwith all requisite documents mentioned at page
No.3 of this SOP.
(P&E) Department of Dt
‘O will carry out scrutiny and vetting of proposal ay per
standard and design criteria.
3. The sponsor will opt about
cution of external electrification through DISCO lor
private execution through PEPCO / DISCO/ ESCO approved contractors, “The
contractors shall not be the same as the consulting Engin:
4. Recovery of charges as mentioned in this SOP.
5. Technical clearance will be issued by the respective Chief tngineer (Planni
Engineering) DISCO alter approval by the CEO and fulfillment of all formalities.
6. The Housing society is defined as per NEPRA Eligibility criteria.
7. The policy for electri
ation of High Rise buildings / Plazas and apartments
situated other than the Housing Societies shall be the same as within the Housing
society/ scheme /colony.
Veo tS
Draft SOP for electrification of Housing Schemes. Page-13Electrification of Housing Schemes Having Individual Metering
Sponsor opting for private execution through
PEPCO/ DISCO approved contractors
Sponsor opting for construction through
PEPCO / DISCO
Sponsor will submit Bank Guarantee @ 23% of total
electrification cost valid up to the completion of
electrification work .& this will be released on
BI successful completion & inspection of the network.
, Sponsors of the scheme will bear full responsibility
for procurement and installation of quality material
as per NTDCL/DISCO approved specifications from
the manufacturers approved by PEPCO/ DISCO.
The material shall be duly inspected by Chief
Engineer (Quality Assurance & Inspection) NTDCL
or DISCO’s representatives.
. Sponsos will not purchase / use any material
bearing DISCO's monogram or DISCO's colour
scheme or identification,
|. NIDCU/ DISCO Standard Design & Specifications
will be strictly followed.
‘The sponsor will give advance information to
S.E/XEN concerned for starting the work.
. Ih case DISCO matzrial is found installed, DISCO
reserves the right to lodge FIR against the spensors.
. Coleur cade ofthe followi items of
J material will be
Transformers Blue’
. Spun Poles /Structures “Blue”
(1 foot wide strip at a height of 19 ft from ground
level.)
. Conductar Reel “Red”
3. Right-of-Way is the responsibility of sponsor and in
case of any problem, estimate will be revised &
difference will be paid by the sponsor.
. Sponsor's name & name of the‘schenie shall be
embossed on structures/Spun_poles/transformers!
meters/conductor reels.
All PO's shall be veited by the Pet
tion of
material will undergo’stage & final
inspection by Chief Engineer (Quality Assurance &
Inspection) NTDCL or DISCO's representatives.
. Consultant will submit completion report, a3 built
map depicting proper inventory &° equipment
installed comparing it with approved BOG i
fi
Draft SOP for stectrfication of Qousing Schergel wy
1, The sponsor shall deposit the estimated
cost with Chief Financial Officer (CFO)
DISCO. CFO will issue credit advice to
Project Director (Construction) for
execution of work under intimation to
Chief Engineer (P&E).
Committee comprising Manager
(Operation) concemed & Manager
(Material Management) shall watch the
progress & quality of work on regular
basis in association with the consultant
of the sponsor.
Right of Way is the responsibility of
sponsor and in case of any problem,
estimate will be revised & difference
will be paid by the sponsor.
cS
=>
Pysponsor opting for private execution through
PEPCO/ DISCO approved contractors
F13. Committee comprising Manager (Operation)
coficemed, Manager (Material Management) of
DISCO, in association with the representatives
of consultant, sponsor and of the contractor,
will check the completed work/documentation
& inventory before declaring it safe &
authorizing for energization of the Housing
Scheme :
The sponsor will keep and pass on. the
following record to DISCO while procuring
material.
a. Purchase Order showing name of
manufacturer; quantity, type, make, cost and
equipment identification.
b. Invoice bearing the name of the sponsors
with cost of material and sales tax paid.
. Spun poles installed in the housing society will
bear the following markings embossed on wet
concrete.
Initial letter of Housing Scheme
Short initials of the place of the Scheme.
Initial of the manufacturer
Serial No. of Pole (Separate Sr. No. fo
order and cach type of pole).
e. Date of manufacturing
sere
B50 for recto of
ft
b
Sponsor opting for consiruction through
PEPCO / DISCO
15/
-— -procedure for Provision of Bank Guarantee Equivalent to 25% of the
Entire Estimated Cost
f(a) In ease Sponsors desire to carry out work through PEPCO/DISCO approved coniractor, they
will submit a Bank Guarantee equivalent to 25% of total electrification cost, valid for the entire
period upto completion of full electrification work of the scheme.
K(b) In case of large scale schemes, external electrification of a housing schertie approved by a Civic
Authority may be allowed to proceed in phases provide
i) Area included in a phase will be contiguous and ultimate load demand of each phase
will be above SMW. Complete plan for electrification of scheme will be submitted
through the Consultant,
_ ji) Phase-wise clectrification will be allowed only if the Housing Scheme has
provided/mutated suitable land for a Grid Station to the DISCO.
ii) The Sponsors of the Housing Scheme will provide Bank Guarantee equal to 25% of
the estimated cost of electrification for the phase that they intend to electrify at one
time. Alternatively mortgage af plots of equal value of 25% of the estimated cost of
electrification for the phase intended to be electrified may also be acceptable.”
However, comprehensive policy/procedure for the mortgage will be determined by
the respective DISCO after due consideration of procedures adopted in similar cases
by Lahore Development Authority (LDA) or other equivalent institutions /regulatary
authorities,
i) DISCO will also obtain a the Sponsors or gign an -
agreement with Sponsors of large Housing Schemes agreeing expressly fo the terms
and conditions for th: splitting up of the-Housing Scheme into phasesas stated above
so as to avoid any legal complizations at a faier staze,
¥) On the satisfactory completion of each phase, the work will be duly inspected and
taken over for the purpose of grant of connections. Connections will te allowed only
in the area Calling in tie par phase which has been electrified and the network
taken over by a DISCO. This, in ro way establish the right of the Spensar of
prospective consumers to get connections in other phases of the Housing
Schemes where electrification is yet to be undertaken or the network has not been
taken over by the DISCO due to any reason.
(c) Bank Guarantee to be submitted by the sponsoring agency before getting approval for execution
af the work through PEPCO/DISCO approves, Contractors may be released observing the
following procedure.
“The Guarantee shall be released in phases on successfirl completion of the part of the systent
by the Sponsoring Agency duly verified by the inspection committee nominated in the SOP. The
telease of Guarantee shall te worked aut on proportional cost basis for the completed work
against the total work”.Amounts Recoverable From the Sponsors Opting for Individual
Metering for Load Upto 2500 kW
Sponsor opting for private execution throng
PEPCO/DISCO approved contractors
T, Design vetting charges @ 1.5% of eapital cost
for external clectrification of housing society /
colony.
. Inspection & supervision charges @ 1.5% of
capital cost for external electrification of
housing society / colony
I3. Grid sharing cost @50% from sponsors of
holising societies.
{@ Rs. 4,990 per kW)
i, Bank Guarantee @ 25% of total estimated cost
fot external electrification of housing soviety /
colony.
ls. Rehabilitation charges in cast of mixed load
feeder & total cost of feed line for independent
feeder along with cost of grid end breaker etc.
. Material inspection charges @ 2.52:
be paid by the individual
prospective consumers at the time of obtaining
connections.
Sponsor opting for construction through
PEPCO/DISCO
T, Capital cost for external clecirification of
housing society / colony.
2. Design vetting charges @ 1.5% of capital cost
for external electrification of housing society /
colony.
Grid “sharing cost @50% from sponsors of
housing societies.
- @ Rs. 4,900 per kW)
5. Rehabilitation charges in case of mixed load
feeder & total cost of feed line for independent
feeder along with cost of gridend breaker etc.
6. Security will be paid by the individual
prospective consumers at the time of obtaining
connections. - :
follows:
> _Rs. 0.955 Million per MW a
Draft SOP for Electification of Housing
The sharing cost of construction of the grid station and transmission line has been assessed as
> Rs. 8.948 Million per MW of as cost of Grid Station and Transmission Line
cost of land,
|f, mount Recoyerable from the Sponsors Opting for One Point Supply
for Load upto 2500 kW
§, PEPCO/DISCO approved contractors
B The sponsor will furnish bank guarantee @
B 25% of estimated cost of electrification of
E housing society.
Design vetting charges @ 1.5% of total
capital cost of electrification of housing
society.
E taspection & supervision charges @ 1.5%
"EE of capital cost of electrification of housing
society.
Material Inspection charges @ 2.5%
Bf Grid Sharing cost @ 50% from sponsors of
E. housing societies (@ Rs. 4,900 per k\V).
Security for the total ultimate demand
(as per relevant tariff approved by NEPRA).
Rehabilitation charges in case of mixed load
feeder & total cost of feed line for
independent feeder along with cost of grid
end breaker etc.
. Sponsor will ensure procurement of
as ‘per’ NYDCL! ° DISCO
ations & design.
Sponsor will ensuré procurement of
roved
Material from PEPCO/ DISCO a
manufacturers/suppliers and duly ins;
by Chief Engineer (Quality Assurance &
Inspection) NTDCL or —DISCO's
representatives.
Sponsor opting for construction through
PEPCO/DISCO
Capital cost for external electrification of
housing society/colony.
Design vetting charges @ 1.5% of total capital
cost of electrification of housing society.
Grid sharing cost @50% from sponsors of
housing societies (@ Rs. 4,900 per kW).
Security for the total ultimate demand
(as per relevant tariff approved by NEPRA)
Rehabilitation charges in case of mixed load
feeder & total cost of feed line for independent
feeder along with cost of gridend breaker etc.
Hows:
he sharing cost of construction of the grid station and transmission line has been assessed as
.943 Million per MW of as cost of Grid Station and Transmission Line
'3 Million per MW as cost of Land
i ie 50P for Electrification of Housing Seemes
a WM
sprFa SOP for Electrification of Housing Schemeg
System beyond Metering Point for One Point Supply
‘The sponsors will obtain approval as O&M operator for one point supply for sale of power
from NEPRA (as per NEPRA regulations, 2015 for sale of power issued vide SRO No.
1134(1)/2015)
The system beyond the metering point ie. within the colony area shall te maintained &
operated by the sponsorsO&M operators. The system shall be constructed by the sponsors
through approved contractor/DISCOs (at sponsors’ cost) according to the design approved
by DISCO.
The material shall be purchased ftom PEPCO/NTDCL/ DISCO approved manufacturers.
The procured material will be inspected by Chief Engineer (Quality Assurance &
Inspection) NTDCL or DISCO’s representatives.
Alll purchase orders shall be vetted by the P&E section of DISCOs. The sponsor will get the
design of the internal network, after one point supply approved from DISCO & will pay
design vetting charges @ 1.5 % of total estimated capital cost of the external electrification.
The sponsor will pay @ 1.5% of the total estimated cost of electrification of housing society
as inspection/supervision charges.
.. The sponsor will pay @ 2.5% as material inspection charges:
Sponsors of the scheme will bear full responsibility for the procurement & installations of
quality material according to NTDCL/ DISCO approved specifications,
The sponsor will not purchase’ y material bearing DISCO"s monogram or DISCO's
colour scheme or ides
shall be ¢ Manager (Operati
tor (Construction) DISCO at
Decements relatin;
concerned, Manager (Mate
the time of final inspe:Guidelines for Electrification of
Housing Societies Having Ultimate
Load Demand from 2.5 MW to 10 MW
yy
Draft SOP for electrification of Housing Schemes. Page-20DESIGN CRITERIA OF FEEDERS
For Load more than 2500 KW but tess than 10000 KW
1. If load demand is more than 2500 KW but less than 5000 KW, supply of power shall be
proposed through an independent feeder {rom the nearest grid station on full cost deposit b;
with cost of grid end circuit breaker (alongwith cost of allied material and installation, testing,
commissioning, etc. charges of grid end breaker), in case if grid is in a position to bear the
prospective load, :
2. If load is more than 5000 KW and ess than 10000 K\W, then supply shall be proposed through
number of independent 11 KV feeders as per requirement.
3. In case position of grid station does not permit the ultimate load of the housing society then
urgent load requirement of the housing society may be alJowed alter the recovery of:
© Grid sharing cast on ultimate load demand.
Design vetting charges.
Inspection / supervision c!
*Metcrial inspection ec!
* Capital cost of source fee line and external electrification (if' applicable)
Bank Guarantee (if applicable)
and augmentation/ extension of grid station may be arranged in due course of time at DISCO cost so
4s to meet with ultimate demand of housing scheme,
2es (il applicable).
zes (i applicable)
4. Land for Grid Station,
For load above 05 M\V and upto 10 M\Y, the sponsor shall provide 10 Kansk suitable piece of
land free of cost to IESCO. However in case the foad of the Colony as a result of extension of
the Scheme increases above 10 MAY, then the sponsor will be dealt as per new policy, I the
Sponsor constructs Grid Station at his own cost, then the already recovered Grid Sharing cost
will be adjusted in the cost of Gi
Droft SOP for electrification of Housing Schemes, Page-21,Amount Recoverable From The Sponsors Opting For Individual
Metering — For Load 2.5 MW to 10 MW. =
Sponsor Opting for Private Execution —
through PEPCO/ DISCO approved
contractors
1. ‘The sponsor will furnish bank guarantee @
25% of the total estimated amount of
electrification of Housing Scheme.
2. The Sponsor will construct source feed line
at his cost.
3. Design voting charges @ 1.5 % of
estimated cost of external electrification of
Housing Scheme
4. Inspection and supervision @ 1.5% of
estimated cost of external electrification of
Housing Scheme.
. Grid Sharing cost @ 50% from sponsors of
Housing Societies @ Rs. 4900 per KW.
6. Material inspection charges @ 2.5 %.
7. Security will be paid by the individual
prospective consumers at the time of
obtaining connection.
8. Sponsor will insure procurement of the
material as per PEPCO / NTDCL / DISCO
specification and design.
9. The sponsor will ensure purchase of
material from PEPCO / NTDCL / DISCO
approved manufacturers speci /
stippliers duly inspected by Chief Engineer
(Quality assurance and inspection) NTDCL.
or DISCO,s representatives.
Draft SOP for electrification of Housing Schemes.
; Construction
ough PEPCO/ DISCO.
Sponsor Opting |
th
Capital cost of external electrification of
Housing Scheme.
RP
Cost of independent feeder.
3. Design vetting ch
estimated capital cost of ext
electrification of Housing Scheme.
ges fa) 1.5% of
rnail
4. Grid sharing eo:
of housing. soc
Kw.
tat 50% trom sponsors
ties fw Rs. 4900 per
5. Security will be paid by the individual
prospective consumers at the time of
obtaining connections.
Page-22Amount Recoverable from the Sponsors Opting for One point supply
For Load 2.5 MW to 10 MW.
O&M Agreement (As per NEPRA Regt
lations, 2015 for sale of Power
sued vide SRO No.1134 (1/2015)
Sponsor Opting for Private Exee
ion through
PEPCO/ DISCO approved contractors
1. ‘The sponsor will furnish back guarantee @ 25%
of the total estimated amount of electrification of
Housing Society,
‘imated cost
ciety
2. Design vetting charges @ 1.5 % of
of external electrification of Housit
3. Inspection and supervision @ 1.5% of estimated
cost of external electrification of Housing
Society.
4, Materiaf inspection charges @ 2.5 %.
3. Grid Sharing cost @ $0% trom sponsors of
Housing Societies @Rs. 4900 per KW.
6. Sponsor will construct source (eed line at his cost
7. 100 % Security for the ultimate demand (as per
relevant tariff approved by NEPRA).
8. Sponsor will insure procurement of the material
as per PEPCO / NTDCL / DISCO specification
and design.
9. ‘The sponsor will ensure purchase af material from
PEPCO f NTDCL / DISCO approved
manufacturers specification / suppliers duly
inspected by Chief Engineer (Quality assurance
and inspection) ~NTDCL. or DISCOS
representatives.
Sponsor Opting for Construction
through PEPCO/ DISCO
Design vetting charges a 15% of
estimated capital cost of esternal
electrification of Housing Soci
ital cost of externa! ©
Housing Society/ colony.
ification of
Cost of independent feeder including cost
of Grid end Breaker, ete.
Grid sharing cost sie 30% from sponsors
of housing societies (a Rs. 4900 per KW
100 % Security for she ekimate demand
(as per relevant tariff approved by
NEPRA).
‘The sharing cost of construction of Grid Station and Transmission line has been assessed as follows.
> Rs.8,948 Million / MW of as cost of Grid Station and tewasmission line,
> Rs.0,855 Million / MW as cost of Land.
Draft SOP for electrification of Housing Schemes.
a
Page-23_.....System beyond Metering Point for One Point Supply.
1, The sponsors will obtain approval as O&M operator for one point supply, for sale of power
from NEPRA (as per NEPRA regulations, 2015 for sale of power issued vide SRO No.
1134(1)72015) ae
“The system beyond the metering point iz, within the society/colony area shall be maintained
& operated by the sponsors/O&M operators. The system shall be constructed by the
sponsors/DISCOs (at sponsors’ cost) according to the design approved by DISCO.
3. The material shall be purchased from PEPCO/NTDCLIDISCO approved manufacturers. The
procured material will be inspected by Chief Engineer (Quality Assurance & Inspection)
NTDCL or DISCO's representatives.
4. All purchase orders shall be vetted by the P&E section of DISCO. The sponsor will get the
design of the internal network, after one point supply, approved from DISCO will pay
design vetting charges @ 1.5 % of total estimated capital cost of the external electrification
of housing scheme.
3. The sponsor will pay @ 1.5% of the total estimated cost of electrification of housing society
as inspection/supervision charges.
5. The sponsor will pay @ 2.5% as material inspection charges.
v
6. Sponsors of the scheme will bear full responsibility for the procurement & installations of
quality material according to NTDCL/ DISCO approved specifications,
rial bearing DISCO’s monogram or DISCO's
ty
The sponsor will not purchase/use any m
colour scheme or identification.
rom
‘The sponsors may construct the internal network in phases afier getting approval
DISCO. :
9. Documents relating 60 purchased material shall be examined by te Mana,
ccncerned, Manager (Material Management) & Project Director (Construc
the time of fina! inspection of el ion works.
(Operation)
ion) DISCO at
refs 902 for Eteerifcation of HousingGuidelines for Electrification of
Housing Societies having Ultimate
Load Demand More than 10 MW
\ aw a?
Droft SOP forelectrification of Housing Va Page-25A. Housing Socicty Having Ultimate Demand Load More Than 10 MW.
One Point Supply a
‘Sponsor Opting for Private Execution att its own
through PEPCO/ BISCO approved contractors
lations. 2015 for si
ssuied viele SIRO No.1 134 (1) =
if for Construction through PEPCO/
DISCO
1. Distribution License (in case load demand is 20
MW or above) or approval for O&M agreement
from NEPRA,
2. Approval of Master Plan by relevant Civie
Authority.
3. Sponsor te construct Grid.
(Transmission
sponsor's 60s),
4. For Ultimate toad demand upto SOMW, an
adequate pices of land located at a suitable place
Within the boundary of Housing Scheme has to be
Uransferred in the name of DISCO free of Cost to
accommodate AIS/GIS Grid Station with
standard specifications as_per NTDCL design
including siaff residences, field offices etc. In any
case, the land must not be less than 20 Kanal for
AIS and 12 Kanals for GIS Grid Station.
5. For Ultimate load demand above SOMW but less
than 100 MW, another separate single piece of
Jand measuring not less than 20 Kanals for AIS
and 12. Kanals for GIS Grid Station, located at a
suitable place within the boundary of Housing
Scheme hus to be transferred in the vame of
DISCO free of Cost te accommodate Second
AIS/GIS Grid Station with standard
specifications as per NTDCL design including,
stafV residences. field offices ete.
6, For Ultimate load demand of ubove 100 MW,
220 KV Grid Station will be constructed as per
standard requirements and approval of NTDCL.
7. The sponsor will furnish bank guarantee
equivalent to 100 % of estimated cost of Gi
Station and transmission fine for a period of four
years after the signing of MOU.
8. Completion period for construction of Grid
Station will be four years.
9. Sponsor will deposit 100 % Security for ultimate
load demand (as per relevant tariff approved by
NEPRA)
10. Design vetting charges @ 1.5 % of estimated cost
of project.
ation at his cost
ne to be constructed by DISCO at
11. Inspection and supervision charges @ 1.5 % of
estimated cost of G/S and T/L.
6
i2,
. Sponsor will provide f
+ DISCOs reserve the ti
main iy 20
proval for O&M ays
Distribution License (in ease Toad ah
MW o1
from NEPRA.
Approval of Master Plan by relevant Civic
Authority.
Sponsor to deposit 100 % cost of Grid Station
mn fine with DISCO.
For Ultimate load demand upto SOMW, an
Jequiate piece of land located at a suitable place
within the boundary of Housing Scheme has to be
transferred in the name of DISCO ree of Cost 10
accommodate AIS/GIS Grid Station with
cluding staff res
ise. the fand must not be k
nanny
20 Kanal tov
AIS and 12 Kanals for GIS Grid Station.
For Ukimate load demand above SOMW but less.
than 100 MW, another separate single piece of
Jand measuring not less than 20 Kanaly for AIS,
and 12 Kanals for GIS Grid Station, located at a
suitable place within the boundary of Housing:
Scheme to be transterred a the name of
DISCO free af Cost to accommodate Second
Al s id standard
speci gn including
staff residences,
per NTDCL. des
field offices ete.
For Ultimate load demand of above 100 MW,
220 KV Grid Station will be cinstracted ay per
standard requirements and approval of NIDCL
Completion period for construction of Grid
Station will be four years.
Sponsor will deposit 100 % See
Toad demand (as per
NEPRA)
Design vetting charges @ 1.5 % of estimated cost
of proj
for ultimate
proved by
yy of right of way to
extend supply from GiS to other loads,
hts for use of T/L and Bus
i/S for other loads.
Bar for the eatension of
Policy for connecting of private consumers Grid
Station to the NTDC / DISCO network and its
‘operation and maintenance, already issued vide
GM (C&M) PEPCO vide his No.3226-4/GMO)
Draft SOP for electrification of Housing Schemes.12, Material Inspection charges for:
For locally procured items @ 2.5% of estimated
cost of GIS & TIL,
For foreign inspection, boarding, lodging, rouind a
kets, inci ly allowance etc. for
2 inspectors of DISCOs
13. Sponsor will ensure procurement of the material
as pet NTDCL/ DISCO specifications & design
14. The sponsor will ensure purchase of material
from PEPCO/NTDCLIDISCO approved
manufacturers / suppliers duly inspected by
Chief Engineer (Quality Asstirance &
Inspection) NTDCL or DISCO's
representatives
15. Sponsor will provide facility of Right of Way to
extend supply from G/S to other loads
16. DISCOs reserve the rights for use of T/L & Bus Bar
for the extension of G/S for other loads
17. Policy for connecting of private consumers grid
| station to the NTDC/DISCO net work and its
oferation and ma
GMC.
<1 it will be ensured by
Comnittee betore encryi
tion of Housing Scher
PEPCOPA dated 30-07-2010 will be
implemented, and it-will be ensured by the.
Standing Technical Committee before energization
of grid station
Ye
27] PaceB. Housing Society Having Ultimate Demand Loa
ono!
an 10 MW.
ise of indivigual
Sponsor Opling for Private Bxecution at its own
through PEPCO/ DISCO approved contractors
(without Grid Sharing cost)
Sponsor Opting for Construction through PEPCO/
DISCO after payment of Grid Sharing cost
T Approval of Master Plan by relevant Civic
Authority. °
2. Sponsor to construct Grid Station at his cost
(Cransmnission tine by DISCO at sponsor's
cost). .
For Ullimate load demand upto SOMW, an
adequate piece of land located at a suitable
place within the boundary of Housing Scheme
teas to be transferred in the name of DISCO
free of Cost to accommodate AIS/GIS Grid
Station with st ions as per
NIDCL design field
offices ete, In any cas
less than 20 Kanals for AIS and {2 Kanals for
GIS Grid Station.
4. For Ultimate load demand above SOMW bur
fess than 100 MW, another separate single
iece of land measuring not less than 20 Kanals
for AIS and 12 Kauats for GIS Grif Station,
logated at a suitable place within the boundary
of Housing Scheme has to be transferred in the
nanwe of DISCO free of Cost to accommodate
Second AISIGIS Grid Station with standard
specitications ay per NIDCL design including
staff residences, field offices etc.
For Ultimate Joad denrad of above (00 MW,
220 KV Grid Station will be constructed as per
standard requirements and approval of
NTDCL.
6. The sponsor will furnish bank guarantee
equivalent to 100 % of estimated cost af Grid
Station and transmission line for a period of
four years after the signing of MOU.
7. Completion period for construction of Grid
Station will be four years.
8. Security to be deposited by the prospective
coutsumers af the time of obtaining connections.
‘9-—Design vetting charges @ 1.5 % of estimated
cost of GIS & T/L.
10. {nspection and supervision charges @ 1,5 % of
estimated cost of G/S and T/L.
11. Metering inspection charges for:
For locally procured items @ 2.5% of
~__estimated cost of G/S & T/L.
val of Master Plan by relevant Civic
ny
For Ultimate Joad demand aio SOMW, an
adequate piece of land measuring 32 Kanaly
located at a suitable place within the boundary
of Housing Scheme has to be transferred in the
name of DISCO free of Cost to accommodate
AIS Grid Station with standard specifications
as per NTDCL di Iuding stall
residences, field off
3. Far Uttimate foad demand above SOMW but
less than 100 MW, another separate single
piece of land measuring 32 Kanals for AlS.
‘located at a suitable place within the boundary
of Housing Scheme. has to be transferred in the
name of DISCO free af Cost {0 accommodate
AIS” Grid ion with standard
tions as per NTDCL design including
idences, field offives ete.
42 For Ultimate load demand of above 100 MW.
220 KV Grid Station witl be constructed as per
standard requirements and approval of
NTDCL.
Grid sharing cost @ 30% form Sponsors of
Housing Societies (@ 4474 per KW ie.
excluding cost of land).
6, Security to be deposited by the prospective
consumers at the time of abt connections.
2. Grid station will be constructed as per DISCOS
STG Development plan.
8 Design vetting charges @ 1.5% of estin
cost of project.
9. Sponsor will provide facility of right of way to
extend supply from G/S to other loads.
10. DISCOs reserve the rights for use of T/L and
Bus Bar for the extension of G/S for other
loads.
11, Policy for connecting of private consumer Grid
Station to the NTDC / DISCO network and its
‘eperation and maintenance, already issued vide
GM (C&M) PEPCO vide his No.3226-
40/GM(O) PEPCO/PA dated 30.07.2010 will
be implemented, and it will be ensured by the
dl
Droft SOP for electrification of Housing. es.
Page-28
voFor foreign inspection, boarding, lodging, | Standing Technical Commitee before
round air tickets, incidental charges, daily energization of grid station
allowance etc. for 2 inspectors of DISCOs :
12, Sponsor will ensure procurement of the
FE material as per NTDCL/ DISCO specification
& design
1. The sponsor will ensure purchase of material
from PEPCO/NTDCLIDISCO approved
manufacturers / suppliers duly inspected by
Chief Engineer (Quality Assurance &
Inspection) NTDCL or DISCO’s
representatives
14, Sponsor will provide facility of Right of Way
to extend supply from GiS to other toads
15, DISCOs reserve the rights for use of T/L &
Bus Bar for the extension of G/S for other
loads
for connecting of private consumers
jon to the NTDC/DISCO r.
ion and maintenance, alre
ANGM(O) PEPCO’PA dated 30-07-
be implemented, and it will be e
* Design of grid station will be approved by CE (Substation Design) NTDCL ;
mage will Be y : gt 1 TSW
espostive DISCO even ifthe grid station is sponsored and constructed by the spewors
* The ease for external electrification of housing scheme and development of grid station wil
processed by Chief Engineer (P&E) DISCO 3 peels
+ franz case 132 KV transmission line will be constr
DISCO on cost deposit
carry cut final inspsction and pre-
LIKV grid station. The Committee will
4 are a list of all outstanding points to be
y, before issuance of final taking over certificate:
NTDC.
commissioning, necessary tests and eriergizasion cf 132/
carry, out inspection of the total infrastructure and
attended by the Sponsors, i
i.
ii Manager GSO
iii Manag ation DISCO
iv Deputy Manage: (Pa!) DISCO
vi Deputy Manager (T&1) DISCO
Metering shall be eartied out on 132kV side in and out (separately):
2 system will be'3-phase / 4-wirePEPCO/DISCO specification / drawing at the proposed grid station wvith the direct excess near
main gate, it will be ensured by the Standing Technical Committee before energization of Grid
Station. Metering room be provided in such a way that the metering cables emanating from
metering CTS and PTs installed! in switchyard run independently in solid conduit pipes in the
switch yard trenches and then enter juto the metering room properly secured.
« AMR enabled static energy meters of accuracy class 0.2 will be provided by the sponsors for
billing as well as backup metering
« Dedicated 132kV metering C.Ts & P.Ts will be installed for metering purpose, Control cables
from metering CTs & PTs will be laid in separate steel conduits. Size of control cables will be
A-core 6 mm and 2.5 min? for CT & P.T circuits respectively.
+ Secondary conncetion boxes of all the 132 kV CTs & PTs will be secured properly be posting
postal orders to be signed by all the committee members.C. Housing Society Having Ultimate Demand Load More Than 10 Mw
(One Point Supply)
‘The Sponsors will have to obtain Distribution license ( in case load demand is 20 MW or above) or
approval Tor ORM Agreement from NEPRA’ fiir one point supply/ sale of power (bulk supply as per
NEPRA (Supply of power) Regulations 2015, issued vide SRO 1134(1)/2015).
2. The system beyond metering point ie. within Society / Colony area shall be ntaintained & operated by
the Licensee / O&M Operator. The system shall be constructed by the Sponsors /DISCO (at sponsor's
cost) according to the design approved by DISCO.
shall be purchased from PEPCO/ NTDCL/DISCO approved manufactures
be inspected by Chief
representative.
the procured
ngineer (Quality Assurance & Inspection) NTDCL or DISCO"s
4. All purchase order shall be vetted by the P&E Section DISCO. The Sponsor will get the design of the
internal network, after one point supply. approved from DISCO & will pay design vetting charges (
1.5% of the total estimated capital cost of the eternal electrification of housing Sch
5. ‘The Sponsor will pay @ 1
inspection / supervision charges.
‘of the total estimated cost of elect
1 of Housing Society ay
6. The sponsor will pay: @ 2.5% as material inspection charges,
7. Sponsors of the Scheme wil bear full cesponsibility for the procurement
according to NTDCL / DISCO approved specifications.
material
8. The sponsor will not purchase / use any material beating DISCO’s monoge
or DISCO's colour scheme
or identification.
9, The Sponsors may construct the internal network in phases after getting approval from DISCO.
=
Documents relation to purchased material shall be examined by the Manager (Operation) concerned.
Manager (Material Management) & Project Director (Construction) DISCO at the time of final inspec
of electrification works.
eee
Draft SOP for electrification of Housing Schemes. Page-31D. Housing Soci
y Having Ultimate Demand Load More Than 10 MW.
External Electrification (Individual Metering).
sor Opting for Private Execution at its own
through PEPCO! DISCO approved contractors
& ihe sponsor will furnish bank guarantee @ 25% of
total estimated amount of electrification of housing
scheme.
b. Design vetting charges @ 1.5% of estimated cost of
ermal eleettification of Housing schem
Inspection & supervision @ 1.5% of estimated cost of
al electrification of housing Scheme.
sharing cost @ 50% form sponsors of housing
Si F grid station is to be constructed by DISCO,
qb ils cost. (without cost of land, if the same is
provided by the Sponsors).
Sponsor will ensure procurement of the material as per
NTDCLIDISCO specification & design:
‘The sponsor will ensure purchase of material from
PEPCONTDCL/DISCO approved manufacturer /
supplier duly inspected by Chief Engineer (Quali
Assurance & Inspection) NTOCL or DISCO’
representative.
i. Material inspection charges @ 2.5%.
}. Sponsor will construct source feed line
urity will paid by the individual prospe
consumers at the tiaw Of obtaining connection (as per
mn tariff approved by NEPRA).
his cost,
14 for Construction the
DISCO
‘a, Capital cost of external electr
scheme to be deposited by the Sponsors.
b. Design vetting charges @ 1.5% of estim
amount.
€. Grid sharing cost @ 50% from sponsors of housing
Societies if grid station is constructed by DISCO at its
cost, (without cost of land, if the same is provided by:
the Sponsors).
4. Cost of independent feeder or share cast in ease oF
jonsor Opti
wed capital
Grouped Independent feeder. However in case of
sharing cost with other society if could not
materialized due to any reason, full cost of
independem feeder will have to be paid
. Security will paid by the individual prospective
consumers at the time of obtaining connection 100%.
security for the ultimate demand (as per relevant taril
approved by NEPRA).
Draft SOP for electrification of Housing Syemes. Sw Page-32Private execulion | Private Execution
Description through DISCO's | EFEMtiOn - | through DISCO's
. apnroved a approved
contracts ISCO contractor
Requirements tomeet 1 yyy, ai
vithimmediate WARY Lineta ) TRY Line tobe | 11 uy Line to | 11 kV Line to be
a be constructed by the | 4, 4 Gy
demand of load 5 et e constructed | constructed by the
consirictidty | Sponsor tirough | beoteructed | contucte by
fees NT | DiscOatie | vercoroisco’s | Meer | seecor olsco's
SANG : tot approved |
eaten is Sone ae ae sponsor approved contractors
more than 13 :
“Through raixed load : =o :
es Feeder rehabilitation charges will be paid by the sponsor
invmediate demar :
less than I-MW.
Design vetting > Design vetting > Design vetting
charges, supervision charges @ charges @ 1.5%
chiarges and 15% aS b supervision
pection of material | Design veting > Supervision | Design vetting { charges @ 1.5%
charges @ 1.5 % on charges @ charges @ charges @ > Inspection
the estimated cost of 15% 15% 13% charges @ 2.5%
THY indopendeat b tnspection
feeder charzes @
; 25% .
"a Note:
Execution throush DISCO
d after fu
i 1, Immediate toad demand
,C&D.
Independent Peder will be cons
exceeding | MW
In ease immediate demand of load is teas than MUN, feeder eehabilitation charges will be
recovered
4. Build-up of load will he:
i, For inkial specified p
appropriate tariC)
Alter specified period =
filling prerequisites 3 mentioned in
ted on full cost deposit for immediate demand of lord
jod = Immediate load requirement (to be governed by
prate demand of load (to be governed by appropriate tariff)
Private execution through DISCO's appraved contractor
To msct with immediate i
exzcution hasis, only 3 No. c+
appropriate
completion and eneraization of the schemes.
— Be y dK
I Iead demand e7 the societies to be develiped on self
nections 1,¢. for sito office, tube well and street light under
ff shall be provided. No other connection shall, be provided till the
1 of Housing ixomesEnergization. Operation & Maintenance :
The energization of the system shall be mnade as soén as the final inspection of the works is
completed by the committee (earlier nominated) and all the pre-requisites have been fulfilled
by the Sponsoring Agency. The process shall not be ordinarily-delayed.
The above policy instruction shall be applicable to all the conceptual projects and however,
the ongoing projects shall be dealt with on case to case basis and if teir process stage is -
such that any of the above instruction can apply, it shall be processed.
Planning, designing and supervision of the works of housing schemes / colonies shall be
done by the qualified consultants duly registered with Pakistan Engineering Council and
contractors must be approved by DISCOs.
+ Operation and maintenance of the grid station will be carried out in line with “PEPCO's
Policy for connecting consunter grid station to the NTDCL/DISCO network and its
operation and maintenance” issued vide GM (C&M) PEPCO letter No.3226-
40/GM(OYPEPCO/PA dated 30.07.2010 amended vide letter No.5213-
2AIGM{CRM)CE(OYDUQ’F-169/housing scheme dated 03.05.2011. :
red to be taken as guidance only for preparation of the empany specific SOP
on of housing 5 J colonies / societies, while neorporating specific
, if needed. Implementation of the same in the field, hovever, will be after
approval or ratification by the respective BODs of DISCOs.
PEPCO has coordinated with all the DISCOs and has provided technical suppot for preparation ofa
5 cn the issue, the draft SOPs inay not te considered as any
final doc f asa DISCO
Reference:
3046-59 /GMOP / DHQ/ 327 (1
Ps’MDD/GMO/DHQ/327 13th Oct, 1991
GM (PE&S)CEDED 1 Dated 26th Oct 1993
GM (PE&S)/CE(DP)'3467-R0 Dated 21 May 199
GM(PE&S)/CE(DP}6891-97 Dated 6" Oct 1998
Minutes of Mecting (Chairman's Monthly: Conference of CEOs ~ 23-24th Dec 2002)
GM(C&MPVE-S Dated 2" Jan 2003 :
179-DUGM(C&M)/P/E-172 Dated 3rd Apr
5443-60/M(C&M)CE(OYDHQ Dated I Oct 2011
5A48-60/GM(CEM)CECOYDIIQ Dated Ist Oct 2011
6907-18/GM(C&M)/CE(OYDIQ Dated 28” Oct 2011
NEPRA Regulations, 2015 for sale of power issued vide SRO No.1134 (1)2015)
ion of Houcing Se