You are on page 1of 2

Teacher’s Scoring Rubric

ACTIVITY Exemplary Proficient Partially Proficient Incomplete POINTS

Concept 15-20 points 10-14 points 5-9 points 0-4 points

The concept describes a clear The concept describes a relatively The team has brainstormed Little effort has been spent on
picture of what students are clear picture of what they are trying their concept, but has no brainstorming and refining a
trying to achieve including an to achieve including what the team clear focus. Goals/final concept. The team appears
adequate description of what is trying to do overall but without product are not clearly unclear on their goals and how
they are trying to do and specifics on how each team defined. the project objectives will be met.
generally how each team member’s work will contribute to
member’s work will contribute to the final project.
the final project.

Script/ 12-15 points 8-11 points 4-7 points 0-3 points


Storyboard
The storyboard illustrates the The storyboard includes thumbnail The thumbnail sketches on There is no evidence of a
video presentation structure with sketches of each video scene and the storyboard are not in storyboard or script.
thumbnail sketches of each includes text for each segment of logical sequence and/or do
scene. Notations of proposed the presentation, descriptions of not provide complete
transitions, special effects, sound background audio for each scene, descriptions of the video
and title tracks are included: text, and notes about proposed shots scenes, audio background,
color, placement, graphics, are and dialogue. or notes about the dialogue.
detailed. Notes about proposed
dialogue/ narration text are
included.

Content/ 15-20 points 10-14 points 5-9 points 0-4 points


Organization
The content includes a clear Information presented is a The project does not present Content lacks a central theme,
statement of purpose or theme connected theme with accurate and a clearly stated theme, is clear point of view and/or logical
and is creative, compelling and current supporting information vague, and/or some of the sequence of information. Much of
clearly written. A rich variety of contributing to understanding of the supporting information does the supporting information is
supporting information in the project’s main idea. Details are not seem to fit the main irrelevant to the overall message.
video contributes to the logical and persuasive information idea. Citations and facts are The viewer is unsure what the
understanding of the project’s is used effectively. The content minimal. message is. Information is
main idea. Events and messages includes a clear point of view with a incorrect, out of date, or
are presented in a logical order. progression of ideas and incomplete. No citations
Includes properly cited sources. supporting information. Includes included.
properly cited sources.
Quality 12-15 points 8-11 points 4-7 points 0-3 points

The video project was completed Video was completed and Video was produced, but There was no video, or video
and included most of the contained many of the suggested had very little editing. Many was unedited without transitions
suggested elements. The video elements. Editing was incomplete poor quality shots remain. or audio support.
was well edited and moves or poorly done. Some poor shots Video was fragmented and
smoothly from scene to scene remain. Video is still somewhat choppy with little to no audio
with proper use of transitions. choppy. Audio and other reinforcement.
Audio was clear and enhancements were utilized, but
understandable and other not for maximum effect.
enhancements were well used.

Teamwork 12-15 points 8-11 points 4-7 points 0-3 points

Students met and had Students met and had discussions Minimal team meetings were Meetings were not held and/or
discussions regularly. All regularly. Most of the students on held. Most of the students not all of the team members
students on the team contributed the team contributed to the on the team contributed, but contributed to the project.
to the discussion and were part discussion and were part of the a majority of the work was Teamwork was not evident.
of the final project. Team final project. Team members done by one or two.
members showed respect to one mostly showed respect toward
another. each other.

Timeliness 12-15 points 8-11 points 4-7 points 0-3 points

All project deadlines were met. Most project deadlines were met. Many project deadlines were Deadlines were disregarded,
Those that were late did not have not met, negatively having a significant impact on the
significant impact on the finished impacting the finished final project.
project. project.

Final Score
__/100

Source: https://bit.ly/3I7tB5x

You might also like