Professional Documents
Culture Documents
Position Tracking
• Farm Tractor
– Trip count (From start FFB evacuation until unloading at loading ramp,
stamping point or at mill)
– No of grab per Trip (Use button to count)
– No of bunch per trip (eBCC)
– Movement concentration summary
• FFB Checker
– eBCC
– Movement check
• Security
– Movement check
– Emergency photos
• Contractor
– Start work clocking & position record
– End work timing
– Rest time record
– Distance work record
Troubleshooting – Satellite Signal Strength