The vertical rebar of column C24 is bent and enters the joint region, leaving no space for installation of the vertical starter bar above. After discussing with MCS, it was decided that the anchorage of the longitudinal column bars will be terminated in a joint area with a horizontal 90 degree standard hook near the far face of the beam as practically possible.
The vertical rebar of column C24 is bent and enters the joint region, leaving no space for installation of the vertical starter bar above. After discussing with MCS, it was decided that the anchorage of the longitudinal column bars will be terminated in a joint area with a horizontal 90 degree standard hook near the far face of the beam as practically possible.
The vertical rebar of column C24 is bent and enters the joint region, leaving no space for installation of the vertical starter bar above. After discussing with MCS, it was decided that the anchorage of the longitudinal column bars will be terminated in a joint area with a horizontal 90 degree standard hook near the far face of the beam as practically possible.
Site Photo Dated on 28/3/2023 for Column C24 at 6F
Site Issue: When the vertical rebar of column C24 bent and enters the joint region, there is no space for installation of vertical starter bar (above).
After discussed with MCS
The anchorage of the longitudinal column bars shall be terminated in a joint area with a horizontal 90º standard hook (4 diameter of rebar to be instead of 300mm min.) near the far face of the beam as practically possible.