CenTraVac™ Rapid Restart

Keep your cool when


the power goes out
CenTraVac™ chillers deliver Rapid Restart™

How Trane delivers Rapid Restart™

Our equipment, controls and operating procedures make


every second count.
• Trane HVAC system design is optimized for fast restart.
• Advanced features and functionality are built into the
CenTraVac chiller.
• CenTraVac chiller controls are designed and engineered
for fast restart.
• Proven operational procedures get the system back
online as quickly as possible.

Trane CenTraVac™ chillers offer reliable performance under The mechanics of superior protection
normal operating circumstances. Under the extraordinary Many factors influence chiller restart times:
circumstances of a power outage, Trane really shines through. • Chiller Configuration
• Type of power loss (momentary brownout vs. blackout)
While other manufacturers’ chillers can take up to 15 minutes
• Operation prior to restart attempt
to restart –four to six minutes at best – CenTraVac restarts
• Stop to start timer of the chiller controller
a compressor in as little as 93 seconds after regaining a
• Oil pressure
power source.
• Chiller controller reboot time

If you’re like many Trane customers, Rapid Restart • Chiller controller’s ability to manage diagnostics

is more than a matter of building comfort and • Time needed for chiller to achieve near full load capacity

occupant convenience. Safety or quality control


makes it imperative to prevent overheating. Reduces thermal storage cost, too
The faster a chiller restarts, the smaller its chilled water tank
Rapid Restart requires no additional purchase: It’s simply one needs to be. For buildings that utilize chilled water storage,
more benefit to installing a Trane CenTraVac system. the storage system can be smaller, less expensive and take up
less space.
Chiller loading time
<180 seconds to 80%
Confirm cond flow 6 seconds

Call for cond water flow

Pre/Post lube 60 seconds


CenTraVac™ chiller design is optimized for fast
Confirm evaporation flow
restart at every point in the process.
6 seconds

Restart Call
timefor evaporation flow
is even faster when the unit controller is backed
Call for cooling Time to Restart (seconds)
up by an uninterrupted power supply (UPS). With a UPS,
Compressor
0
Start Time has been60proven at 43 seconds.
240

CTV Adaptiview simplex restart time


complete power loss (wthout UPS)
*Function of chiller load
** Estimated time to 80% load Compressor Start
Chiller loading time
180 seconds**
Confirm cond flow 6 seconds
Pre/Post lube 60 seconds
Use Trane chiller controls for even greater Inlet guide vanes close
reliability and performance: 20-43 seconds*
Confirm evaporation
Standard: flow 6 seconds
UC800 Reboot
• Adaptive Controls enable the CenTraVac™ chiller to adapt 24-38 seconds
Time to Restart (seconds)

to changes and adverse conditions so it stays on as long as 0 38 93 278


possible.
• Control Protocol Options: Bacnet, Lon, Modbus. CTV Adaptiview simplex restart time power loss (wth UPS)
Optional: Restart
Assumes times
chillerare calculated
starter withwith
power restored theinfollowing
120 secondsassumptions:
1. No latching
*Function of chiller loaddiagnostics to prevent the chiller from starting
Compressor Start
• Variable Primary Flow Optimization offers the key to proper ** Oil pump on UPS
2. O***ilEstimated
temperature
time to 80% load
above set point
Chiller loading time
control. Trane CenTraVac chillers have the industry’s fastest
a. Oil temp > Saturated evaporator 180 seconds** temperature + 30ºF and
rate of change in flow. Confirm cond flow 6 seconds
oil temperature minimum must be 100ºF
Close inlet guide vanes
3. Motor Temperature sufficient for a start below 235 ºF
20-43 seconds*

Rapid Restart is just one of CenTraVac’s 4. Restart Confirm inhibit not activated
evaporation
flow 6 seconds
many benefits 5. Power up Start Delay set point set to 0 minutes
Confirm oil flow 10 seconds**
6. Stop to Start Timer set to 5 seconds Time to Restart (seconds)
CenTraVac chillers from Trane offer many additional benefits Power loss timer 15 seconds
7. Evaporator and condenser water flow
– high energy efficiency, future scalability and industry-
(6
0 seconds of flow needed 43 for verification) 223
leading reliability, to name a few. 8. Inlet Guide-Vanes fully open at time of power loss
(IGVCT = 43 seconds)
Find out how a Trane CenTraVac chiller can fit into your plans 9. There is a call for cooling (differential to start or stop)
and budget. Contact your local Trane representative today.

Trane optimizes the performance of homes and buildings around the world. A business of Ingersoll Rand, the leader in creating and sustaining safe, comfortable
and energy efficient environments, Trane offers a broad portfolio of advanced controls and HVAC systems, comprehensive building services, and parts.
For more information, visit www.Trane.com.

© 2010 Trane All rights reserved Produced on 20% post-consumer recycled paper, using
CTV-SLB033-EN March 24, 2010 environmentally friendly print practices that reduce waste.

You might also like