The document contains three tables that calculate the beam depth needed for floors, roofs, and a water tank level of a building. Each table lists the beam span, effective depth, calculated effective depth, finalized beam depth, and standardized beam depth. The effective depth and finalized beam depth are calculated based on the beam span. The standardized beam depth rounds the finalized depth to the nearest standard size. There are 26 beams listed for the typical floor, 24 for the roof level, and 14 beams for the water tank level.
The document contains three tables that calculate the beam depth needed for floors, roofs, and a water tank level of a building. Each table lists the beam span, effective depth, calculated effective depth, finalized beam depth, and standardized beam depth. The effective depth and finalized beam depth are calculated based on the beam span. The standardized beam depth rounds the finalized depth to the nearest standard size. There are 26 beams listed for the typical floor, 24 for the roof level, and 14 beams for the water tank level.
The document contains three tables that calculate the beam depth needed for floors, roofs, and a water tank level of a building. Each table lists the beam span, effective depth, calculated effective depth, finalized beam depth, and standardized beam depth. The effective depth and finalized beam depth are calculated based on the beam span. The standardized beam depth rounds the finalized depth to the nearest standard size. There are 26 beams listed for the typical floor, 24 for the roof level, and 14 beams for the water tank level.