You are on page 1of 7

Image Gallery Print Log In Sign Up

To access presentations and images, please create a new user account with your email and a personal password. Click
on SIGN UP above to register. If your email is already part of the system, you can access the site by clicking Log In.

Save PDF

Technical and Social Program
August 7 ­ 9, 2019. Hotel Sheraton Santiago, Chile

WEDNESDAY, AUGUST 07

16:00­19:00 Registration, Foyer

18:00­18:30 Authors and Session Chair Coordination Meeting, Ballroom A & B

FRIDAY, AUGUST 07

BALLROOM A & B

Inaugural Ceremony 

19:00 Words of Welcome

Carlos Barahona, Geomin­Mineplanning 2019 Executive Director; General Manager, Gecamin, Chile
María Soledad Bembow, Geomin­Mineplanning 2019 Co­organizer; Director, Geological Sciences Department, Universidad
Católica del Norte, Chile
Willy Kracht, Geomin­Mineplanning 2019 Co­organizer; Director, Department of Mining Engineering, Universidad de Chile
Rick Valenta, Geomin­Mineplanning 2019 Co­organizer; Director, WH Bryan Mining & Geology Research Centre, SMI, The
University of Queensland, Australia
Julián Ortiz, Geomin­Mineplanning 2019 Co­organizer; Associate Professor, The Robert M. Buchan Department of Mining, Queen's
University, Canada

Opening Address

(SPA) The Role of Positive Leadership to Drive Transformational Change: The Teck Chile, Quebrada Blanca Case
Raúl Roco, Geomin­Mineplanning 2019 Chair; Technical Services Director, Teck Resources, Chile

20:00 ­ 21:30 Welcome Reception. Courtesy of Teck Resources 

SATURDAY, AUGUST 08

BALLROOM A & B

Plenary Session 1 
Chair: Julián Ortiz, Associate Professor, Queen's University, Canada

08:20 Day 2 Program Update

08:30 (SPA) New Mine Level at El Teniente: A Permanent Geomechanical Challenge
Pablo Gándara, Manager New Level Mine, El Teniente Division, Codelco, Chile
Page: 1 of 7
08:30 (SPA) New Mine Level at El Teniente: A Permanent Geomechanical Challenge
Pablo Gándara, Manager New Level Mine, El Teniente Division, Codelco, Chile

09:00 (ENG) El Abra 2019 Storm Event – Mine Engineering & Geology Department Roles
Vanessa DeViterbo, Manager of Engineering and Geology, Freeport­McMoRan, Chile

09:30 (SPA) Challenges and Technological Developments in Mine Planning
Pedro González­Carbonell, Asset Planning Manager, Minera Escondida, BHP, Chile

10:00 ­ 10:50 Coffee Break. Courtesy of GeoInnova 

BALLROOM A BALLROOM B

Session 1: Sampling and Geostatistics  Session 2: Production Planning and Scheduling I 
Chair: Margaret Armstrong, Universidad Adolfo Ibáñez, Chile Chair: Juan Pablo Llanos, BHP, Chile

10:50 (SPA) An Approach for Drilling Pattern Simulation 10:50 (SPA) Scenarios of Mining Preparation for the Exploitation of


Gustavo Usero, Silvia Misk and Artur Saldanha, Geovariances, Brazil the First Level of Chuquicamata Underground Mine Project
(PMCHS)
Hugo Constanzo and Sixto López, Chuquicamata Division, Codelco,
Chile; Betzabel Jara, Derk Ingeniería y Geología, Chile

11:10 (SPA) Maximizing Resources and Reserves Conversion with 11:10 (ENG) Integrated Mining Engineering: A FEL 3 Case Study


Optimal Drilling Allocation Kristian Echavarria, Navid Hosseini, Derek Galloway and Mark Deziel,
Artur Saldanha and Rodrigo Peroni, Universidade Federal do Rio Hatch, Canada
Grande do Sul, Brazil; Saulo Oliveira, Universidade de São Paulo,
Brazil

11:30 (SPA) Uncertainty Assessment in an Arbitrary Volume 11:30 Not presented


without the use of Geostatistical Simulation
Alvaro Riquelme and Julian Ortiz, The Robert M. Buchan Department
of Mining, Queen’s University, Canada

11:50 (ENG) Automated Geological Drill Core Logging Based on XRF 11:50 (SPA) Simulation and Optimization of Bench­Mining


Data using Unsupervised Machine Learning Methods Sequences using Fully Mobile In­Pit Sizer and Conveyor
Matthias Klawitter and Rick Valenta, SMI, University of Queensland, Systems
Australia Josué González and Nelson Morales, Advanced Mining Technology
Center, Universidad de Chile

12:10 (SPA) An Approach for Drill Hole Spacing using Localized 12:10 (SPA) Construction of Mining Projects in El Teniente


Uniform Conditioning Maximiliano Díaz, Pablo Rojas and Marcelo Vargas, El Teniente
Silvia Misk and Gustavo Usero, Geovariances, Brazil; Artur Saldanha, Division, Codelco, Chile
Geovariances, Chile

12:30 (SPA) Mine Sampling and Geostatistics: State of Art 12:30 (SPA) Estimation for Optimal Shift Duration in Mining Tunnel


Marco A. Alfaro, Senior Geostatistics Consultant, Chile Excavation using Stochastic Simulation
Flavia Leiva, Angélica Muñoz, Ricardo Quevedo and Juan P. Vargas,
Universidad de Santiago de Chile

12:50­14:00 Lunch. El Bohío Park  Page: 2 of 7
12:50­14:00 Lunch. El Bohío Park 

BALLROOM A BALLROOM B

Session 3: Geology and Geometallurgy  Session 4: Short and Long Term Open Pit Mine Planning I 
Chair: Sergio Spichiger, Anglo American, Chile Chair: Juan Pablo Palma, VP of Pojects, Antofagasta Minerals, Chile

14:00 (SPA) Cavity Gravels, a New Tool for Mudrush Prevention in 14:00 (SPA) Optimization of Open Pit Long­Term Planning Subject


Drawpoints to Total Haulage Hours
Manuel Salazar, Kenji Basaure, Eduardo Viera and César Salinas, El Mario Carrasco and Andrés Solar, Andina Division, Codelco, Chile
Teniente Division, Codelco, Chile

14:20 (SPA) Blast Displacement in Teck Carmen de Andacollo 14:20 (SPA) Capital Decisions as part of Strategic Scheduling


Víctor Araya and Claudio Gómez, Carmen de Andacollo, Teck, Chile; Process
Marcell Silveira, Blast Movement Technologies, Australia Eduardo Coloma, Maptek, Australia; Christie Myburgh, Relativistic,
Australia

14:40 (SPA) Impact of Geometallurgy on Planning 14:40 (ENG) Usage of Physical Markers and Electronic Detonators


Leyla Vaccia, Gonzalo Barcos, Javier Vargas and Charles Lozano, in Rock Blasts to Reduce Operational Dilution in a Copper
Minera Centinela, Antofagasta Minerals, Chile; Francisco Soto and Mine
Gerardo Espinoza, Empirica, Chile Régis Budke, Deborah Ramos and Cleiber Rezende, Vale, Brazil

15:00 (SPA) Value Adding to Quebrada Blanca 2 Project through 15:00 (ENG) Mine Planning Optimization of a Continuous Mining


Sound Geo­Metallurgy Practice System in a Steeply Dipping Iron Ore Deposit
Rodrigo Hurtado and Javier Vergara, Teck Resources, Chile Markus Dammers and Ulrich Mentges, Thyssenkrupp Industrial
Solutions, Germany

15:20 (SPA) The Relevance of Sample Representativeness for 15:20 (SPA) Loading and Hauling Simulations for Supporting


Geometallurgical Modelling Operational Decision­Making: Ramp Closure Case
Xiomara Rubio and Ramón Aguirre, Antofagasta Minerals, Chile Sebastián Rejas, Universidad de Santiago de Chile; Cristian Araya,
Minera Los Pelambres, Antofagasta Minerals, Chile; Bernabé López
and Carlos Carmona, Timining, Chile

15:40­16:20 Coffee Break. Courtesy of GeoInnova 

BALLROOM A BALLROOM B

Session 5: Geological Modelling  Session 6: Models and Technologies for Mine Planning 
Chair: María Soledad Bembow, Universidad Católica del Norte, Chile Chair: Santiago Figueroa, Antofagasta Minerals, Chile

16:20 (SPA) Conceptual Elements for the Characterization and 16:20 (SPA) On the Exploitation of Remote Sensing Techniques and


Modelling the Exotic Mineralization at Vicky Ore Deposit, In­Situ Sensors to Improve Safety and Productivity in Mining
Chile Areas
Juan Hermosilla, Patricio Cuadra, Walter Michea, Alejandra Araneda, Javier Duro, Rubén Iglesias, Rodrigo Godoy, Fernando Vicente,
José Barrera, Manuel Martínez, Laura López, Claudio Cornejo and Giuseppe Centolanza and Dani Monells, Dares Technology, Spain
Mónica Vukásovic, Exploraciones Mineras Andinas, Chile; Diego
Muñoz, Universidad de Chile
Page: 3 of 7
16:40 (SPA) Block Analysis Application Based on Point Cloud 16:40 (ENG) Analysis of Haul Cycle Data Generated by Truck
Mónica Vukásovic, Exploraciones Mineras Andinas, Chile; Diego
Muñoz, Universidad de Chile

16:40 (SPA) Block Analysis Application Based on Point Cloud 16:40 (ENG) Analysis of Haul Cycle Data Generated by Truck


Measurements: Andes Norte Project, El Teniente Mine Dispatch for a Copper Mine in Northern Brazil
Pedro Landeros and Francisca Parada, Vicepresidency of Projects, Aline Lacerda, Universidade Federal de Minas Gerais, Brazil; Carlos
Codelco, Chile Arroyo, Universidade Federal de Ouro Preto, Brazil

17:00 (ENG) Prediction of Reactive Ground using Geoscientific 17:00 (SPA) Behavior of Area Availability during the Life of Caving


Datasets Mines Codelco, Chile
Rick Valenta, Rhonda O’Sullivan and Alice Clark, SMI, The University Hugo Constanzo and Giuseppe Barindelli, Chuquicamata Division,
of Queensland, Australia Codelco, Chile; Betzabel Jara, Derk Ingeniería y Geología, Chile

17:20 (SPA) Evolution of Gold Geological Modelling at Minera Los 17:20 (SPA) Mine Planning as a Driver to Quantify the Value of


Pelambres Technology
Felipe Ibarra and Claudio Bisso, Minera Los Pelambres, Antofagasta Enrique Rubio, Redco Mining Consultants, Chile
Minerals, Chile

17:40 (SPA) Modelling Realistic Implicit Surfaces and Geological 17:40 Not presented


Uncertainty with Probability Field Simulation
Ramón Aguirre, Antofagasta Minerals, Chile

18:00 ­ 19:30 Networking Cocktail. Foyer 

SUNDAY, AUGUST 09

BALLROOM A & B

Plenary Session 2 
Chair: Rick Valenta, Director, WH Bryan Centre, SMI, The University of Queensland, Australia

08:20 Day 3 Program Update

08:30 (SPA) Process Integration Geology­Mine­Plant: The Sierra Gorda Case
Eric Zepeda, Vice President of Operations, SCM Sierra Gorda, Chile. Presented by Omar Cortés, Superintendent of Geology, SCM Sierra
Gorda, Chile

09:00 (ENG) The Role of Mining Geology, Mine Planning and Geometallurgy in Value Based Ore Control
Craig Morley, Vice President of Mining Geoscience and Reconciliation, Anglo American, Chile

09:30 (SPA) 10 years of R&D in Mine Planning ­ Universidad de Chile
Nelson Morales, Raúl Castro, Javier Vallejos and Luis F. Orellana, Advanced Mining Technology Researchers and Professors, Mining
Engineering Department, Universidad de Chile

10:00 ­ 10:50 Coffee Break 

BALLROOM A BALLROOM B

Session 7: Geotechnics and Geomechanics  Session 8: Production Planning and Scheduling II 
Chair: Pedro Landeros, Vicepresidency of Projects, Codelco, Chile Chair: Rodrigo Zúñiga, Cía. Minera Doña Inés de Collahuasi, Chile
Page: 4 of 7
Session 7: Geotechnics and Geomechanics  Session 8: Production Planning and Scheduling II 
Chair: Pedro Landeros, Vicepresidency of Projects, Codelco, Chile Chair: Rodrigo Zúñiga, Cía. Minera Doña Inés de Collahuasi, Chile

10:50 (SPA) A Machine Learning Model for the Back­Analysis of 10:50 (SPA) Risk Analysis in the Mining Plans of the Chuquicamata


Collapses in El Teniente Mine Underground Mine Project
Ricardo Quevedo, René Quezada, Rodrigo Zepeda and Antonio Laura Inostroza, Hugo Constanzo and Christian Caviedes,
Bonani, El Teniente Division, Codelco, Chile Chuquicamata Division, Codelco, Chile

11:10 (SPA) Impact of Explicit Consideration of Joints in 2D Slope 11:10 (SPA) Optimization of an Annual Mining Development Plan


Stability Analysis using Mathematical Programming
Felipe Llanos and Patricio Lledó, Derk, Chile Valentina Rojas and Nelson Morales, Advanced Mining Technology
Center, Universidad de Chile; Tomás González, El Teniente Division,
Codelco, Chile

11:30 (SPA) Photogrammetric Mapping: The Use of the Shape 11:30 (SPA) Short Term Planning for High­Risk Zones Prone to


Matrix Methodology at the Los Bronces Mine as a Case Mud­Water Entry at El Teniente Mine
Study Kenji Basaure, Eduardo Viera, Manuel Salazar and César Salinas, El
Carlos Barros, Los Bronces Division, Anglo American, Chile Teniente Division, Codelco, Chile

11:50 (SPA) Operational Geotechnical Design to Control 11:50 (SPA) The Importance of the Sequence of Daily Activities to


Instabilities Associated to Weak Clay Layers: Tesoro Central Successfully Meet the Overall Business Targets
Pit Phase 10 Alvaro Peña, Deswik, Chile
César Almarza, Jorge Calderon, Felipe González and Cristian Pizarro,
Minera Centinela, Antofagasta Minerals, Chile

12:10 (SPA) Valorization of Geotechnical Risk within the Mining 12:10 (SPA) Loading Equipment Planning Considering Optimization


Business: Application in Feasibility Study of DMC Project and Simulation for the Fulfilment of a Production Plan in Open
Mauricio Tapia, Juan P. Palma and Santiago Figueroa, Minera Pit Mining
Centinela, Antofagasta Minerals, Chile Héctor González, Nelson Morales and Fabián Manríquez, Advanced
Mining Technology Center, Universidad de Chile

12:30 (SPA) Orientation and Magnitude Assessment of the 12:30 (SPA) Integration of Service Strategies in the


Principal Stresses Based on Kinematic Indicators in Oriented Geometallurgical Mine Plan under Risk at Los Bronces
Cores and Breakouts in BHC Cristóbal Olave and Juan I. Guzmán, Gestión y Economía Minera,
Diego Díaz, María Sepúlveda and Roberto González, El Teniente Chile; Sebastián Blanco, Pierre Perrier and Germán Escobillana, Los
Division, Codelco, Chile Bronces División, Anglo American, Chile

12:50­14:00 Lunch. El Bohío Park 

BALLROOM A & B

Session 9: Short and Long Term Open Pit Mine Planning II 
Chair: Kenji Basaure, El Teniente Division, Codelco, Chile

14:00 (SPA) Open Pit Mine Planning in the Context of Transition to Underground Mine: Chuquicamata Case
Guillermo Marambio and Mauricio Derpich, Chuquicamata Division, Codelco, Chile

14:20 (ENG) Influence of Haul Roads Inclination Grades on the Transport Equipment Speed in a Copper Mine in the Southeast of
Pará, Brazil
Cleiber Rezende, Deborah Ramos and Régis Budke, Vale, Brazil

14:40 (SPA) Evaluation of Comminution Technologies and Impact on Long­Term Production Plans: Centinela Mining Development
Page: 5 of 7
Project Experience
14:40 (SPA) Evaluation of Comminution Technologies and Impact on Long­Term Production Plans: Centinela Mining Development
Project Experience
Juan P. Palma and Santiago Figueroa, Minera Centinela, Antofagasta Minerals, Chile

15:00 (SPA) New Methodology for Measuring Compliance with Operational Plans
Bernabé López, Joaquín Laínez, Rolando Moreno and Carlo Calderón, Timining, Chile; Javier Morales, Minera Antucoya, Antofagasta
Minerals, Chile

15:20 (SPA) Challenges in Mining Sequence and Operative Pushback Design: Collahuasi Case
Alejandro Quispe and Rodrigo Zúñiga, Compañía Minera Doña Inés de Collahuasi, Chile

15:40­16:00 Coffee Break 

BALLROOM A & B

Plenary Session 3 
Chair: Raúl Roco, Technical Services Director, Teck Resources, Chile

16:00 (SPA) Mining 4.0, Impacts on Mine Planning and Operations
Marcos Márquez, Mine Vice President, Compañía Minera Doña Inés de Collahuasi, Chile

16:30 (ENG) Why Have so Many Tailings Dams Failed Recently?
Margaret Armstrong, Visiting Professor, Universidad Adolfo Ibáñez, Chile

17:00 (SPA) Long Term Planning in Los Pelambres: The INCO Project
Patricio Mora, Planning and Development Manager, Minera Los Pelambres, Antofagasta Minerals, Chile

BALLROOM A & B

Closing Ceremony 

17:30 Seminar Balance and Final Comments

Carlos Barahona, Geomin­Mineplanning 2019 Executive Director; General Manager, Gecamin, Chile
María Soledad Bembow, Geomin­Mineplanning 2019 Co­organizer; Director, Geological Sciences Department, Universidad
Católica del Norte, Chile
Willy Kracht, Geomin­Mineplanning 2019 Co­organizer; Director, Department of Mining Engineering, Universidad de Chile
Rick Valenta, Geomin­Mineplanning 2019 Co­organizer; Director, WH Bryan Mining & Geology Research Centre, SMI, The
University of Queensland, Australia
Julián Ortiz, Geomin­Mineplanning 2019 Co­organizer; Associate Professor, The Robert M. Buchan Department of Mining, Queen's
University, Canada
Raúl Roco, Geomin­Mineplanning 2019 Chair; Technical Services Director, Teck Resources, Chile

Page: 6 of 7
Page: 7 of 7

You might also like