ASSIGNMENT - 1
APPAREL QUALITY
MANAGEMENT
SUBMITTED BY -
i. Acknowledgement i
ii. Declaration ii
1. TQM 1
1.a Tools 1
1.b Challenges faced 1
1.1 RMG Industries-Bangladesh (Case study-01) 2
1.1.a About the case 2
1.1.b. Obstacles for TQM Implementation 3
1.2 Textile Factory Knit Asia (Case study-02) 5
1.2.a. Limitations 6
2. Kaizen Introduction 7
2.a Kaizen Characteristics 7
2.b The benefits of kaizen 7
2.c Methodology 7
2.1 Thuan Phuong- Vietnam Case Study -1 8
2.1.a About Thuan Phuong group 8
2.1.b The areas for Improvement 8
2.1.c Software 8
2.1.d Training 9
2.1.e Results 9
2.2 Apparel industry Bangladesh 10
2.2.a Implementation of kaizen technique 10
2.2.b Limitations of kaizen 10
2.2.c Recommendations of kaizen 10
2.2.d Conclusion 10
TABLE OF CONTENT
TOPIC PAGE NO.
3. VSM Introduction 12
3.1 Apparel Industry in Sri Lanka (Case study-01) 13
3.1.a Current VSM map 13
3.1.b Future Stage Value Stream Mapping 14
3.1.c Creating cellular layout 15
3.1.d Through put time 16
3.1.e Conclusion 16
3.2 Apparel Industry- Bangladesh 17
3.2.a. Value Stream Mapping 17
3.2.b Current State Mapping 17
3.2.c Future State Mapping 17
3.2.d Steps to improve current state map 18
3.2.e Improvement of Current State 18
3.2.f Comparison of State Mapping 20
3.2.g Conclusion 20
4. PDCA Introduction 21
4.a When to use PDCA ? 21
4.1 Interstoff Apparels limited (Case Study-01) 22
4.1.a Introduction 22
4.1.b Background of the Study 22
4.1.c Steps Involved 23
4.1.d Findings and Data Analysis 24
4.1.e Application of PDCA 27
4.1.f Suggestions to Reduce Defects 30
TABLE OF CONTENT
TOPIC PAGE NO.
Group members :
Chanakya Dodla
Palak Singh
Varuni Agrawal
i
DECLARATION
We, Chanakya Dodla, Palak Singh, Varuni Agrawal hereby declare that this
document submitted to the department of Bachelor of Fashion Technology, NIFT
Bengaluru as a part of our assignment 1 of Apparel Quality Management is an
original work done by us under the guidance of our subject faculties, Ms. Nanika,
NIFT Bengaluru. Every part of this report on is genuinely the result of our sincere
efforts. It has not been submitted earlier, either partly or fully to any other
University, Institute or Company and that the work has not been published in any
journal or magazine. We also assure that the information contained in it is true to the
best of our knowledge.
Group members :
Chanakya Dodla
Palak Singh
Varuni Agrawal
ii
1. TQM
Total Quality Management (TQM) is a system focusing on customer satisfaction
through a concept of "continuous improvement". This concept emerged after the
1980s with the purpose of developing and expanding quality management strategy
by adding more aspects related to quality.
Total: every person is involved (its customers and suppliers)
Quality: customer requirements are met exactly
Management: senior executives are fully committed
1.a TOOLS
Qualitative - Seven quality control tools, flow chart, cause-and-effect diagrams,
multi-voting, affinity diagram, process action teams, brainstorming, election
grids, and task list)
Quantitative - Shewaryt cycle (PDCA), Pareto charts, control chart, histogram,
run chart, and sampling
A technique has a wider application, often resulting in the need for more
thought, skill and training to be used effectively, such as SPC, benchmarking,
quality function deployment. The most popular sets of TQM tools are as below-
1. Pareto Principle: Identifying the key problems
2. Control Charts: Variation Control
3. Cause and Effects, Fishbone, Ishikawa Diagram
4. Histogram or Bar Graph
5. Traffic Light System
6. 5S
7. Quality Function Deployment
8. Failure Mode & Effect Analysis
1
1.1 RMG INDUSTRIES - BANGLADESH
Case Study - 1
The Readymade Garment (RMG) sector is trying hard to position themselves at the
top-level across the globe. To achieve this goal, managers are utilizing the total
quality management (TQM) system.
2
1.1.b OBSTACLES FOR TQM IMPLEMENTATION
Commitment to Quality -
1. Lack of senior management commitment - Quality policies are not actively
communicated to all employees. With such reluctance and lack of commitments
from this top level of managers, the quality message may not even reach in its
original form. More than 50 per cent of the RMG firms in Bangladesh have no
commitment towards quality from their management side.
2. Lack of long-term strategy or vision - Despite the need for long-term strategy
for quality, managers are still looking for short-term strategies like profits, costs,
sales turnover, return on investments, and so on. Nearly 20 percent (Twelve out
of seventy-one) firms are sending their employees for training regularly.
3. Lack of time spent on TQM activities - In most of the cases, the managers are
not interested in taking quality management initiatives. Some managers see
quality as a lesser function than other departments like finance, production or
marketing. As a result, less time is spent on quality issues. It is found from our
survey that senior managers probably spend less than 5 percent of their working
time in a week managing quality.
Quality Systems -
1. Barriers created by quality certification and measurement issues - Most of
the RMG firms are using their quality certifications like ISO 90001:2008 for
marketing purposes to increase sales rather than commitments to continuous
quality improvement.
2. Monotony in record keeping - Due to the excessive paperwork, employees are
losing their interest in ISO 9001:2008 quality systems. As a result, it is adding
little value to quality improvement.
Customer Focus -
1. Lack of customer feedback system - Very few companies are continuing their
customer feedback system through receiving customer complaints. This type of
survey is very much essential for determining customer satisfaction with the
company’s products. About 40 percent of the firms are not conducting their
customer feedback system.
2. Lack of quick response to customer complaints - Most of the firms have no
customer contact department. They are giving less attention to the quick
response of customer complaints. A quick response to the customer's complaints
is the most important key for customer satisfaction.
3
Increasing Growth and Profitability -
1. Barriers between various departments' functions - TQM implementation is
highly affected by Power and politics within the organization. It is a common
scenario in most of the companies that marketing, HR, finance people pay less
attention to TQM culture rather than production. Continuous improvement is not
possible without the co-operation and communication between the departments.
2. High labor turnover - Nowadays, high employee turnover rate is the most
critical issue for all RMG firms. This decreases the willingness of the employer
to spend effort and money to train their employees regarding TQM. Regular
improvement of the quality is discontinued due to high turnover rate of the
employee in the organization.
Quality Costs -
1. Not keeping the quality cost report - Majority of the company do not have any
idea how to address the loss of the company due to poor quality. Mealy 3
percent of the firms keep the record of cost of quality.
2. Lack of awareness about the cost of quality loss among the employee - As
most of the firms are not maintaining the quality cost report, they fail to make
their employees aware of losing their profits due to poor quality. Thus, the level
of scrap and rework at the shop floor are increasing day by day.
Other Barriers
1. Training barriers - People who do not hold any formal business qualifications
operate a large portion of SME’s.
2. Management awareness barriers - There is wide acceptance that without full
management commitment, successful TQM implementation is unlikely
4
1.2 TEXTILE FACTORY KNIT ASIA
Case Study - 2
5
Table 5. Comparative statistics of before and after TQM implementation
1.2.a LIMITATIONS
Since the TQM as a topic is almost new in developing countries, and never been
fully implemented in the Apparel Manufacturing industry in Bangladesh, the
literature review is based on work done in the developed countries such as
Japan, UK and USA.
Newly proposed TQM framework has been applied in only one Apparel
Manufacturing industry as its very vast concept needs to change the whole
factory set-up.
The proposed TQM framework has been applied in two separate but almost
same type sewing lines having the same style running through it.
It was not possible to do the experiment in the same sewing line with the same
garment styles as garment order has a very short lead time for sewing. That’s
why two parallel sewing lines have been taken; one with TQM and another
without TQM.
6
2. KAIZEN INTRODUCTION
Industry 4.0 helps companies be more flexible in the production process and the
supply chain. Thereby creating quality products and services at low prices, saving
time and costs in manufacturing. Kaizen is known as an advanced tool in the
application of a series of methods to eliminate waste, improve the quality and
efficiency, reduce cost and delivery times of production activities in enterprises in
Japan. It improve and bring excellent efficiency in saving costs.
2.c METHODOLOGY
KAIZEN SOFTWARE
Real-time - Data is updated continuously in real-time.
Automatic reporting - All reports in Kaizen are generated automatically by the
Kaizen software based on the data.
Fast process - The project approval process is done using software and waiting
time is reduced.
No paperwork - Input data on the software so no paperwork is needed
Increase user satisfaction - Users can use modern software and not waste time
PDCA CYCLE
Kaizen is built on an iterative PDCA cycle. The PDCA cycle stands for Plan -
Do - Check - Act. It is also referred to as the Deming Cycle
7
2.1 THUAN PHUONG - VIETNAM
Case Study - 1
2.1.c SOFTWARE
Step 1 - Input improvement ideas: the step will be done by everyone in the
company including all departments, from sales, human resources, planning, and
production
Step 2 - Approval of improvement ideas: After receiving improvement ideas, the
Kaizen department in the company arranges ideas according to criteria such as
feasibility analysis, analysis of benefits of improvement, the urgency of
improvement, investment cost.
Step 3 - Fill in the information after implementing the idea: After the project has
been implemented, the improvement department is responsible for entering the
information achieved after implementation, including time, costs, and benefits
received from improvement.
Step 4 - Project approval after implementation: After the project implementation
results are available. The Kaizen department rewards individuals/organizations
who come up with ideas for improvement and individuals/organizations that
8
make improvements. This awarding is held weekly in the presence of all employees
in the company to encourage and motivate the spirit of improvement throughout the
factory.
2.1.d TRAINING
Training employees to use new software is considered very important by Thuan
Phuong company. When employees understand and follow the construction software
steps correctly, then there will be results. Thuan Phuong company also organizes
training courses on Kaizen, innovation and Lean manufacturing tools so that all
employees have certain knowledge to develop ideas.
2.1.e RESULTS
The application of Kaizen software system has been gradually applied by Thuan
Phuong company to all factories in the group since 2020. In the first year of
implementation, Thuan Phuong Group saved 47,000 hours, more than 10 times
higher than in 2019 (when Kaizen software was not applied). By 2021, despite being
heavily affected by the stagnation in production and business due to the Covid 19
pandemic, the company has reduced 45,000 hours, equivalent to more than 1 billion
VND.
9
2.2 APPAREL INDUSTRY - BANGLADESH
Case Study - 2
2.2.d CONCLUSION
The method of continuous improvement began with a small region and worked its
way out to increase output, effectiveness, and quality. Throughout the industrial
shop floor, effective teamwork and collaboration with team members surpass the
standard. The outcomes both before and after the implementation of Kaizen are
extremely fruitful. Here, the factory raised production line efficiency from 45% to
60% by using the Kaizen approach. To manufacture, it is incredibly cost-effective.
Significant reductions are made in sewing errors. The factory's working atmosphere
has also improved. To improve outcomes in the future, a 15-day improvement plan
will be implemented.
10
3. VSM INTRODUCTION
Value Stream Mapping (VSM) is a methodology originally developed and
popularized by Toyota. A value stream is the collection of all actions, both value-
added and non-value-added, required to move a product or group of products
through the main stream, from raw materials to the customer's arm, using the same
resources. .
VSM is an important lean tool that has been used in the manufacturing industry to
reduce product waste and improve quality.
12
3.1 APPAREL INDUSTRY - SRI LANKA
Case Study - 1
The research's approach was based on the application of the Value Stream Mapping
(VSM) theoretical framework in a
India's garment industry. The planned study is carried out at ABC Clothes Ltd., a
company specialising in knitted clothing.
Using time study methodologies to create a pictorial depiction of the current stage of
VSM, the researcher documented the standard operating time for each operation in
order to reduce process waste in the producing line. The researcher then examined
the causes of process waste, areas for improvement, and options for choosing
alternative relevant lean methods.
To better comprehend the material flow within the plant, a map of the plant's layout
is obtained. For the purpose of creating the value stream map, data on things like
machine setup times, machine usage, inventory counts between operations, and takt
time (customer requirements) are gathered. By dividing the daily client demand for
each style by the number of operation hours per day, the takt time of the product is
determined.
Information from the client is sent to ABC's business planning department via
electronic data interchange (EDI).
13
Table 6. Operation wise details of current VSM for knitted trouser
14
Table 7. List of operations in current VSM is removed or combined with others
15
Table 10. Waistband module
3.1.e CONCLUSION
The primary objective of this study is the development of a general
methodology for the implementation of VSM manufacturing tools and
techniques in the garment industry. VSM's goal is to reduce waste in manpower,
inventory, time to market, and manufacturing space, thereby manufacturing
high-quality products in the most efficient and economical manner while
increasing customer satisfaction. It is understood to be a prompt response to
requests.
Restructuring is done in the sewing room specifically through her VSM
analysis. Value Stream Mapping is an ideal tool for understanding process waste
within your value stream, improving quality, and identifying other suitable lean
process improvement tools. Future State Map development is not the end of the
Asset of Value Stream activity. It should be emphasized that we need to rethink
value streams until the future becomes the present.
The inflexibility problem is eliminated by cell layouts. His WIP in the process is
very low with this layout so he can quickly change the product line if needed.
This allows us to produce different kinds of products on the same production
line according to your needs.
16
3.2 APPAREL INDUSTRY - BANGLADESH
CASE STUDY - 2
17
Figure represents 15.71% activities as value added activities to the final product of
the garment industries and other 84.29% activities are non value added activities.
The value added activities are those activities which create more customers value
(Michael Porter) and which change the material state with right first time.
Moving equipment, reaching unnecessarily, looking for parts and tools, confusing
standards, going in and out of maintenance, poor visual control, floor layout, and
poor sequencing of work items are all wasted moves.
18
Defects are often hidden in an over-produced WIP stack. Product defects are caused
by lack of 5S, poor line flow and layout, overproduction, inadequate training,
inaccurate standards and instructions, and inability to hold employees accountable
for continuous failures. will be Scrap causes production stoppages, requiring
operators to rework products that should have been manufactured correctly the first
time. Finally, a major mistake that executives make today is their inability to
identify the skills of individual employees and appropriately leverage those skills to
effectively balance workloads. Not realizing the full potential of individual
employees, or placing them in uncomfortable and error-prone positions, are wasteful
decisions that impact both quality and productivity, and create additional waste.
causes waste problems that lead to domino effect.
19
3.2.f COMPARISON OF STATE MAPPING
Lead time By marking the value added and the reduction of waste at 100% on the
deliverables chart, the ratio of possible improvement is computed. If the trash is
correctly managed, the future state is mapped and the table value is attainable.
As we map out the current and future states, we can quickly see that there is an
approximate rise in value addition from 15.71% to 69.55% and a notable decrease in
no value contributed activity by retention time, which is shown in a pie chart. Even
yet, some inevitable retention durations were found following value stream
mapping. They can be reduced by implementing high end infrastructure and
technology.
3.2.g CONCLUSION
The advantages of value stream mapping come not only from the creating of the
map but also from the interaction of the mapmakers with the process and from their
on-the-ground observations, which are required to acquire the data for the value
stream maps. The VSM must come first, and then the priorities and actions. In other
words, management must be involved in the creation of value stream maps. A
factory designer may be influenced to only take into account continuous flow,
assembly line layouts, kanban-based Pull scheduling, etc. that are suitable primarily
for high volume and low variety manufacturing systems by VSM, despite its
benefits, as it is unable to handle multiple products that do not have identical maps.
Due to the manual construction method, VSM is unable to quickly build and
evaluate the various "what if" studies needed to prioritise different options for
upgrading a Current State Map when there are time and/or financial constraints.
Lastly, this study has demonstrated the benefits, viability, and applicability of value
stream mapping, serving as a baseline for the implementation of lean for other
garment industries in Bangladesh.
20
4. PDCA INTRODUCTION
The Plan-Do-Check-Act (PDCA) cycle, also known as the Plan-Do-Study-Act
(PDSA), Deming Wheel, or Deming Cycle, is a quality tool that consists of a four-
step continuous cycle for carrying out improvement and change. This systematic
approach assists businesses in determining what needs to change and then testing it
in a continuous feedback loop with the goal of resolving problems.
21
4.1 INTERSTOFF APPARELS LIMITED
Case Study - 1
4.1.a INTRODUCTION
In garment production, it is normal that there might be few rejected garments. There
is no ready-made solution that can reduce rejection percentages in a single day. This
case study suggests a method for dealing with defects and reducing rejection costs
while maintaining high production. Bangladesh is the world's leading manufacturer
and exporter of clothing. Bangladesh's main export item is readymade clothing.
The primary cause of clothing rejection is the use of low-quality raw materials such
as fabric and thread, as well as a faulty system or inefficient people. Industry has
begun to identify and implement various strategies to reduce the illness percentage
rate.
Pareto analysis is used to identify the top defect positions among all of the defects
on the facts sheet. The defects are then labelled according to their importance.
Defects usually result in garment rejection, which has a significant impact on an
agency's profit margin. A cause-impact diagram is a very useful tool for determining
the root cause of clothing rejection. It aids in the discovery, kind, and visible display
of the causes of a disorder problem or first-class function problems. The purpose of
an impact diagram is to graphically represent the relationship between a given final
result and all of the elements that affect the result, and then to determine the viable
root causes of the problem.
In this case study, the stitching segment of a garment industry that produces Knit T-
Shirts is investigated. The Pareto chart and purpose effect diagram were used to
identify and categorise the causes of various defects in the manufacturing lines.
Following that, the Plan Do Check Act have implemented in place to reduce the
number of garment defects.
22
To reduce the rework rate, factory personnel must keep an eye on defect rates from
the start. When rework and rejection occur, a company loses profit margins, has a
negative impact on production schedule, a high possibility of the buyer cancelling
the order, and the interest rate on the bank loan rises.
To achieve the overall goal of minimizing defects and rejection of completed
merchandise, it's miles required to set up documentation and maintain a machine
capable of ensuring that products conform in overall to requirements specifications.
This will be required at every level of production. To be effective, the system
requires planned periodic oversight by senior management to ensure its
effectiveness.
23
Analysis and Suggestions - This step involves performing Pareto Analysis,
which is required to identify major areas of concern. Following that, Cause-
Effect Diagrams for top finishing defect types were created. Then some
recommendations to reduce the frequency of those defects.
24
Pareto Analysis - From the above data, pareto analysis shows the top defect
positions.
25
The tension of the thread must be properly adjusted to solve this problem and reduce
broken stitches. Regular inspection of the needlepoint and checking for points that
are sharp or burred are required. Sharp edges of the needle plate, the pressure foot,
and the needle holes should be removed. Needle and thread sizes should be matched.
During washing, the product should be handled with care. Materials weak thread is
choosing high-quality thread that is free of flaws.
2. Skip Stitch -
26
Another major flaw in garments is skip stitching. This can be caused by rough
material handling. To solve this problem, the operator should handle the material
with care while operating. Slipstitching can be caused by the machine's stitch per
inch (SPI). To achieve the continuous stitch, appropriate maintenance should be
performed to keep the machine in good working order.
Lack skilled operators are responsible for open seam defects. A well-skilled operator
who knows very well how to handle the materials. A standard operation video can
be shown to the operator. Faulty feed dog can create an open seam, so these should
be checked periodically.
27
Table 14. Percentage of Defects
Here, it has been found that the most defects happen at broken stitch, skip stitch, and
open seam and pleat. In addition, their percentage is 17.51%, 11.84%, 11.04%,
9.77%. After analysis those defects, below causes are identified:-
28
Table 15. PDCA of Defects
29
4.1.f SUGGESTIONS TO REDUCE DEFECTS
Three high-quality controllers at the in-line and quality controllers at the output
desk are strongly advised at some point during a working method inside the
stitching line to become aware of the causes and consequences and to provide
the correct answer.
Statistics of checklist for inspection of add-ons and packing cloth, statistics of
swatch cards of authorised accessories, statistics of manufacturing swatch,
statistics of daily quality control document, statistics of slicing hassle record,
and others must all be nicely accompanied.
Measure all applicable seam houses, such as stitches according to cm,
extensibility, and seam electricity, before recording seams and stitches for
garment assembly.
Determine the collection of assembly operations, seams and threads to be used,
and system availability, keeping alternatives in mind if machines are
unavailable.
Examine the completed garment. Take a look and compare it to the picture.
Examine all technical aspects of any material flaws, sewing thread flaws,
seaming flaws, and so on.
All faults discovered during final inspection should be recorded for quick
correction and to determine the need for preventative action at a specific level of
production.
4.1.g CONLUSION
Quality is the most important factor in determining customer satisfaction. Good
quality increases customer satisfaction by increasing the value of the product.
Defects in the apparel industry are one type of major loss or profit reduction.
Product defects usually result in rejection, rework, time-consuming, extra working
time, and customer dissatisfaction. Lean tools are used in the apparel industry to
solve all of these problems while minimizing waste.
According to the Pareto chart, the major cumulative defects are others (19%),
broken stitch (36%), slip stitch (48%), open seam (59%), and so on. We can easily
identify the most significant defects using this chart, and then use the cause-effect
diagram to identify the major causes of that defect. We use the PDCA cycle assists
in planning for continuous quality improvement by removing defects, performing on
the process based on the plan, and then checking and monitoring the process to
ensure that it is following the correct procedures. Finally, corrective action is taken
to improve further.
30
4.2 APPAREL INDUSTRY - VIETNAM
Case Study - 2
4.2.a INTRODUCTION
Packaging plays an important role not only in increasing customer satisfaction with
a product, but also in increasing a company's economic profits. In recent years,
developing and implementing sustainable packaging has become a worldwide
concern in order to protect the environment and reduce the burden of waste
treatment for future generations. The packaging industry's development trends are
centerd on cost reduction: Saving energy during packaging processing; reducing raw
materials; using recycled, bio-degradable materials; creating a package that is
durable and flexible for reuse; and developing smart and interactive packaging for
consumers. In Vietnam, current packaging method is carton box.
Increasing product packaging quality and professionalism is a current trend in
management strategy, particularly as Vietnamese companies expand their exports to
Europe and developed countries. However, the additional cost for packaging can
result in significantly lower company profits. The objectives is to develop a
simplified combination of PDCA cycle and quality tools for quality packaging
improvement.
4.2.c PLAN
The first step in the PDCA cycle is Plan. This step includes defining problems and
collecting all relevant data. Then the team has to find out the problems’ root causes
to develop an actionable tested plan. The increasing percentage of the cracked
packages from the pre-shipment stage to customers’ storage checking leads to
customer dissatisfaction. In addition, current consumers and industry prefer using
sustainable materials for packaging also put the company in the need of improving
the packaging sustainability.
In Plan step, there are several useful tools which helps in problem solving :
31
5 Whys technique - The basis of this effective approach is to ask why five
times for a specific problem. The meaning to strive for 5 whys is to not give up
easily until finding a root cause instead of ending up with a “symptom”. Beside
be used individually, the 5 Why technique is usually as a part of the Ishikawa
diagram to identify the causes.
A cause and effect diagram - This is also called a fishbone diagram or an
Ishikawa diagram. Using this diagram for a given problem, all its possible
failure causes can be identified, categorized, and displayed. Ishikawa diagram is
used to evaluate the root causes and to brainstorm solutions to them.
transportation storage
bad road condition wrong product arrangement
driver steering habit incompetent employees
CRACKS ON PRODUCT
poor material
edges are not fixed
packaging
5W2H, five W’s two H’s - 5W2H represents: Who, what, when , where, why,
how, and how much (or many). It usually is used when defining or analyzing a
process or a problem for improvement opportunities as well as planning.
4.2.d DO
In the Do phase, the team firstly finds new material or better quality material for
packaging which is biodegradable and recyclable. Another important action in the
Do phase of this case study is to change packaging design.
4.2.e CHECK
The team analyses and compares experiment results with the target goals stated in
the plan step during the Check stage. The check step is crucial in making decisions
and defining next steps. According to the manufacturer's specifications, the package
must withstand drag, stretch, torn, and drop conditions. When the product is
delivered from the manufacturing site to the customer's hand, it retains its function
and appearance.
32
4.2.f ACT
During the Act phase, the team documents the results and decides whether or not to
implement the changes. It should be noted that PDCA is used for continuous
improvement, so it is not a beginning-to-end process. Another plan to look for an
even better-improved way should be continued during the Act phase.
4.2.g CONCLUSION
This study emphasises the advantages of PDCA methodology in quality
improvement. It explains how to practise this method in a simplified manner using
support tools such as the 5 Whys, Ishikawa diagrams, and 5W2H. PDCA combined
these tools in the packaging case study to analyse packaging defects, identify root
causes, and facilitate the development of more sustainable solutions to problems.
The Plan stage should produce a root-cause analysis, potential solutions, and a
detailed implementation schedule with time constraints. Implementing, refining, and
finalising countermeasures are critical actions during the Do phase. Using the
appropriate tools and techniques for these tasks will result in shorter testing times
and lower costs. Proper evaluation methods and plans help to avoid erroneous data
collection in the Check stage, which can lead to incorrect decisions in the Act stage.
Finally, the Act phase should include tasks in documenting results, process
standardization, sharing learnings, and planning of further steps.
This simplified PDCA cycle can be effectively applied in creating new designs,
reducing defects, and continuously improving quality in any manufacturing field.
33
11. REFERENCE