Section:
Floor girder

Number 1:

Action Char. Load Safety Design Load


Factor
1.Teriva floor 5.092 1.35 6.87
2.68*1.9
2. Finishing and Partitions 3.8 1.35 5.13
2*1.9
3. Imposed Load 3.8 1.5 5.7
2* 1.9
SUM (1 + 2) 8.892 12

q 1 = q 2 = 3.8 KN/m (gf = 1,5) q F = 8.892 KN/m (gf = 1,35)


Moment ULS combination:
Number 2:
Action Char. Load Safety Design Load
Factor
1.Teriva floor 1.6 1.35 2.16
2.68*0.6
2. Finishing and Partitions 1.2 1.35 1.62
2*0.6
3. Imposed Load 1.2 1.5 1.8
2* 0.6
SUM (1 + 2) 2.8 3.78

q 1 = q 2 = 1.2 KN/m (gf = 1,5) q F = 2.8 KN/m (gf = 1,35)


Moment ULS combination:
Number 3:
Action Char. Load Safety Design Load
Factor
1.Teriva floor 4.18 1.35 5.64
2.68*1.56
2. Finishing and Partitions 3.12 1.35 4.212
2*1.56
3. Imposed Load 3.12 1.5 4.68
2* 1.56
SUM (1 + 2) 7.3 9.85

q 1 = q 2 = 3.12 KN/m (gf = 1,5) q F = 7.3 KN/m (gf = 1,35)


Moment ULS Combination: