The document lists 7 bridges for a highway project, providing the chainage, name, span, foundation type, and remarks for each. The bridges use either pile foundations or open foundations. Remarks note that one bridge deck needs to match the existing level, and that two bridges require sheet piling and one needs water diversion during foundation work due to their elevations and nearby structures.
The document lists 7 bridges for a highway project, providing the chainage, name, span, foundation type, and remarks for each. The bridges use either pile foundations or open foundations. Remarks note that one bridge deck needs to match the existing level, and that two bridges require sheet piling and one needs water diversion during foundation work due to their elevations and nearby structures.
The document lists 7 bridges for a highway project, providing the chainage, name, span, foundation type, and remarks for each. The bridges use either pile foundations or open foundations. Remarks note that one bridge deck needs to match the existing level, and that two bridges require sheet piling and one needs water diversion during foundation work due to their elevations and nearby structures.
4 158+860 Murkutwa Khola 12m Open Foundation 5 174+800 Tarkhan- 1 12m Open Foundation
6 182+330 Chapin -1 12m Open Foundation
7 188+170 Patharwa -2 12m Open Foundation Remarks
Bridge deck level is 1.85 m above the existing bridge deck level. Also Hulaki highway crosses near the bridge. So, Deck level of new bridge should be decreased to existing bridge deck level.
Existing bridge is at high elevation. So, it needs proper sheet piling
work during excavation of foundation Existing bridge is at high elevation. So, it needs proper sheet piling work during excavation of foundation It is safe in open foundation It is safe in open foundation Canal is passed through the bridge, So diversion of water should be done during foundation excavation. It is safe in open foundation