Kombolcha Institute of Technology

College of Informatics
Department of Software Engineering
Software Risk Assignment
Section-A

Group member Id
1.Amir ali wour/5021/11
2.Abdurehman yimam wour/0841/11
3.Anwar ahmed wour/0616/11
4.Mohammed aseffa wour/0702/11
5.Mahmud mohammed wour/0925/11
6.Tewodros Misawoy wour/0816/11
1. Identify some risks related with your Industrial Project?
Our industrial project was Dessie tourism and culture office website. We
did this website to solve the problem related with tourists information
providing, advertising historical heritage, promoting tourist destinations,
tourist booking, top placing reviewing also to reduce the cost and time of
both the tourist and the tourism office workers.

Risks that are related with this project:

Risks Description

Lack of communication There was lack of communication with the


office. i.e At first,They don’t want to give
information for us.

Lack of understanding of their work There was lack of understanding of how


they calculate there tax decision because it
is a broad field .

Cost Variance(budget related issue) The budget that is given by the university
was not enough.

Leadership risk Improper management of team member


may lead to schedule issue.
Lack of experience and skill of the We have no longer experience on the
framework Laravel framework.

2. Using Risk information sheet templates from your textbook,implement the


analysis,plan,track and control function of SEI paradigm for all identified
risks.

Risk information sheet


No Risk Description Root Triggers proba Impa Tim Category
name cause bility ct e By By

fra source impa


t
me
R1 Lack of We know Lack of Difficult moderat high near Personal High
experience and
how the basic traning to e risk risk
skill of the
framework about Laravel, and implement
but not yet we orientati the code
have on
experience.

R2 Lack of There was Lack of Difficult low low near Personal Mod
understanding lack of comm to design risk ate
of their work understanding uncatio the system risk
of their work n
perfectly due
to change
year after year
R3 Cost The budget Lack of difficult to moderat moder mid Resource Mod
Variance(budg that is given cost finish the e ate risk ate
et related by the manag project risk
issue) university was ment because
not enough. the
progress
of our
project is
out of date

R4 Leadership This leads to Lack of Difficult low low near Technica low
risk schedule issue traning to protect l risk
the system risk
R5 Lack of There was Misund Difficult low low far Personal Low
communicatio lack of er to do the risk risk
n communicatio standing project/the
n with the system
office
workers. i.e
At first,They
don’t want to
give
information
for us.

No Risk owner Approach Scope & Action Status Control decision


R1 Amir Ali and Cannot 1. Improve our knowledge by In progress Continue tracking
Mohammed Accept training
aseffa 2. Watch lecture videos about
laravel

R2 Abdurehman Cannot accept 1. Improve communication complete Closed risk


yimam and skill
Mahmud 2 Reduce communication
mohammed barrier
R3 Anwar Cannot accept 1. Balance actual cost and In progress Continue tracking
Ahmed estimated cost
2. Take cost management
training’s
3. Assign good project
manager

R4 Mohammed Accept 1 change leadership In progress Continue tracking


Aseffa 2 give short training
R5 Abdurehman Cannot accept 2. Improve our complete Closed risk
yimam and communication skill
Mahmud 3. Reduce communication
mohammed barrier

Thanks