ITA/AITES

ITA/AITES – Training Course


TUNNEL ENGINEERING

Mechanized Tunnelling.
Full face tunnel boring machines,
Herrenknecht AG.
Prepared by “Dipl.- Ing. Karin Bäppler,”

Séoul - 2006

April 20, 2006 1/99


Index
1
Table of contents

2
Hamburg / Germany

3
Moscow -Lefortovo / Russia

4
Westerschelde / The Netherlands

5 Kuala Lumpur / Malaysia

2/99
Index
6
Shanghai / China

7
Paris / France

8
Botlekspoortunnel / The Netherlands

9
Madrid / Spain

10 Islisberg / Switzerland

3/99
Index
11
Gotthard / Switzerland

12
Atlanta / US

13
Lötschberg / Switzerland

4/99
Table of contents.
1 Soft ground TBMs

 Slurry supported tunnel face (Slurry Shield, Hydroshield,Mixshields).


2  Convertible TBMs.
 Earth Pressure Balance Shields.

3
 Hard Rock TBMs

4  Shielded Hard Rock TBMs (Single Shield TBMs, Double Shield TBMs).
 Gripper TBMs.

Table of contents 5/99


Range of products.

6/ 99
Soft ground TBMs (EPBs and Mixshields)

Soft ground TBMs 7/ 99


Mixshields.

EPB
OPEN SHIELD

HARD ROCK
SLURRY

Soft ground TBMs 8/ 99


Mixshield. Safe tunnelling in varying ground
conditions.

Soft ground TBMs 9/ 99


General layout Mixshields.

Soft ground TBMs 10/ 99


Real performed operational pressure during
excavation. Real Performed Operational
Pressure During Excavation
15,0
HALLANDSAS
LAYOUT
WESTERSCHELDE
- MIXSHIELD ø 11,4m - 13,0
SAND; CLAY
12,5
WESERTUNNEL
MÜLHEIM
- MIXSHIELD ø 11,4m -
- MIXSHIELD ø 6,9m -
GRAVEL; CLAY; BOULDERS
SANDSTONE; CLAYSTONE
10,0
HAMBURG
GRAUHOLZ
- MIXSHIELD ø 14,2m -
- MIXSHIELD ø 11,6m -
GRAVEL; CLAY; BOULDERS
SAND; GRAVEL; MOLASSE 8,5
[bar]

7,5
HERA HAMBURG SYDNEY
- MIXSHIELD ø 6,0m - - MIXSHIELD ø 10,4m -
SAND; GRAVEL
SANDSTONE; CLAY 5,5

5,0
4,0
3,5 3,5

2,5
2,5

0,0
80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

00

01

02

03
19

19

19

19

19

19

19

19

19

19

19

19

19

19

19

19

19

19

19

19

20

20

20

20
DIVERS
ENGAGED

Soft ground TBMs 11/ 99


Hamburg, Germany.
4th Elbe River Tunnel.
1  Diameter: 14,200 mm
 Cutterhead power: 3,400 kW
 Tunnel length: 2,560 m
 Geology: Gravel, silt, sand, boulders
2  Contractor: Bilfinger Berger AG
Dyckerhoff & Widman AG
Heitkamp GmbH
HOCHTIEF AG
3 Philipp Holzmann AG
Wayss & Freytag AG
Ed. Züblin AG
4

Hamburg/ Germany 12/ 99


Connection to the existing tunnel tubes.

Hamburg/ Germany 13/ 99


Demanding geology under the Elbe River.

Hamburg/ Germany 14/ 99


Jaw Crusher.
Capable of handling boulders up to Ø 1,200 mm.

 Crusher jaws can apply force 900 kN.


 Replaceable jaws.
 Crusher grill size 200 mm.

Hamburg/ Germany 15/ 99


One of the major technical innovations.
Cutting Tool Change under atmospheric pressure.
 Access to the main arm of the
cutting wheel under atmospheric
pressure.
 Operator undertakes maintenance
procedure’s without the risk of
having to work at the tunnel face.
 Back loading cutting tools.

Hamburg/ Germany 16/ 99


Procedure Cutting Tool Change.

 Each disc cutter is mounted in a pressurized housing with a hydraulically operated


gate valve.
 Removing of mounting bolts.
 Withdrawal of disc cutter.
 Closing of gate valve to seal the housing off from the face.
 Disc cutter removal with a crane attachment.

Hamburg/ Germany 17/ 99


Torque reduction with active center cutter.

160
140
158 %
120
100
100 %
80
60
40
20
0
 Without the center cutter
 With the center cutter

Hamburg/ Germany 18/ 99


Erector (telescopic rotating frame).

 Providing rotation of
+/- 210 degrees.
 18 to 20 tons segments are
held using 3 automated
vacuum plates.

Hamburg/ Germany 19/ 99


Segmental lining, 4th Elbe Tunnel Tube. Segmental
Lining.

Hamburg/ Germany 20/ 99


The worlds greatest Mixshield on mission
breakthrough in Moscow.
1  Diameter: 14,200 mm
 Cutterhead power: 3,200 kW + 315 kW
 Tunnel length: 2,222 m

2  Geology: fine to coarse sand,


clay, limestone
(medium strength,

3
partially very fissured)
 Contractor: AO Corporation Transstroy

Lefortovo/ Moscow 21/ 99


Outstanding record.
2,222 m tunnel in only 15 months.

Lefortovo/ Moscow 22/ 99


3rd use for the Silberwaldtunnel in Moscow.

 Diameter: 14,200 mm
 Cutterhead power: 3,400 kW
 Tunnel length: 2 x 1,505 m
 Geology: fine to coarse sand,
clay, limestone
(medium strength,
partially very fissured)
 Contractor: AO Corporation Transstroy

Lefortovo/ Moscow 23/ 99


Tunnel Cross Section.
Silberwald, Moscow.

Lefortovo/ Moscow 24/ 99


Westerschelde. The Netherlands.
1  Diameter: 11,340 mm

 Tunnel length: 2 x 6,600 m


(with 2 machines)
2 Segmental lining

 Geology: Sand, clay


Support pressure up to
8.5 bar
3
 Contractor: - Bam Infrabouw B.V.
- Franki nv
- Hejmans nv,
4 - Philipp Holzmann AG
- Voormolen Bouw B.V.
- Wayss & Freytag AG

Westerschelde/ Netherlands 25/ 99


Westerschelde. The Netherlands.

Westerschelde/ Netherlands 26/ 99


Geology Westerschelde.
Pressures up to 8.5 bar.

Westerschelde/ Netherlands 27/ 99


Machine features against clogging behavior.

Westerschelde/ Netherlands 28/ 99


Working in up to 8.5 bar pressure.

 5 operations under saturation.


 Total time under saturation:
more than 40 days.
 Decompression times with operating
pressures up to 6.9 bar have been in each
case 4 days.
 6 operations for inspection with mixed gas
have been realized.
 1,652 hrs under pressure with 546 man-
lockings.

Westerschelde/ Netherlands 29/ 99


Two Mixshields for SMART Tunnel project in
Kuala Lumpur, Malaysia.
5

Kuala Lumpur/ Malaysia 30/ 99


An innovative idea.
Multi-function tunnel in Kuala Lumpur.

Kuala Lumpur/ Malaysia 31/ 99


Tunnel route SMART, Kuala Lumpur.

 North TBM Drive, S-252  South TBM Drive, S-253


 Tunnel length: 5,400 m  Tunnel length: 4,050 m
 Contractor: Wayss & Freytag AG  Contractor: MMCEG-Gamuda JV

Kuala Lumpur/ Malaysia 32/ 99


Feature of karstic limestone bedrock.

Kuala Lumpur/ Malaysia 33/ 99


Exposed karstic rockhead during tin mining.

Kuala Lumpur/ Malaysia 34/ 99


Two giants Ø13.21m Mixshields S-252 / S-253.
Concentrated power for Kuala Lumpur.

 Tunnel length: 5,400 m (W&F); 4,059 m (MCC-Gamuda)


 Cutterhead power: 4,000 kW
 Geology: Limestone, sand, marble
 Contractor: Wayss & Freytag AG, MMC-Gamuda

Kuala Lumpur/ Malaysia 35/ 99


Possible drillings for karstic zones.
Mixshield Kuala Lumpur.

Kuala Lumpur/ Malaysia 36/ 99


Efficient mining in soft ground.
Soft ground tools with wear detection system.

 Enables current information about cutting tool wear.


 Economical tool change.
 Damage limitation on steel structure.

Kuala Lumpur/ Malaysia 37/ 99


Up to date largest TBM worldwide.
Mixshield - Cutting wheel Ø15.43 m.
5  Diameter: 15.43 m
 Power: 3,500 kW
 Tunnel length: 2 x 7,170 m
 Geology: Sand, clay and
6 rubble
 End user: Shanghai Metro
Shield Machine

7 Equipment and
Engineering Co., Ltd.

Shanghai / China 38/ 99


Two Ø15.43 m Mixshields for Shanghai (China).

Bridge

2 Tunnels
Shanghai / China 39/ 99
Changjiang Under River Crossing Tunnel Project.
Shanghai.

Shanghai / China 40/ 99


Large tunnel cross section:
Changjiang under River Tunnels, Shanghai.

Shanghai / China 41/ 99


Manufacturing of the TBM. Shanghai Changjiang
Under River Crossing Tunnel Project.

Shanghai / China 42/ 99


Manufacturing of the TBM. Shanghai Changjiang
Under River Crossing Tunnel Project.

Shanghai/ China 43/ 99


Shanghai/ China 44/ 99
Herrenknecht in China.
Current projects
1 S-169 Beijing 1 x EPB-Shield Ø 6,190mm Metro
2 S-242, S-243 Guangzhou 2 x EPB-Shield Ø 6,250mm Metro
3 S-244, S-245 Guangzhou 2 x EPB-Shield Ø 6,250mm Metro
4 S-254 Beijing 1 x EPB-Shield Ø 6,250mm Metro
5 S-261 Guangzhou 1 x EPB-Shield Ø 6,250mm Metro
6 S-266, S-267 Guangzhou 2 x EPB-Shield Ø 6,250mm Metro
7 S-282, S-283, Tianjin 3 x EPB-Shield Ø 6,390mm Metro
S-284
8 S-285, S-291, Beijing 3 x EPB-Shield Ø 6,250mm Metro
S-294
9 S-292 Guangzhou 1 x EPB-Shield Ø 6,250mm Metro
10 S-301 Xinjiang 1 x Double Shield TBM Ø 6,705mm Water
11 S-317, S-318 Shanghai 2 x Mixshield Ø 15,430mm Road
12 S-329 Guangzhou 1 x EPB Shield Ø 6,250mm Metro
13 S-335 Hongkong 1 x Mixshield Ø 7,990mm Railway
14 S-337 Guangzhou 1 x EPB-Shield Ø 6,250mm Metro
15 S-344, S-345 Guangzhou 2 x Mixshield Ø 6,250mm Metro
16 S-346, S-347 Guangzhou 2 x EPB-Shield Ø 6,250mm Metro
17 S-349, S-350 Nanjing 2 x Mixshield Ø 14,930mm Road
18 S-356 Guangzhou 1 x EPB-Shield Ø 6,250mm Metro

Shanghai / China 45/ 99


Shanghai / China 46/ 99
Herrenknecht in China.
Finished projects.
19 S-106 Shanghai 1 x EPB-Shield Ø 2,715mm Water
20 S-179, S-180 Guangzhou 2 x EPB-Shield Ø 6,250mm Metro

21 S-181, S-182 Guangzhou 2 x EPB-Shield Ø 6,250mm Metro

22 S-190 Nanjing 1 x EPB-Shield Ø 6,390mm Metro


23 S-195, S-217 Nanjing 2 x EPB-Shield Ø 6,390mm Metro
24 S-199 Hongkong 1 x Mixshield Ø 5,150mm Water

25 S-206, S-207 Shenzhen 2 x EPB-Shield Ø 6,250mm Metro

26 S-225, S-226 Tianjin 2 x EPB-Shield Ø 6,390mm Metro


27 S-235 Guangzhou 1 x EPB-Shield Ø 6,250mm Metro

28 S-236, S-237 Guangzhou 2 x EPB-Shield Ø 6,250mm Metro

29 S-240, S-241 Guangzhou 2 x EPB-Shield Ø 6,250mm Metro


30 S-259 Changjiang 1 x Mixshield Ø 6,570mm Sewage

Shanghai / China 47/ 99


Socatop, Paris.

Socatop, Paris/ France 48/ 99


Socatop. Road Tunnel for the A86.

Socatop, Paris/ France 49/ 99


Socatop. Tunnel cross section.

Exhaust

Exhaust

Socatop, Paris/ France 50/ 99


Socatop-Paris, France.
 Diameter: 11,565 mm

 Tunnel length: 10,500 m


Segmental lining

 Geology: Sand, lime, clay, marl,


chalk

 Contractor: - Cofiroute

Socatop, Paris/ France 51/ 99


Geology Socatop.

Open
Mode EPB Slurry Slurry EPB

Socatop, Paris/ France 52/ 99


Conversion Mixshield mode to EPB mode & vice
versa.

Socatop, Paris/ France 53/ 99


EPB-Shields.
Through soft ground with Earth Pressure.

Soft ground TBMs 54/ 99


General layout EPB-Shield.

Soft ground TBMs 55/ 99


Face Pressure Control.
Increase / Lowering of Shield Advance Rate

Increase / Lowering of
Screw Conveyor Discharge Rate

Water Earth
Pressure

Soft ground TBMs 56/ 99


EPB Soil-requirements.

To be useable as support medium, the soil has to fulfil following


requirements:

 Capability to extrude.
 Cohesive and plastic.
 Soft to stiff consistency.
 Lower inner angle of friction.
 Low water permeability.
 Good elasticity.

Soft ground TBMs 57/ 99


EPB Choice of conditioning.

If the soil requirements are not existing, the soil has to be conditioned.
The conditioning is dependent on following soil parameters:

 Grain size distribution.


 Water content, w (%).
 Liquid limit, wL (%).
 Plasticity Index, IP and
 Consistency Index, IC.

Soft ground TBMs 58/ 99


EPB Injection material.

 Bentonite.
 Water.
 Polymers.
 Foam.

The initial state of the soil should be kept unchanged as possible; the
consistency of the soil should guarantee the transport to the disposal
site and should be economical.

59/ 99
Foam injection points.

60/ 99
Advantages of conditioning.

 Low density.
 Optimum mixing with soil.
 Reduction of internal friction.
 Reduction of cutting wheel torque.
 Reduce soil adhesion to metal of
shield/ cutting wheel.
 Reduce soil permeability.
 Reduction of wear.
 Higher temporary face stability.

61/ 99
Botlekspoortunnel Railway Tunnel, The
Netherlands.
5  Diameter: 9,755 mm

 Tunnel length: 2 x 1,835 m


Segmental lining

6  Geology: Clay, coarse sand, gravel

 Contractor: Ballast Nedam Beton


en Waterbouw BV

7
Hollandsche Beton-en
Waterbouw BV
Strukton Betonbouw BV
Van Hattum en
Blankevoort BV
8 Wayss & Freytag AG

Botlek/ Netherlands 62/ 99


Botlekspoortunnel.
Two Tubes under the river “Oude Maas”.

Botlek/ Netherlands 63/ 99


Grain size distribution curve Botlek.

Botlek/ Netherlands 64/ 99


Piston pump for pressure control.

Botlek/ Netherlands 65/ 99


Pressure reduction along the screw.
S-144 Botlekspoortunnel
Strecke 1 - Ring 220: Förderschneckendruck und Druckabbau

3,0 0,5

2,7
Pressure at screw bottom
2,4 0,4
Erddruck Schneckenförderer [bar]

2,1

Druckabbau pro Wendel [bar]


1,8 0,3

1,5
Pressure reduction per spiral

1,2 0,2

0,9

0,6 0,1

0,3
Pressure at screw gate

0,0 0

Botlek/ Netherlands 66/ 99


Belt weighing system.

Botlek/ Netherlands 67/ 99


Laser scanner for muck control.

Botlek/ Netherlands 68/ 98


M-30 Madrid, Spain.
9
 Diameter: 15,200 mm

 Cutterhead Power: 12,000 kW

 Tunnel length: 3,500 m


Segmental lining
10  Geology: Clay, sandy clay, gypsum

 Contractor: Necso/ Ferrovial Agroman


11

12

Madrid / Spain 69/ 99


Geology along the tunnel alignment.
M-30 Road Tunnel Madrid.

Madrid / Spain 70/ 99


Highest torque ever installed in a TBM.
125,268 kNm, EPB-Shield M-30 Madrid.

Madrid / Spain 71/ 99


Torque development EPB / Mix.

Madrid / Spain 72/ 99


Hard Rock TBMs.

Single Gripper-TBM:
S-155 Tscharner,  9.53 m

Double Gripper-TBM:
S-96 TBM 3000,  3.00 m

Shielded-TBM with articulation joint:


S-163 Sörenberg,  4.56 m

Double Shield-TBM:
S-153 La Réunion,  3.80 m

Hard Rock TBMs 73/ 99


Single Shield TBM.

Hard Rock TBMs 74/ 99


Excavation and muck transport.

Hard Rock TBMs 75/ 99


Excavation and muck transport.

Hard Rock TBMs 76/ 99


Islisberg, Switzerland.
Single Shield TBM.
 Diameter:
9
11,805 mm

 Tunnel length: 1 x 4,680 m, 1 x 4,645 m


Segmental lining

10  Geology: Molasse (Limy siltstone


with varying clay and sand
content and sandstone)

11  Contractor: - Marti AG

12

Islisberg / Switzerland 77/ 99


Tunnelling rates, Islisberg.
First Drive (Tunnel 1, West).

Islisberg / Switzerland 78/ 99


Breakthrough West Tunnel Islisberg.
4,680 m in 54 weeks, single-shift operation.

Islisberg / Switzerland 79/ 99


Gripper TBMs.

Islisberg / Switzerland 80/ 99


Gotthard Base Tunnel, Switzerland.
4 x Gripper TBMs.
9  Diameter:
 CH Power:
8.89m/ 9.33m/ 9.58m.
3,500kW
 Weight: 3,200t
 TBM length: 410m

11  Tunnel length: - Lot Bodio-Faido: 28.75km


- Lot Faido-Sedrun: 23.80km
- Lot Amsteg-Sedrun:22.70km

 Geology: Granite, Gneiss, Schist


11  Contractor: - Zschokke Locher AG
- Alpine Mayreder Bau GmbH
- CSC
- Impregilo

12
- Hochtief AG
- Murer AG
- Strabag AG

Gotthard / Switzerland 81/ 99


Crossing of the ALPS.
4 Gripper TBMs for a total of 75km of tunnel.

Gotthard / Switzerland 82/ 99


TBM-Advance with Herrenknecht machines
through the Gotthard Massif.

Gotthard / Switzerland 83/ 99


Fault zone Bodio South.

Gotthard / Switzerland 84/ 99


Gotthard / Switzerland 85/ 99
Current situation Bodio (March 2006).

S-210 East Tunnel


11,402 m of 13,955 m
already excavated.

S-211 West Tunnel


12,106 m of 14,795 m
already excavated.

Gotthard / Switzerland 86/ 99


Current situation Amsteg (March 2006).

S-229 East Tunnel


9,927 m of 11,350 m
already excavated.

S-230 West Tunnel


8,441 m of 11,350 m
already excavated.

Gotthard / Switzerland 87/ 99


S-288 / S-289
West Area CSO Tunnel Atlanta.

9
Diameter: 8,230 mm
 Cutterhead power: 3,150 kW
 Tunnel length: 1 x 6,600 m
1 x 6,800 m

10  Geology: Gneiss, Granite


 Contractors: Obayashi
Massana JV

11

12

Atlanta / USA 88/ 99


CSO Tunnel Atlanta.

Atlanta / USA 89/ 99


TBM application for solid rock conditions.
Description of the Gripper technology.

Atlanta / USA 90/ 99


Tunnel face at Lötschberg Steg.
Gneiss, granite, granodiorite.
13

Lötschberg / Switzerland 91/ 99


Lötschberg-Basistunnel (Switzerland).
Steg / Raron, Ø9.43m

Lötschberg / Switzerland 92/ 99


Gripper TBM. Features.

Lötschberg / Switzerland 93/ 99


Tunnel protection anchors.

Lötschberg / Switzerland 94/ 99


Shotcrete Robot. L2.

Lötschberg / Switzerland 95/ 99


Wire mesh erector.

Lötschberg / Switzerland 96/ 99


View on back-up.

Lötschberg / Switzerland 97/ 99


Thank you very much for your attention.