This document summarizes static compression test data from cycle 1 of testing on borehole 101 located approximately 7 meters south of grid 1 for the Tangguh Expansion Project. The test applied loads of 0 kN, 900 kN at 25% load, and 1800 kN at 50% load, recording displacement readings from gauges 1 and 2 in millimeters at intervals of 10 minutes. Displacement increased with higher loads and remained stable after unloading.
This document summarizes static compression test data from cycle 1 of testing on borehole 101 located approximately 7 meters south of grid 1 for the Tangguh Expansion Project. The test applied loads of 0 kN, 900 kN at 25% load, and 1800 kN at 50% load, recording displacement readings from gauges 1 and 2 in millimeters at intervals of 10 minutes. Displacement increased with higher loads and remained stable after unloading.
This document summarizes static compression test data from cycle 1 of testing on borehole 101 located approximately 7 meters south of grid 1 for the Tangguh Expansion Project. The test applied loads of 0 kN, 900 kN at 25% load, and 1800 kN at 50% load, recording displacement readings from gauges 1 and 2 in millimeters at intervals of 10 minutes. Displacement increased with higher loads and remained stable after unloading.
RESUME STATIC COMPRESSION TEST DATA (CYCLE 1 (50%))
PT. McCONNELL DOWELL INDONESIA
Project TANGGUH EXPASION PROJECT Project No. 2781 Client CSTS Ref. Document TEP-1155422-A99-0010 Data input by ALI AKBAR / CHIA MING KHONG Date 22/05/2018
BOREHOLE 101 (SOME 7 METERS SOUTH
Checked by ABDI ROBBI SEMBADA Location OF GRID 1)
Load Test Pile
Averange Gauge Date / Time Min (kN) (%) Gauge 1 (mm) Gauge 2 (mm) (mm)