You are on page 1of 2

CALCULATION OF STANDARD DEVIATION

NAME OF THE WORK : CONSTRUCTION OF FIRE WATER RESERVOIR

NAME OF THE CONTRACTOR :

DESIGN MIX : M-30


FROM :

AVG.28 DAYS AVG. STRENGTH DEVIATION (Z)=(X- SQUARE OF


SL NO DATE OF CASTING DATE OF TESTING
RESULT (MPA) X (MPA) (x') x') DEVIATION (Z')=(Z²)

1 06.06.2018 04.07.2018 35.99 0.36 0.13


2 06.06.2018 04.07.2018 36.44 0.81 0.65
3 06.06.2018 04.07.2018 36.29 0.66 0.43
4 06.06.2018 04.07.2018 35.69 0.06 0.00
5 06.06.2018 04.07.2018 35.55 -0.08 0.01
6 13.06.2018 11.07.2018 34.88 -0.75 0.56
7 13.06.2018 11.07.2018 33.51 -2.12 4.50
8 13.06.2018 11.07.2018 34.09 -1.54 2.38
9 13.06.2018 11.07.2018 33.59 -2.04 4.17
10 13.06.2018 11.07.2018 35.70 0.07 0.00
11 21.06.2018 19.07.2018 35.88 0.25 0.06
12 21.06.2018 19.07.2018 36.59 0.96 0.92
13 21.06.2018 19.07.2018 36.18 0.55 0.30
14 21.06.2018 19.07.2018 37.18 1.55 2.40
15 21.06.2018 19.07.2018 34.84 -0.79 0.63
35.63
16 25.06.2018 23.07.2018 36.01 0.38 0.14
17 25.06.2018 23.07.2018 34.53 -1.10 1.21
18 25.06.2018 23.07.2018 39.30 3.67 13.5
19 25.06.2018 23.07.2018 35.30 -0.33 0.11
20 25.06.2018 23.07.2018 36.19 0.56 0.31
21 25.06.2018 23.07.2018 34.86 -0.77 0.59
22 08.07.2018 05.08.2018 36.32 0.69 0.47
23 08.07.2018 05.08.2018 34.61 -1.02 1.04
24 08.07.2018 05.08.2018 36.64 1.01 1.02
25 08.07.2018 05.08.2018 36.27 0.64 0.41
26 08.07.2018 05.08.2018 34.33 -1.30 1.69
27 11.07.2018 08.08.2018 35.57 -0.06 0.00
28 11.07.2018 08.08.2018 35.64 0.01 0.00
29 11.07.2018 08.08.2018 35.98 0.35 0.12
30 11.07.2018 08.08.2018 34.99 -0.64 0.41
1068.94 35.63 38.15
Standard Deviation = √[(Z'/(N-1)]Mpa =√[38.15/(30-1)]Mpa = 1.5 Mpa N=30
[fck + 0.825 x Established Standard Deviation ]N/mm²= 30+0.825x1.5 = 31.23 N/mm²

Acceptance Criteria of Compressive Strength


The Concrete is deemed to comply with compressive strength requirements when both the conditions as per table of 11 of IS : 456 are
met.

a) The mean strength determine from any standard deviation from any group of four consecutive test result >fck + 0.825 x established
standard deviation or fck + 3 N/mm² whichever is greater.

b) Any individual test result ≥fck - 3 N/mm².Thus, the result meets the criteria.E.g.Concrete cubes results from Sl. No. 1 to 30 average is
30 Mpa ≥ (30+3)=33Mpa.Therefore,first criteria individual concrete cubes results from Sl No 1 to 30 are >(30-3) = 27 Mpa

Hence the concrete test result mentioned from Sl Nos 1 to 30 is accepted.

Sign of Sign of EIL