CALCULATION OF STANDARD DEVIATION

NAME OF THE WORK : CONSTRUCTION OF FIRE WATER RESERVOIR

NAME OF THE CONTRACTOR : M/S OBER CONSTRUCTION ENTERPRISES (P) LTD.

DESIGN MIX : M-30


FROM : 04.07.2011 TO 08.08.2011

AVG.28 DAYS AVG. STRENGTH DEVIATION (Z)=(X- SQUARE OF


SL NO DATE OF CASTING DATE OF TESTING
RESULT (MPA) X (MPA) (x¯) x¯) DEVIATION (Z¯)=(Z²)

1 06.06.2011 04.07.2011 35.99 0.36 0.13


2 06.06.2011 04.07.2011 36.44 0.81 0.65
3 06.06.2011 04.07.2011 36.29 0.66 0.43
4 06.06.2011 04.07.2011 35.69 0.06 0.00
5 06.06.2011 04.07.2011 35.55 -0.08 0.01
6 13.06.2011 11.07.2011 34.88 -0.75 0.56
7 13.06.2011 11.07.2011 33.51 -2.12 4.50
8 13.06.2011 11.07.2011 34.09 -1.54 2.38
9 13.06.2011 11.07.2011 33.59 -2.04 4.17
10 13.06.2011 11.07.2011 35.70 0.07 0.00
11 21.06.2011 19.07.2011 35.88 0.25 0.06
12 21.06.2011 19.07.2011 36.59 0.96 0.92
13 21.06.2011 19.07.2011 36.18 0.55 0.30
14 21.06.2011 19.07.2011 37.18 1.55 2.40
15 21.06.2011 19.07.2011 34.84 -0.79 0.63
35.63
16 25.06.2011 23.07.2011 36.01 0.38 0.14
17 25.06.2011 23.07.2011 34.53 -1.10 1.21
18 25.06.2011 23.07.2011 39.30 3.67 13.5
19 25.06.2011 23.07.2011 35.30 -0.33 0.11
20 25.06.2011 23.07.2011 36.19 0.56 0.31
21 25.06.2011 23.07.2011 34.86 -0.77 0.59
22 08.07.2011 05.08.2011 36.32 0.69 0.47
23 08.07.2011 05.08.2011 34.61 -1.02 1.04
24 08.07.2011 05.08.2011 36.64 1.01 1.02
25 08.07.2011 05.08.2011 36.27 0.64 0.41
26 08.07.2011 05.08.2011 34.33 -1.30 1.69
27 11.07.2011 08.08.2011 35.57 -0.06 0.00
28 11.07.2011 08.08.2011 35.64 0.01 0.00
29 11.07.2011 08.08.2011 35.98 0.35 0.12
30 11.07.2011 08.08.2011 34.99 -0.64 0.41
1068.94 35.63 38.15
Standard Deviation = √[(Z¯/(N-1)]Mpa =√[38.15/(30-1)]Mpa = 1.5 Mpa N=30
[fck + 0.825 x Established Standard Deviation ]N/mm²= 30+0.825x1.5 = 31.23 N/mm²

Acceptance Criteria of Compressive Strength


The Concrete is deemed to comply with compressive strength requirements when both the conditions as per table of 11 of IS : 456 are
met.

a) The mean strength determine from any standard deviation from any group of four consecutive test result >fck + 0.825 x established
standard deviation or fck + 3 N/mm² whichever is greater.

b) Any individual test result ≥fck - 3 N/mm².Thus, the result meets the criteria.E.g.Concrete cubes results from Sl. No. 1 to 30 average is
30 Mpa ≥ (30+3)=33Mpa.Therefore,first criteria individual concrete cubes results from Sl No 1 to 30 are >(30-3) = 27 Mpa

Hence the concrete test result mentioned from Sl Nos 1 to 30 is accepted.

Sign of OBER Sign of EIL


CALCULATION OF STANDARD DEVIATION
NAME OF THE WORK : CONSTRUCTION OF FIRE WATER RESERVOIR

NAME OF THE CONTRACTOR : M/S OBER CONSTRUCTION ENTERPRISES (P) LTD.

DESIGN MIX : M-30


FROM : 08.08.2011 TO 05.09.2011

AVG.28 DAYS AVG. STRENGTH DEVIATION (Z)=(X- SQUARE OF


SL NO DATE OF CASTING DATE OF TESTING
RESULT (MPA) X (MPA) (x¯) x¯) DEVIATION (Z¯)=(Z²)

31 11.07.2011 08.08.2011 35.81 -2.24 5.01


32 16.07.2011 13.08.2011 33.41 -4.64 21.52
33 16.07.2011 13.08.2011 34.03 -4.02 16.15
34 16.07.2011 13.08.2011 33.08 -4.97 24.69
35 16.07.2011 13.08.2011 35.5 -2.55 6.50
36 16.07.2011 13.08.2011 34.27 -3.78 14.28
37 30.07.2011 27.08.2011 37.14 -0.91 0.83
38 30.07.2011 27.08.2011 40.66 2.61 6.82
39 30.07.2011 27.08.2011 39.08 1.03 1.06
40 30.07.2011 27.08.2011 35.69 -2.36 5.56
41 30.07.2011 27.08.2011 35.5 -2.55 6.50
42 04.08.2011 01.09.2011 39.71 1.66 2.76
43 04.08.2011 01.09.2011 41.8 3.75 14.07
44 04.08.2011 01.09.2011 40.57 2.52 6.36
45 04.08.2011 01.09.2011 39.49 1.44 2.08
38.05
46 04.08.2011 01.09.2011 39.85 1.80 3.24
47 04.08.2011 01.09.2011 34.67 -3.38 11.42
48 04.08.2011 01.09.2011 40.97 2.92 8.5
49 04.08.2011 01.09.2011 40.14 2.09 4.37
50 04.08.2011 01.09.2011 37.31 -0.74 0.55
51 04.08.2011 01.09.2011 40.19 2.14 4.59
52 04.08.2011 01.09.2011 35.77 -2.28 5.19
53 04.08.2011 01.09.2011 40.97 2.92 8.53
54 08.08.2011 05.09.2011 35.02 -3.03 9.17
55 08.08.2011 05.09.2011 35.7 -2.35 5.52
56 08.08.2011 05.09.2011 36.06 -1.99 3.95
57 08.08.2011 05.09.2011 41.94 3.89 15.14
58 08.08.2011 05.09.2011 41.08 3.03 9.19
59 08.08.2011 05.09.2011 43.24 5.19 26.95
60 08.08.2011 05.09.2011 42.81 4.76 22.67
1141.46 38.05 273.20
Standard Deviation = √[(Z¯/(N-1)]Mpa =√[273.20/(30-1)]Mpa = 3.06 Mpa N=30
[fck + 0.825 x Established Standard Deviation ]N/mm²= 30+0.825x3.06 = 32.52 N/mm²

Acceptance Criteria of Compressive Strength


The Concrete is deemed to comply with compressive strength requirements when both the conditions as per table of 11 of IS : 456 are
met.

a) The mean strength determine from any standard deviation from any group of four consecutive test result >fck + 0.825 x established
standard deviation or fck + 3 N/mm² whichever is greater.

b) Any individual test result ≥fck - 3 N/mm².Thus, the result meets the criteria.E.g.Concrete cubes results from Sl. No. 31 to 60 average is
30 Mpa ≥ (30+3)=33Mpa.Therefore,first criteria individual concrete cubes results from Sl No 31 to 60 are >(30-3) = 27 Mpa

Hence the concrete test result mentioned from Sl Nos 31 to 60 is accepted.

Sign of OBER Sign of EIL


CALCULATION OF STANDARD DEVIATION
NAME OF THE WORK : CONSTRUCTION OF FIRE WATER RESERVOIR

NAME OF THE CONTRACTOR : M/S OBER CONSTRUCTION ENTERPRISES (P) LTD.

DESIGN MIX : M-30


FROM : 05.09.2011 TO 16.09.2011

AVG.28 DAYS AVG. STRENGTH DEVIATION (Z)=(X- SQUARE OF


SL NO DATE OF CASTING DATE OF TESTING
RESULT (MPA) X (MPA) (x¯) x¯) DEVIATION (Z¯)=(Z²)

61 08.08.2011 05.09.2011 42.39 3.56 12.65


62 08.08.2011 05.09.2011 42.15 3.32 11.00
63 08.08.2011 05.09.2011 40.73 1.90 3.60
64 08.08.2011 05.09.2011 42.46 3.63 13.16
65 08.08.2011 05.09.2011 41.55 2.72 7.38
66 11.08.2011 08.09.2011 35.02 -3.81 14.54
67 11.08.2011 08.09.2011 33.9 -4.93 24.33
68 11.08.2011 08.09.2011 34.81 -4.02 16.18
69 11.08.2011 08.09.2011 36.92 -1.91 3.66
70 11.08.2011 08.09.2011 37.55 -1.28 1.65
71 11.08.2011 08.09.2011 42.6 3.77 14.19
72 11.08.2011 08.09.2011 38.19 -0.64 0.41
73 11.08.2011 08.09.2011 38.75 -0.08 0.01
74 11.08.2011 08.09.2011 37.62 -1.21 1.47
75 11.08.2011 08.09.2011 42.1 3.27 10.68
38.83
76 11.08.2011 08.09.2011 41.39 2.56 6.54
77 11.08.2011 08.09.2011 40.76 1.93 3.71
78 18.08.2011 15.09.2011 35.33 -3.50 12.3
79 18.08.2011 15.09.2011 37.22 -1.61 2.60
80 18.08.2011 15.09.2011 35.53 -3.30 10.91
81 18.08.2011 15.09.2011 39.7 0.87 0.75
82 18.08.2011 15.09.2011 39.46 0.63 0.39
83 18.08.2011 15.09.2011 36.54 -2.29 5.26
84 18.08.2011 15.09.2011 39.86 1.03 1.06
85 18.08.2011 15.09.2011 38.88 0.05 0.00
86 18.08.2011 15.09.2011 38.57 -0.26 0.07
87 18.08.2011 15.09.2011 38.6 -0.23 0.05
88 18.08.2011 15.09.2011 41.05 2.22 4.92
89 18.08.2011 15.09.2011 39.27 0.44 0.19
90 19.08.2011 16.09.2011 36.08 -2.75 7.58
1164.98 38.83 191.21
Standard Deviation = √[(Z¯/(N-1)]Mpa =√[191.21/(30-1)]Mpa = 2.56 Mpa N=30
[fck + 0.825 x Established Standard Deviation ]N/mm²= 30+0.825x2.56 = 32.11 N/mm²

Acceptance Criteria of Compressive Strength


The Concrete is deemed to comply with compressive strength requirements when both the conditions as per table of 11 of IS : 456 are
met.

a) The mean strength determine from any standard deviation from any group of four consecutive test result >fck + 0.825 x established
standard deviation or fck + 3 N/mm² whichever is greater.

b) Any individual test result ≥fck - 3 N/mm².Thus, the result meets the criteria.E.g.Concrete cubes results from Sl. No. 61 to 90 average is
30 Mpa ≥ (30+3)=33Mpa.Therefore,first criteria individual concrete cubes results from Sl No 61 to 90 are >(30-3) = 27 Mpa

Hence the concrete test result mentioned from Sl Nos 61 to 90 is accepted.

Sign of OBER Sign of EIL


CALCULATION OF STANDARD DEVIATION
NAME OF THE WORK : CONSTRUCTION OF FIRE WATER RESERVOIR

NAME OF THE CONTRACTOR : M/S OBER CONSTRUCTION ENTERPRISES (P) LTD.

DESIGN MIX : M-30


FROM : 16.09.2011 TO 24.09.2011

AVG.28 DAYS AVG. STRENGTH DEVIATION (Z)=(X- SQUARE OF


SL NO DATE OF CASTING DATE OF TESTING
RESULT (MPA) X (MPA) (x¯) x¯) DEVIATION (Z¯)=(Z²)

91 19.08.2011 16.09.2011 38.15 -0.60 0.36


92 19.08.2011 16.09.2011 38.09 -0.66 0.44
93 19.08.2011 16.09.2011 35.4 -3.35 11.22
94 19.08.2011 16.09.2011 39.99 1.24 1.54
95 19.08.2011 16.09.2011 34.6 -4.15 17.23
96 19.08.2011 16.09.2011 37.55 -1.20 1.44
97 19.08.2011 16.09.2011 38.78 0.03 0.00
98 19.08.2011 16.09.2011 38.88 0.13 0.02
99 19.08.2011 16.09.2011 40.24 1.49 2.22
100 19.08.2011 16.09.2011 36.55 -2.20 4.84
101 19.08.2011 16.09.2011 38.4 -0.35 0.12
102 25.08.2011 22.09.2011 39.56 0.81 0.66
103 25.08.2011 22.09.2011 38.89 0.14 0.02
104 25.08.2011 22.09.2011 40.14 1.39 1.93
105 25.08.2011 22.09.2011 38.47 -0.28 0.08
38.75
106 25.08.2011 22.09.2011 38.95 0.20 0.04
107 25.08.2011 22.09.2011 41.32 2.57 6.60
108 25.08.2011 22.09.2011 40.24 1.49 2.2
109 25.08.2011 22.09.2011 39.94 1.19 1.42
110 25.08.2011 22.09.2011 38.55 -0.20 0.04
111 25.08.2011 22.09.2011 40.53 1.78 3.17
112 25.08.2011 22.09.2011 40.99 2.24 5.02
113 25.08.2011 22.09.2011 39.73 0.98 0.96
114 27.08.2011 24.09.2011 38.62 -0.13 0.02
115 27.08.2011 24.09.2011 37.88 -0.87 0.76
116 27.08.2011 24.09.2011 38.77 0.02 0.00
117 27.08.2011 24.09.2011 35.82 -2.93 8.59
118 27.08.2011 24.09.2011 38.64 -0.11 0.01
119 27.08.2011 24.09.2011 39.57 0.82 0.67
120 27.08.2011 24.09.2011 39.27 0.52 0.27
1162.51 38.75 71.89
Standard Deviation = √[(Z¯/(N-1)]Mpa =√[71.89/(30-1)]Mpa = 1.57 Mpa N=30
[fck + 0.825 x Established Standard Deviation ]N/mm²= 30+0.825x1.57 = 31.29 N/mm²

Acceptance Criteria of Compressive Strength


The Concrete is deemed to comply with compressive strength requirements when both the conditions as per table of 11 of IS : 456 are
met.

a) The mean strength determine from any standard deviation from any group of four consecutive test result >fck + 0.825 x established
standard deviation or fck + 3 N/mm² whichever is greater.

b) Any individual test result ≥fck - 3 N/mm².Thus, the result meets the criteria.E.g.Concrete cubes results from Sl. No. 91 to 120 average
is 30 Mpa ≥ (30+3)=33Mpa.Therefore,first criteria individual concrete cubes results from Sl No 91 to 120 are >(30-3) = 27 Mpa

Hence the concrete test result mentioned from Sl Nos 91 to 120 is accepted.

Sign of OBER Sign of EIL


CALCULATION OF STANDARD DEVIATION
NAME OF THE WORK : CONSTRUCTION OF FIRE WATER RESERVOIR

NAME OF THE CONTRACTOR : M/S OBER CONSTRUCTION ENTERPRISES (P) LTD.

DESIGN MIX : M-30


FROM : 24.09.2011 TO 17.10.2011

AVG.28 DAYS AVG. STRENGTH DEVIATION (Z)=(X- SQUARE OF


SL NO DATE OF CASTING DATE OF TESTING
RESULT (MPA) X (MPA) (x¯) x¯) DEVIATION (Z¯)=(Z²)

121 27.08.2011 24.09.2011 38.02 0.84 0.71


122 27.08.2011 24.09.2011 38.92 1.74 3.03
123 27.08.2011 24.09.2011 38.13 0.95 0.90
124 27.08.2011 24.09.2011 39.1 1.92 3.69
125 27.08.2011 24.09.2011 35.02 -2.16 4.67
126 07.09.2011 05.10.2011 35.3 -1.88 3.53
127 07.09.2011 05.10.2011 35.88 -1.30 1.69
128 07.09.2011 05.10.2011 38.65 1.47 2.16
129 07.09.2011 05.10.2011 37.2 0.02 0.00
130 07.09.2011 05.10.2011 39.89 2.71 7.34
131 07.09.2011 05.10.2011 38.47 1.29 1.66
132 12.09.2011 10.10.2011 34.16 -3.02 9.12
133 12.09.2011 10.10.2011 35.41 -1.77 3.13
134 12.09.2011 10.10.2011 40.89 3.71 13.76
135 12.09.2011 10.10.2011 33.97 -3.21 10.30
37.18
136 12.09.2011 10.10.2011 35.31 -1.87 3.50
137 12.09.2011 10.10.2011 35.61 -1.57 2.46
138 12.09.2011 10.10.2011 34.44 -2.74 7.51
139 12.09.2011 10.10.2011 35.33 -1.85 3.42
140 12.09.2011 10.10.2011 36.09 -1.09 1.19
141 12.09.2011 10.10.2011 36.58 -0.60 0.36
142 12.09.2011 10.10.2011 36.63 -0.55 0.30
143 12.09.2011 10.10.2011 40.11 2.93 8.58
144 16.09.2011 14.10.2011 37.81 0.63 0.40
145 16.09.2011 14.10.2011 37.33 0.15 0.02
146 16.09.2011 14.10.2011 38.27 1.09 1.19
147 16.09.2011 14.10.2011 39.74 2.56 6.55
148 16.09.2011 14.10.2011 39.44 2.26 5.11
149 16.09.2011 14.10.2011 37.81 0.63 0.40
150 19.09.2011 17.10.2011 35.92 -1.26 1.59
1115.43 37.18 108.28
Standard Deviation = √[(Z¯/(N-1)]Mpa =√[108.28/(30-1)]Mpa = 1.93 Mpa N=30
[fck + 0.825 x Established Standard Deviation ]N/mm²= 30+0.825x1.93 = 31.59 N/mm²

Acceptance Criteria of Compressive Strength


The Concrete is deemed to comply with compressive strength requirements when both the conditions as per table of 11 of IS : 456 are
met.

a) The mean strength determine from any standard deviation from any group of four consecutive test result >fck + 0.825 x established
standard deviation or fck + 3 N/mm² whichever is greater.

b) Any individual test result ≥fck - 3 N/mm².Thus, the result meets the criteria.E.g.Concrete cubes results from Sl. No. 121 to 150
average is 30 Mpa ≥ (30+3)=33Mpa.Therefore,first criteria individual concrete cubes results from Sl No 121 to 150 are >(30-3) = 27 Mpa

Hence the concrete test result mentioned from Sl Nos 121 to 150 is accepted.

Sign of OBER Sign of EIL


CALCULATION OF STANDARD DEVIATION
NAME OF THE WORK : CONSTRUCTION OF FIRE WATER RESERVOIR

NAME OF THE CONTRACTOR : M/S OBER CONSTRUCTION ENTERPRISES (P) LTD.

DESIGN MIX : M-30


FROM : 17.10.2011 TO 20.10.2011

AVG.28 DAYS AVG. STRENGTH DEVIATION (Z)=(X- SQUARE OF


SL NO DATE OF CASTING DATE OF TESTING
RESULT (MPA) X (MPA) (x¯) x¯) DEVIATION (Z¯)=(Z²)

151 19.09.2011 17.10.2011 37.23 -1.11 1.24


152 19.09.2011 17.10.2011 38.28 -0.06 0.00
153 19.09.2011 17.10.2011 38.91 0.57 0.32
154 19.09.2011 17.10.2011 40.24 1.90 3.59
155 19.09.2011 17.10.2011 39.63 1.29 1.65
156 19.09.2011 17.10.2011 38.58 0.24 0.06
157 19.09.2011 17.10.2011 36.89 -1.45 2.12
158 19.09.2011 17.10.2011 38.9 0.56 0.31
159 19.09.2011 17.10.2011 39.56 1.22 1.48
160 19.09.2011 17.10.2011 38.50 0.16 0.02
161 19.09.2011 17.10.2011 38.04 -0.30 0.09
162 21.09.2011 19.10.2011 38.53 0.19 0.03
163 21.09.2011 19.10.2011 38.98 0.64 0.40
164 21.09.2011 19.10.2011 37.91 -0.43 0.19
165 21.09.2011 19.10.2011 36.46 -1.88 3.55
38.34
166 21.09.2011 19.10.2011 35.69 -2.65 7.05
167 21.09.2011 19.10.2011 35.94 -2.40 5.78
168 21.09.2011 19.10.2011 39.51 1.17 1.4
169 21.09.2011 19.10.2011 35.79 -2.55 6.52
170 21.09.2011 19.10.2011 38.21 -0.13 0.02
171 21.09.2011 19.10.2011 39.9 1.56 2.42
172 21.09.2011 19.10.2011 38.76 0.42 0.17
173 21.09.2011 19.10.2011 40.05 1.71 2.91
174 22.09.2011 20.10.2011 39.75 1.41 1.98
175 22.09.2011 20.10.2011 38.08 -0.26 0.07
176 22.09.2011 20.10.2011 39.41 1.07 1.14
177 22.09.2011 20.10.2011 38.13 -0.21 0.05
178 22.09.2011 20.10.2011 38.62 0.28 0.08
179 22.09.2011 20.10.2011 37.63 -0.71 0.51
180 22.09.2011 20.10.2011 38.22 -0.12 0.02
1150.33 45.12
Standard Deviation = √[(Z¯/(N-1)]Mpa =√[45.12/(30-1)]Mpa = 1.24 Mpa N=30
[fck + 0.825 x Established Standard Deviation ]N/mm²= 30+0.825x1.24 = 31.02 N/mm²

Acceptance Criteria of Compressive Strength


The Concrete is deemed to comply with compressive strength requirements when both the conditions as per table of 11 of IS : 456 are
met.

a) The mean strength determine from any standard deviation from any group of four consecutive test result >fck + 0.825 x established
standard deviation or fck + 3 N/mm² whichever is greater.

b) Any individual test result ≥fck - 3 N/mm².Thus, the result meets the criteria.E.g.Concrete cubes results from Sl. No. 151 to 180
average is 30 Mpa ≥ (30+3)=33Mpa.Therefore,first criteria individual concrete cubes results from Sl No 151 to 180 are >(30-3) = 27 Mpa

Hence the concrete test result mentioned from Sl Nos 151 to 180 is accepted.

Sign of OBER Sign of EIL


CALCULATION OF STANDARD DEVIATION
NAME OF THE WORK : CONSTRUCTION OF FIRE WATER RESERVOIR

NAME OF THE CONTRACTOR : M/S OBER CONSTRUCTION ENTERPRISES (P) LTD.

DESIGN MIX : M-30


FROM : 20.10.2011 TO 07.11.2011

AVG.28 DAYS AVG. STRENGTH DEVIATION (Z)=(X- SQUARE OF


SL NO DATE OF CASTING DATE OF TESTING
RESULT (MPA) X (MPA) (x¯) x¯) DEVIATION (Z¯)=(Z²)

181 22.09.2011 20.10.2011 38.7 0.70 0.49


182 22.09.2011 20.10.2011 39.14 1.14 1.30
183 22.09.2011 20.10.2011 36.96 -1.04 1.08
184 22.09.2011 20.10.2011 39.58 1.58 2.50
185 26.09.2011 24.10.2011 37.39 -0.61 0.37
186 26.09.2011 24.10.2011 36.94 -1.06 1.12
187 26.09.2011 24.10.2011 37.59 -0.41 0.17
188 26.09.2011 24.10.2011 37.91 -0.09 0.01
189 26.09.2011 24.10.2011 37.96 -0.04 0.00
190 26.09.2011 24.10.2011 37.19 -0.81 0.65
191 26.09.2011 24.10.2011 37.13 -0.87 0.76
192 26.09.2011 24.10.2011 38.49 0.49 0.24
193 26.09.2011 24.10.2011 37.05 -0.95 0.90
194 26.09.2011 24.10.2011 36.61 -1.39 1.93
195 26.09.2011 24.10.2011 38.03 0.03 0.00
38.00
196 26.09.2011 24.10.2011 38.17 0.17 0.03
197 28.09.2011 26.10.2011 36.79 -1.21 1.46
198 28.09.2011 26.10.2011 39.01 1.01 1.0
199 28.09.2011 26.10.2011 37.50 -0.50 0.25
200 28.09.2011 26.10.2011 38.47 0.47 0.22
201 28.09.2011 26.10.2011 36.67 -1.33 1.77
202 28.09.2011 26.10.2011 39.15 1.15 1.32
203 28.09.2011 26.10.2011 36.18 -1.82 3.31
204 28.09.2011 26.10.2011 37.53 -0.47 0.22
205 28.09.2011 26.10.2011 38.95 0.95 0.90
206 10.10.2011 07.11.2011 38.62 0.62 0.39
207 10.10.2011 07.11.2011 39.14 1.14 1.30
208 10.10.2011 07.11.2011 38.59 0.59 0.35
209 10.10.2011 07.11.2011 39.21 1.21 1.47
210 10.10.2011 07.11.2011 39.32 1.32 1.75
1139.97 27.28
Standard Deviation = √[(Z¯/(N-1)]Mpa =√[27.28/(30-1)]Mpa = 1.00 Mpa N=30
[fck + 0.825 x Established Standard Deviation ]N/mm²= 30+0.825x1.00 = 30.82 N/mm²

Acceptance Criteria of Compressive Strength


The Concrete is deemed to comply with compressive strength requirements when both the conditions as per table of 11 of IS : 456 are
met.

a) The mean strength determine from any standard deviation from any group of four consecutive test result >fck + 0.825 x established
standard deviation or fck + 3 N/mm² whichever is greater.

b) Any individual test result ≥fck - 3 N/mm².Thus, the result meets the criteria.E.g.Concrete cubes results from Sl. No. 181 to 210
average is 30 Mpa ≥ (30+3)=33Mpa.Therefore,first criteria individual concrete cubes results from Sl No 181 to 210 are >(30-3) = 27 Mpa

Hence the concrete test result mentioned from Sl Nos 181 to 210 is accepted.

Sign of OBER Sign of EIL