RESPONSIBILITY OF A QA/QC CIVIL INSPECTOR
Zahid Iqbal Ma’aden Ras Al Khair July 19, 2017)
Check and review the plan and specification for the proper construction &
quality implementation at job site, perform pre‐inspection to ensure that
all installed materials are within standard in conformance to applicable
drawings & specs., conduct final inspection with owner's representative
prior to proceed concrete pouring and other succeeding work activities
that requires step by step as per inspection and test plan (ITP). Always
monitoring and surveillance on site to control the quality of work being
implemented by the construction group.
WITNESS POINT, QA/QC organization shell be notified of the timing
of inspection or test in advance, however, the test or inspection shell
be performed as scheduled if QA/QC organization representative is
not present.
HOLD POINT, QA/QC organization shell be notified of the timing of
inspection or test in advance, however, the test or inspection shell
not be carried out without QA/QC organization representative in
attendance.
SURVEILLANCE, QA/QC organization monitor work in progress
without notice from construction organization.
To meet the minimum
What is quality?
required
What is RFI? Request for inspection
Nonconformance
What is NCR?
report
Corrective action
What is CAR?
report
Material deficiency
What is MDR?
report
What is ITP? Inspection & test plan
Not to proceed until
What is hold point?
approved
What is timing of RFI sending in advance? 24 hrs. to inspection
EARTH WORK
Excavation & backfilling Aramco stander? SAES ‐A‐114
What is minimum compaction required for select fill material? 95 % MDD
What is FDT? Field density test
What is proctor value? Moisture relationship.
What is minimum relative density test for cohesion less soil? 70 % minimum.
The depth of test hole shell not be greater then,>>>>>>> ASTMD 2922 300mm ( 12 inch )
What is minimum dry density required for under heavy load? 95 % minimum
General Fill material, gravel, Sand and Marl material maximum size. 75 mm (SAES ‐ A‐114)
Select Fill material, gravel, Sand and Marl material maximum size. 50 mm (SAES ‐ A‐114)
Liquid limit for Select fill material maximum? ( SAES ‐ A‐114 ) 0 ‐ 35 % (SAES ‐ A‐114)
Plasticity index for Select fill material maximum? ( SAES ‐A ‐114 ) 0 ‐ 12 % (SAES ‐ A‐114)
Plasticity Index test for select fill material is not required if material has less
ten 15 % fines ( passing 200 sieve ) 0‐20 %( SAES ‐ A‐114)
200 sieve passing percentage.
Fill material shell be placed in lift not exceeding in loose depth. 200 mm (SAES ‐ A‐114)
Fill material shell be placed in lift not exceeding in loose depth for hand
100 mm
operated compaction.
( SAES ‐ A‐114)
General Fill Material shall be placed in lifts of maximum in loose depth.
300 mm
Sub - base and aggregate Base Course material receiving
Inspection. No oversize material for each class.
Sub ‐ Base class A material size SAES Q‐006 2/1.2"
Sub ‐ Base class B material size SAES Q‐006 2"
Base Course class A material size SAES Q‐006 2/1,2"
Base Course class B material size SAES Q‐006 1/1,2"
Select fill test under foundation, one test in each lift? SAES A‐114 100 m2
Select fill test under paving, roadway, parking one test in each lift?
200 m2
SAES A‐114
Compaction test for Road Base and Sub‐base one test in each lift? SAES
180 m2
A‐114
Compaction test for backfilling of trenches one test of each lift.
SAES A – 114 15 LM
General fill one test of each lift. SAES A‐114 500 m2
Stander of port land cements concrete Aramco Spec.? 09‐ SAMMS‐097
Plasticity for class A Sub ‐ Base SAES Q ‐ 006 0%
Plasticity for class B Sub ‐ Base SAES Q ‐ 006 6%
Plasticity for class A Base Course SAES Q ‐006 6%
Plasticity for class B Base Course SAES Q ‐ 006 6%
Liquid Limit for class B sub‐base SAES Q ‐ 006 25%
Liquid Limit for class B Base Course SAES Q ‐ 006 25%
California bearing ration (CBR) Sub ‐Base for class A & B 25%
California bearing ration (CBR) Base Course for class A & B 100 % & 50 %
EMBEDED ITEMS & CONCRETE WORK.
Variation in dimension between the center of adjacent anchor bolt group
2mm
shell be equal or less then >
Variation in elevation of the top of anchor bolt shell be equal or less then
13mm +‐
>>
Minimum clear distance from anchor bolts or sleeve to edge of concrete
100mm
shell be SAES Q ‐ 005
Criteria of design and construction of structure concrete in Aramco
SAES‐Q‐001
standard
Ordinary type of port land cement with SSA143? Type 1
Sulfate resistance port land cement with ASTM C 150? Type 5
Mineral additive not less than 7% by weight of cement ASTM ‐ 1240? Silica Fume
What is minimum compressive strength of non‐structure concrete? 2000 psi
What is minimum compressive strength of structure concrete?
4000
(09‐SAMMS‐097
What is minimum compressive strength of precast concrete? 5000 psi
Structural concrete shell have cement content minimum & maximum? 350 to 370 m3
Water cement ratio in structural concrete? 0.4 % max. 28 days
Nonstructural concrete shell have cement content minimum & maximum? 250 m3
Water cement ratio in nonstructural concrete? 0.6 % min. 28 days
Concrete plant scales shell celebrated not less then? 3 time in year
Maximum temperature of concrete until used? (09‐SAMMS‐097) 35 degree
Required minimum number of cylinder for compressive strength?
8 no.
(09‐SAMSS‐097) 4 for site and 4 for laboratory. (09‐SAMMS‐097)
The age of cylinder test (09‐SAMMS‐097) 7 ‐28 days( 2+2 )
What is minimum curing time? 7 days
What is slump of concrete? (09‐SAMMS‐097) 150 mm + ‐ 40mm
What is slump? Water & cement ratio.
What is minimum velocity rpm of truck before the slump test? 10 rotations.
What is maximum height of concrete pouring such as wall & column? 1 meter
What is maximum time of pouring concrete after batching? 90 minutes, 300
(09‐SAMMS‐097 revolts.
Rubber or non‐
Vibrators for concrete compaction in Epoxy steel shell be equipped with.>
metallic.
Place concrete in layers not to exceed and consolidate in one time > 450mm
Aluminum parts are not allowed in the concrete? yes
What is PH value of mixing water? 7 % ( 6‐8 % )
TDS, total dissolved solid water for curing? (1000 Parts per million) 1000 ppm
TDS, total dissolved solid water for mixing? 500 ppm
Concrete trucks without revolution counter shell be? rejected
What is PH value? Acid & alkalis
Each concrete sample taken maximum delivery of each day? 115 m3 or less
What is DFT Dry film thickness
Pull off test for bituminous, minimum required? 1 mpa
Bituminous thickness in 2 coat minimum required 400 micron
ASPHALT WORK
What is minimum and maximum acceptable temperature of Surfer
Asphalt? SAES Q 006 130‐140 'c
What is minimum and maximum acceptable temperature of Asphalt?
SAES Q 006 139 ‐ 163 degree.
What is minimum compaction required for Asphalt? SAES Q‐006 95%
Prime Coat, It is a bituminous material which is used before Asphalt Binder
course to provide a smooth surface. Application required ratio for prime 0.65 to 1.75/Lm2
coat is.? SAES Q‐006
Temperature for prime coat is? SAES Q‐006 50 to 80'
Tack Coat is a bituminous material, it is an adhesive material which is used 0.15 to 0.50/ Lm2 for
for the bounding of two layers of asphalt, application required ratio for RC & 0.20/Lm2 is for
tack coat is? SAES Q‐006 Aramco.
Temperature of tack coat as per SAES‐Q‐006. 65‐105’C
Cores shell be taken daily from previous production at random location
with following rates. 1/600 m2
0 to 4000, RC SECTION 2740 (SAES Q‐006) 1/900 m2
4000 to 20,000 1/1200 m2
20,000 to above.
To confirm compliance with job mix formula random sample of hot mix Extr. Grad. Mars.
shell be taken at the following rates. Grad
0 to 500 tons. 1/200 tons 250
501 to 800 tons. RC SECTION 2740 (SAES Q‐006) 1/250 tons 300
801 to above tons. 1/300 tons 400
Stop asphalting &
If the rain start during laying of Asphalt, what action would you take? continue rolling.
Prime coat and Tack coat shall be tested prior to applications and every 10,000 m2
Reasons behind cracks?
Poor curing practice, poor design, poor vibration which result in segregation, less
Rebar covering, poor quality of concrete, movement of false work of forms, higher
Water cement ratio.
What is the initial setting time of the concrete mix?
‐ 35 to 40 minutes.
When will you apply curing of the concrete?
‐ After the concrete has initially set.
What is the difference between MC‐1 and RC‐2?
By just looking and smelling MC‐1 smells kerosene and looks dull and is thicker,
While RC‐2 smells benzene (gasoline) and looks shiny and is thinner and dries
Rapidly.
What will happen if your asphalt content is more than 0.3%?
Ans. It will be more than required limits &bleeding will occur & thereby weakening
The pavement.
How do you determine Grades 40, 60, & 75 steel bares at the Site?
By its Longitudinal stripe Marking,
Grade40_ No Marking between the longitudinal Strips.
Grade 60_ one line between the ribs of the Steel.
Grade 75_Twop line between the ribs of Steel.
Min length of Splicing of rebar's?
‐ 40D or 40x Diameter of rebar's.
Water with Total Dissolved Solids (TDS) of 10,000ppm or
more?
Brackish Water
How many types of fence as per Aramco (SAES‐ M‐006)
Type and Deferent of fence as per tables below.
Table 2 ‐ Types of Saudi Aramco Fencing.
Height of Brace Barbed Wire
Fencing Fencing Top Posts for Number of Numbe Continuous Concrete
Type Fabric Rail Each Line Supporting r of Anchor
(mm) Post Arms Strands
(1)(2)
I 2400 Yes Yes 2 6 Yes
II 2400 Yes Yes 2 6 No
III 2400 No No 2 6 No
IV 2400 No No 1 3 No
V 2400 No No 0 0 No
Brace Post for Fencing Types III, IV, and V is required at 90 m interval.
Table 3 ‐ Applicable Gate Sizes
Width Overall Gate Post
Fence Type Gate Walk Opening Height Gate Frame Size O.D. (mm)
Type or Drive (mm) (mm) Extensions
I, II, III, IV, V A Walk 1200 2450 No 73
I, II, III, IV B Drive 4000 2800 Yes 102
I, II, III, IV C Drive 7300 2800 Yes 102
V D Drive 4000 2450 No 102
V E Drive 7300 2450 No 102
Table 4 ‐ Post Lengths
Length of Posts (mm)
Fence Type I II III IV V
Walk Gate 3400 3400 3400 3400 3400
Drive Gate 3900 3900 3900 3900 3400
Line 3400 3400 3400 3400 3400
Corner/End 3400 3400 3400 3400 3400
Brace 2900 2900 2900 2900 2900
All posts shall extend 975 mm into concrete footings as measured from the ground
surface. Where solid rock is encountered, posts shall extend 600 mm into concrete
footings.
Footings for all posts shall extend 100 mm below the end of the post.
All line posts shall be equally spaced at intervals of not more than 3 m.
The top rail (41 mm O.D. pipe) for Saudi Aramco General Purpose Fencing Type I
and Type II Fencing shall be continuous except over drive gates. One expansion
coupling shall be used for every 30 m of rail.
Brace posts shall be attached to all Saudi Aramco General Purpose Fencing Type I
and Type II line posts at a point 1500 mm above ground level and extend
downward toward the inside of the fence at 45° in a vertical plane which is
perpendicular to the plane of the fence. For Types III, IV, and V Fencing, brace
posts shall be installed on line posts at 90 m centers of fencing runs.
What is CBR?
California Bearing ratio is a penetration test for evaluation of the
mechanical strength of natural ground, subgrades and base courses beneath the new
carriageway construction. It was developed by California department of transportation
before World War II. (CBR shall be as determined by ASTM D1883).
Percent Passing
Sub‐base Base Material
Material Classes Classes
A B A B
CBR value at min. 95%
25 min. 25 min. ‐ ‐
compaction as per ASTM D1557
CBR value at min. 100%
compaction as per ASTM D1557 ‐ ‐ 100 min. 50 min.
BBS is a comprehensive list that describe the location, mark, type,
size length and numbers and bending details of each bar of fabric in reinforcement.
ASTM: American Society for testing and Materials.
ACI: American Concrete Institute.
AASHTO: American Association of state Highways and transportation Official.
UBC: Uniform Building Code.
SATIP: Saudi Aramco Typical Inspection Plan: A listing of the various required inspection and
testing activities and their sequence for a specific work item.
SAIC: Saudi Aramco Inspection Checklist: A listing of visual Inspection Checkpoints Based
on Saudi Aramco Standard.
NON CONFORMANCE: ROOT CAUSE: What is the reason, why it’s happened.
CORRECTIVE ACTION: How you will close, and which related documents for use.
PREVENTIVE ACTION: How to be safe from the violation in future.
EXAMPLE OF NCR.
NON CONFORMANCE DESCRIPTION (ANALISIS):
December 17, 2018, BI‐660000668 PERMANENT FENCE Type IV. During the daily
routine surveillance at Waqr GCP 1 it was notice that the Construction team proceed
the installation of the Post without Inspection of plasticized sheet vapor barrier Depth
of trench/Boreholes & Elevation for type IV Fence. This is violation according to
SATIP M‐006‐01.
NON CONFORMANCE: ROOT CAUSE: Mis communication of site in charge and QC
department.
CORRECTIVE ACTION: To implement SATIP activity also make sure to have Client
approval prior to next activity.
PREVENTIVE ACTION: Awareness of applicable standards shall be mandatory explain
to all site in charge tool box meeting to be perform prior to start of activity.
ATTACHMENT OF RFI?
1 RFI front page with work inspection description.
2 Related SAIC (CHECK LIST).
3 Related SATIP number.
4 IFC Drawing.
5 Survey Report for specific work, coordinates & Level.
WHAT ARE THE ATTACHMENTS OF MATERIALS RECEIVING RFI?
1 Vendor approval documents.
2 Delivery ticket
3 Materials test certificates.
4 Purchase Order.
5 Coating Documents if required.
WHAT IS SPECIAL PROCESS?
1 Asphalt paving.
2 Concrete finishing.
VIOLATION STAGES: (ARAMCO)
LBE. MINNER.
NCR. MODERAIT.
WORK SHEET. MAJOR.
Issue Date: 25 May 2014 Next Planned Update: 25 May 2019
Approval Procedure for Ready-Mixed Concrete Mix Design