You are on page 1of 2

Independent Verification Agent for the Result Based Financing

(RBF) works for Mozambique Energy for All Project (MEFA)

Sample Verification Template

Customer Location:______________________ District/Municipal/Bairro________________________

Land Mark:________________ Coordinates of Location: ________________________________________

Client Identification No. /Meter/CIU Serial No. : ______________________________________________

Date of Verification: _________________ No. of Participant(s) in Verification: _____________________

Date of Installation:___________________________

Name of Consumer:___________________________

Name of the Household Head (HHS): ____________________________________________

Number of people in the household:___________ Male: __________ Female: __________

Billing Records/Electricity Consumption (in last 3 months): No. of Unit: __________ Paid (MT): ________

Name & Signature of the Participant(s) in Verification:

________________________ ________________________ ________________________


Customer WAPCOS EDM
Independent Verification Agent for the Result Based Financing
(RBF) works for Mozambique Energy for All Project (MEFA)

Technical Requirement Verification Template


S. No. Requirements Yes No Remarks
1 All installed components are new.
2 Equipment (Meter/CIU/MCB/Ready Board etc.) are
mounted/installed properly.
3 Equipment (Meter/CIU/MCB/Ready Board etc.) are
earthed properly.
4 2CX10sqmm AB cable used for the service connection
and the length of AB cable is less than 45mtr.
5 The service connection is not having any road crossing.
6 The service cable is received on the spike/kick pole at
the receiving end.
7 The service connection is having the ready board.
8 Wiring of the house is made by the owner of the
house.
9 The house wiring of the service connection in good
condition.
10 The service connection is having with 5amp 2P, MCCB.
11 The service connection done through pole top box, PC
clamp , dead end clamp etc.
12 The termination of the service cable is done properly.
13 Indications of the meter tampering or other kind of
energy theft or fraud are not found.
14 The Utility supplying electricity to the household for 24
hours.

Observation:
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________

___________________________ _________________________
WAPCOS EDM