You are on page 1of 4
Roll No. G.Pulla Reddy Engineering College (Autonomous): Kurnool Second Sessional Examinations, July 2021 IV B.Tech VIII Semester Civil Engineering CE419: DESIGN AND DRAWING OF HYDRAULIC STRUCTURES (DDHS) (Scheme — 2017) Date : 16-07-2021 Duration: 1.5Hours Max. Marks: 30 Note: 1. Answer any ONE question, 2. Assume any missing data required suitably. |. Draw following features of canal drop with the design data given: (coe) (a) Half plan at top and half plan at foundation level. (b) Longitudinal Section (@) Cross section of U/s wing wall, d/s wing wall & abutment. Design data: Length of the drop wall between abutments: 5.25m Canal Bed Level (U/s) = +10.00; Canal Bed Level (D/s) = +8.00; Profile (cross section) of the drop wall Top width= 1.0m; — Top level = +10.00 Bottom width = 2.6m; Bottom level = +7.60 > Depth of Cistern=0.4m ; Length of the Cistern = 5.0m vvv > Thickness of the solid apron on D/s side =1.00m > Details of Abutments, wing walls and returns Dimensions | Abutment | U/s Wing wall |_D/s Wing wall Top width 0.5m ‘osm 0.5m Top level #1250 12.50 +10.50 Bottom Level 47.60 +850 | __+7.60 Foundation thickness | _1.00m 0.6m 0.6m Front batter 18 18 18 > Notches & Notch pier: Provide 2 Notches in a notch pier of 85 cm width/thickness Protective work u/s | o/s Length of Revetment | 4.5m | 6m Length of Bed Pitching | 2m | 4m (oR) P.O Draw the following features of canal regulator cum road bridge with the design data given (coe) (a) Half plan at atop & half plan at foundation level. (b) Section through regulator vent. (c) Cross section of abutment, 0/s Return wall & U/s Wing wall. Design data: Provide 3 vents of 2.0m width each. Road way: Clear width=3.65m ; Kerbs width = 0.23m ; Over all widt Slab thickness 11m .20m; Top level of slab with wearing coat=23.28m Piers :-2.No's: Total length = 5.61m; Thickness/width =1.00m Parameters Under road way __| Under SOP Length 4.1m 150m Top level of the pier $23.00 424.00 Height from top of the foundation level ea a Shutters: 2 tier shutters Parameters Us| D/s Bed level +20.00 | 420.00 FSL 422.00 | 421.75 Groove depth incanalbed | 8m | _&cm shutter | -loplevel_| +2230 | 421.30 / Height | 1.25m | 1.38m Details of Abutments, wing walls and returns eebuiltt Parameters | Abutment | U/s Wing wall | D/s Wing wall areal Top width “[_05m 05m osm 0.5m Top level 423.28 | 423,00 422.15 423.28 Bottom Level +19.40, +19.40 +19.40 +19.40, Foundation thickness | _ 0.6m 0.6m 0.6m _ 0.6m Front batter 18 18 18 18 Roll No. G.Pulla Reddy Engineering College (Autonomous):: Kurnool First Sessional Examinations, July 2021 B.Tech VIII Semester Civil Engineering C419: DESIGN AND DRAWING OF HYDRAULIC STRUCTURES (DDHS) (Scheme - 2017) Date: 16-07-2021 Duration: 1.5 Hours Max. Marks: 30 Note: 1. Answer any ONE question. 2. Assume any missing data required suitably. 1, Design a surplus work of a tank forming part of chain of tanks. The combined catchment area of the group of the tanks is 28,89Km? and areas of the catchment intercepted by the upper tanks is 20.71Km?, It is decided to store water in the tank to a level of +12.00 meters above M.S.L limiting submersion of fore shore lands up to a level of 12.75M above M. ‘The general ground level at the proposed site work is 11M and the ground level below the surplus slopes of till reaches 10M in about 6M distance. The tank bund has a top width of 2M at a level 14.50 with 2:1 side slopes on either side. The tank bunds are designed for a saturation gradient of 4:1 with 1M clear cover. The foundations of hard graves at a level of 9.50M near the site work. Col Note:- Provision may be made to make kutcha regulating arrangements to store water up to M.W.L at time of necessity. (OR) 2. Design a sluice tanking off from a tank irrigating 200hectors at 1000duty. The tank bund through which the sluice taking off has a top width 2m with 2:1 side slopes. The top level of bank is +40.00 and ground level at site is +34.50. Good hard soil for foundation is available at +33.50. The sill of the sluice at off -take is +34.00. The minimum water level of tank is +38.00. The full tank level is +37.00. Average low water level of the tank is +35.00.The details of the channel below are as under. Co| Bed level =+34.00 PSL 34.50 Bed width = 1.25 m Side slope = 1.5 to 1 with top of the bank at +33.50 eT {Year = eves S nga a inceirraggee T tebe HT + $e fowl RIAD TR WL SOE TO Me A tA ASE Lee (PAT ISTUE » tenenieey 8 wba eh rave (Pomme atl, AIOE teh oii TPH etnias ere ports goa Aeon Unretoec ‘a 8 pn up fos cule © eel sale Bega renee lV, cdi yureg, aoe MLE Forty x Ua) it Fak Aircel elt aint WEEE ey tose w os ud even gaindont 1 EA ovina ret Aauuary abu Nt | a, fo! bl ra rng oT 1 ene ‘baal it 2k ‘egal Ht seo alte eit etl Hees dinwid Sa tt gli | A ihre 0 ema wn NA la tre so Gi VAY iat ES een sitet 5 el Amc is = Ten ATE IE Tr 828 MOE, ot colnet on awed am mT oa ahaenzet Tp yaa ie bt Dared Mmd oF] teh) Me aceeahcelet geteny re Smt rc Thy dgpemines mya ab rage aed gE smo in 1S str rt st mls gl noel br ayn ah chun Bt Cow Sop bats OU le ux th owas ise LY aj at femal mew auspice i ff» ot en Tho ys oY tin ag sid Es an a cat it oab"ny Loe sono oral sugurcowe a Ds let atnan Ohad an RE a da ary selon sn gues Unum) win aa a2 Inns eva ba fig ati iag we EE dtefine Bei OL LP tee coal att te geen an a nk

You might also like