The Architecture, Engineering, and Construction (AEC)
industry is rapidly moving beyond 2D drawings, tedious Interview
calculations, and low productivity to a more efficient and Mr. Rajan Aiyer
organized framework of operations. Building Information Managing Director, 2
Modelling (BIM) has expedited this transformation, bringing Trimble Navigation
effective collaboration, coordination, communication, exchange,
and collation across verticals in the AEC industry. This
Interview
information-rich approach is helping capture, process, and even simulate the behaviour of
real-world assets in the perceived environment after construction. Sundar Chandramouli
Vice President, Bangalore 4
However, even this technological advancement has not been able to address the challenge International Airport Limited
of data gaps in-between stages of planning, operations, and construction. If BIM focuses
on micro-scale data pertaining to the built environment, what it lacks is the bigger picture
placing it into its surrounding context, besides a more robust interface for massive volumes Special Feature
of data. Interestingly, Geographic Information Systems (GIS) are poised to act as this vital Wider BIM+GIS 6
element that can complement BIM in terms of data accuracy, scalability, and the addition of Integration an Enabler of
a geospatial context. Punctuality, Productivity
and Prudence
The Association of Geospatial Industries (AGI) perceives the integration of these two
technologies as the need of the hour for bringing productivity to the Indian AEC industry.
Operating on GIS and BIM as a continuum will benefit real-world asset management, Case Study
including buildings, transportation infrastructure, city planning, and more, through the Comprehensive Enterprise
integration of geospatial, environmental, demographic, engineering, structural, and scientific Application for Ajman
information. AGI appeals to the Geospatial community to dwell upon this amalgamation Municipality using BIM 9
and bring to life the many novel possibilities that BIM+GIS holds for efficient infrastructure
and GIS
management.
Avineon
As a forum for the exchange of ideas, techniques, approaches, and experiences by those who
design, implement, and use geospatial technology solutions, AGI would like to appreciate
the significant contributions of its members towards the development of BIM+GIS in the Article
Indian context. Esri’s ArcGIS GeoBIM’s wide-ranging applications, Trimble’s significant Integrated GIS and
technological integration for the National College for High Speed Rail, and Avineon’s
Geo-enabled Integrated BIM Viewer for the Ajman Municipality, among others, are leading
BIM Technologies for 10
Sustainable Project Delivery
by example when it comes to the application of BIM+GIS for seamless management of
design, cost evaluation, construction, and monitoring. in the AEC Industry
Geospatial World
AGI has been working relentlessly towards the accelerated adoption of Geospatial
technologies in every relevant sector in India, and driving discussions among various
stakeholders of the government, industry, academia, and society as a whole. Proud to Article
witness such a steady penetration of geospatial technologies in construction & infrastructure GIS and BIM integration
management, AGI dedicates this Edition of our Newsletter to the growingly relevant and – An Imperative
futuristic integration of BIM+GIS. for Transforming 12
We hope this Edition comes across as insightful and enjoyable. Stay tuned for more insights, Infrastructure
stories, and analyses from AGI in the coming months. Development
Esri India
Enjoy Reading,
Agendra Kumar
President, AGI

Volume IV | September-October 2021 AGI Newsletter | 1


Interview

The Key is to Create a Constructible


BIM and Combine it with GIS to Drive
Efficiencies during
Construction and O&M
A very flexible, scalable, and easily customizable
collaboration platform is absolutely key to transforming
this industry into an efficient one like the manufacturing
industry, remarks Rajan Aiyer, Managing Director, Trimble
Navigation about the AEC industry in India.

Trimble has been quite vocal about all these stakeholders, including owners, construction industry could such a
the importance of a “connected must always be connected via data that development solve?
construction workflow” involving has been transformed into meaningful
information for directing optimal real- The penetration of digital technologies
architects, engineers, contractors, time decision making. Thus, a very in Indian construction industry is at
specialty contractors, and labour flexible, scalable, and easily customizable a very nascent stage. All stakeholders
forces. How does one ensure such collaboration platform is absolutely key to operate in siloes and somehow think
seamless collaboration for on-field transforming this industry into an efficient that it is the “other guy’s” responsibility
operations on a larger scale? one, like the manufacturing industry. Today, to deliver quality, on-time and within
all information exists but in silos, and is cost projects without any continual
Trimble is the industry-leader in therefore sub-optimal until connected. monitoring/measurement of crucial
Connected Construction Solutions parameters. What cannot be measured
for all stakeholders involved in the The integration of BIM and GIS, can never be improved! That’s the
construction workflow. We see this as an though much talked about, seems
all-new way of executing a construction poised to be not just a consolidation
project, as it simultaneously connects of these two, but of various “What cannot be
the digital world of modeling, imagery,
measurement, and data with the
other advanced developments measured can never
including AI/ML, Blockchain,
physical world of contractors, workers,
equipment, and the jobsite at each stage Big Data, AR and so on. What be improved! That’s
of construction. We strongly believe that pertinent challenges of the Indian the reason 90% of
projects are delayed
and significantly over-
budget and is almost
an expected outcome
which is not good use of
taxpayer monies!”
reason 90% of projects are delayed and
significantly over-budget and is almost
an expected outcome which is not good
use of taxpayer monies! The integration
of BIM and GIS in this regard will have
a synergistic impact on the construction
value chain, that is, 1+1 is not 2 but
4 or 5! But the key here is to create a
constructible BIM and not just a design
BIM and combine it with GIS to drive

Figure 1: Connection Construction for System-Wide Productivity; Source: Trimble

2 | AGI Newsletter Volume IV | September-October 2021


Interview

Figure 2: Comprehensive BIM and GIS Integration for Connected Construction; Source: Trimble

efficiencies during construction and Will there still be any room for robotics in construction, 3D printing
O&M. The power of AI/ML, AR/VR, traditional practices in areas such are exciting areas for advancement.
robotics etc will truly be unleashed during as surveying, asset management The goal again is to make construction
the construction and O&M phases and much like manufacturing in terms of
not in architecture or design phases. This and project monitoring, if and quality, cost and time efficiencies. An
is an area of active R&D for Trimble and when BIM +GIS is adopted in the important goal of integrated GeoBIM
its partners! mainstream for Indian projects? is to be able to synergise the physical
and digital twin information for better
Both GIS and BIM are heavily All the practices you refer to will continue construction management. This needs to
reliant on field data collection to exist because they are the under-pinning be done across the entire construction
and processing, and yet both of any construction workflow. Their workflow in real-time, starting from
form, format, relevancy and usefulness conceptual planning up to O&M. Thus,
reckon entirely different types of will change for the better. For instance, the stakeholders will be well-served to
coordinate systems, number/types instead of 2D drawings we will be using initiate the digital twin paradigm at the
of sources, and data standards, constructible BIM in xD (x=3,4,5…); earliest stage of the project rather than
especially in the Indian context. we would have GIS with millimetre as an after-thought or in the middle of
What, in your opinion, is the way level accuracy; we will have extensive awarding the various contracts.
attribute sets for each and every asset for
forward for a smooth convergence predictive maintenance as opposed to Lastly, in the wake of the new and
of the two? reactive maintenance and use of AI/ML conducive policy environment for
will enhance all these capabilities. Indian the geospatial industry, what is
The integration of constructible BIM construction industry will have little choice
and GIS is an emerging concept even but to accept and train its personnel on the way forward for a faster and
in developed countries and the issues these changes which will make better use inclusive adoption of BIM+GIS in
described are common to all not just of taxpayer monies. a rapidly urbanizing India?
Indian construction industry. The
collaboration platform alluded to Trimble has already disrupted the The new Geospatial policy framework
earlier will be the key to the smooth construction and infrastructure is a big step forward in adoption of
convergence and transformation geospatial technologies in public and
of construction workflow. Key management industries with 3D private sector projects which will
characteristics of this platform include Laser Scanning, full BIM workflow definitely result in better utilization of
flexibility to dove-tail data sources, and Mixed Reality solutions, to monetary, labour, and natural resources.
formats, and coordinate systems name a few. What are some other Similar guidelines for adoption of
seamlessly and customize it for various futuristic applications that we can constructible BIM in large infra projects
stakeholders. The goal is efficient use and others such as Smart cities are
of design and construction data using expect from Trimble in the next needed. Many advanced countries for
a myriad of data collection systems and few years? example mandate submission of 3D
capture real-time status for input into the BIM models for any project approvals.
digital as-built. In spite of all these advances in India can leapfrog into constructible BIM
technologies, challenges in real-time and further offer project incentives for
collaboration, use of AI/ML for predictive adoption of BIM and GIS synergistic
O&M, project bidding & monitoring, practices.

Volume IV | September-October 2021 AGI Newsletter | 3


Interview

Integration of BIM and GIS, AI/ML and


Other Technologies Open Up the Possibility
of Robotic Construction with
Minimal Manual Intervention
Data modelling (BIM) and Spatial Data (GIS) are two sides of
the same coin, shares Sundar Chandramouli, Vice President,
Bangalore International Airport Limited, the first in India
to have used Building Information Modelling for end-to-end
project delivery.

The Kempegowda International in this endeavour. The reason for using time, it has earned GreenCo
Airport, Bengaluru, is the first Building Information Modelling (BIM) Platinum certification from
in India to have used Building for end-to-end project delivery was to the Confederation of Indian
first visualise the new terminal before
Information Modelling (BIM) physically building it to help coordinate Industry’s Green Business Centre
for end-to-end project delivery. all disciplines virtually and speed up and LEED Gold certification
Can you throw some light on the the construction. Further, this would from the IGBC. What role did
reason behind BIAL opting for also facilitate seamless integration with BIM play in the environmental
this technology in the first place, Facilities Management at the handover management plan for the
stage of the project. Additionally, using
and the benefits you could draw BIM enabled us to have all information project?
from it? of the project in a single environment,
including all drawings, specifications, and BIAL always believes in leading by
BIAL is always on the lookout for all relevant project data. example, and is keen to partner with
technology that helps us deliver our other leaders in the industry to achieve
vision of ‘Enabling Journeys, Creating our vision. This led us to achieve the
The Airport has been designed GreenCo certification from CII for
Experiences and Touching Lives as the on the lines of Bengaluru’s
Gateway to a new India’. When the our existing terminal. We are keen to
expansion of our airport facilities was rich history as a “Garden City”, replicate the same for our upcoming
conceived, we automatically began to recalling the city’s expansive Terminal 2 also. In this context, 3D
explore the best tools available to help us parks and plantings. At the same and 4D BIM models have played an
important role in workspace planning,
safety and environmental management.
The models were used for obtaining all
important aero-related approvals and
in discussions with statutory bodies
for environment related approvals.
BIM also played an important role in
associating the appropriate material
specifications to each of the project
documents as well as in calculation of
energy consumption. It was a valuable
tool for maintaining the carbon
footprint classification of each selected
material in a combined database.

What are the shortcomings


that you faced despite or upon
using BIM modelling for the
Airport Design, if any? What
improvements do you expect
in the coming years for a more
seamless process and outcomes?
Figure 1: Kempegowda International Airport Terminal 1, Bengaluru

4 | AGI Newsletter Volume IV | September-October 2021


Interview

Figure 2: Kempegowda International Airport Terminal 2, Bengaluru


The major shortcoming in BIM in an Data modelling (BIM) and spatial data
Indian scenario is the level of expertise (GIS) are two sides of a same coin.
that is required for the various vendors As the modelling is done in BIM all We have experimented in ‘digital
and contractors to manage the project things have GIS built-in already. On one construction’ on our earthworks
digitally. The local industry is not in hand this data is used for construction
pace with all the technological advances coordination and on the other hand this and runway construction which
in the marketplace. This makes it very embedded GIS data in BIM can be easily achieved limited success. In
difficult to collaborate with international ported to any Map software as well as
consultants and specialist vendors with Facilities Management modules. We have the future, this will help in
various levels of skillsets. Additionally, experimented in ‘digital construction’ on
the infrastructure on site is limiting the our earthworks and runway construction automating the construction
bandwidth availability to effectively which achieved limited success. In the process for wide application in
use BIM on mobile devices and utilise future, this will help in automating the
the full benefits of AR and VR for construction process for wide application machine guided construction.
construction. We expect the familiarity in machine guided construction.
of BIM and AR / VR to increase and Irrespective of any scenario, the direct
more effective communication devices The COVID-19 crisis has proved benefit of BIM is that it supports remote
to encourage widespread site-based to be a major deterrent for both working in a collaboration mode thereby
application. the aviation and the architecture, enabling all project team members to
construction, and engineering be in different geographical locations to
Geographic Information Systems contribute and collaborate seamlessly.
(GIS) and BIM have developed (AEC) industries. Looking We have had instances where complex
simultaneously over the last ahead, how do you think the problems were solved in virtual meetings,
few decades, especially for the integration of BIM with GIS, and entire design stage delivered without
construction and infrastructure AI/ML, Blockchain, and other any physical meeting.
management industries. As technologies can help avert such
Integration of BIM with GIS, AI/ML
compatibility between software, a standstill in the face of future and other technologies open up the
standards and data material is crises? possibility of robotic construction with
increasing, what opportunities minimal manual intervention. BIAL
Traditionally construction has been has recognised this potential and is also
do you think an integration of seen as a high contact industry requiring exploring 3D printing technologies by
data modelling (BIM) and spatial high level of physical interaction for supporting startups to innovate in this
data (GIS) can present for mega- any and every transaction. This crisis sphere. This is an exciting phase of
projects in India? has challenged this traditional thinking research and development leading to
and required out of the box approach exciting possibilities for new applications
for progressing the ongoing projects. which we look forward to.

Volume IV | September-October 2021 AGI Newsletter | 5


Source: Unsplash

Wider BIM+GIS Integration an Enabler of


Punctuality, Productivity and Prudence
By Sakshi Singh
Rapid technological developments over Existing Limitations of the Planning & and management, leading to fragmented
the last two decades have made it possible AEC Industries inputs throughout, whether of data,
to envision more transparent, scientific material or capital. This lack of
and robust systems for addressing Construction and infrastructure management of the entire project as a
persistent gaps in the AEC (Architecture, industries are hinged on the requirement whole brings forth challenges such as
Engineering & Construction) industry, of mass data – static and dynamic, misevaluated costs, derisory planning,
with two critical technologies – Building current and historical, geometric and poor quality and unaddressed risks.
Information Modelling (BIM) and semantic, and so on. It is this data that
Geographic Information System often gets lost between the multiple Talking about these very challenges,
(GIS) – having emerged as particularly stages of construction or infrastructure Sanjay Kumar, Former President
relevant. While the former offers the development, due to the critical lack of of AGI and Founder & CEO of
benefits of detailed 3D visualization and reliable and consistent systems managing Geospatial World highlights, “Today,
rapid organization of huge volumes of them. the AEC industry in India needs real-
data related to buildings, the latter allows time linking of information related
easier analysis of spatial patterns and More than 80% of all global projects to construction progress, integration
relationships on a larger scale. overshoot their budgets, and around 20% of project information from multiple
fail to meet their estimated completion data platforms and access to the
Though the two technologies may be dates. While outcomes may or may not same for associated stakeholders,
discrete in their history, purpose and emerge as severe during the construction along with establishment of data
scope, the common denominator of itself, the impact on the later stages of integration capabilities for quick sharing.
“Information” that BIM and GIS project lifecycle management is even more However, the challenge of outdated
share can help establish a common resounding, with several unaccounted- communication, collaboration & file
data environment for all stakeholders for quality & standard deviations due to sharing techniques obstructs the much-
to benefit from. An integration of the inadequate monitoring systems leaving needed data accessibility for AEC
two, popularly referred to as GeoBIM, plenty of room for both manual error and executives, project managers, operators
indeed holds tremendous potential when manipulation. and owners.
it comes to management and application
of as-built data throughout the project Not just these information gaps, even Integrated GIS and BIM solutions
lifecycle. The overlap seems all set to the perceived discrete nature of each have the potential to facilitate a data-
steer the “new normal” of digitalization stage in the project lifecycle is to blame. driven approach to project lifecycle
across the AEC industry, paving the way There are restrictive demarcations among management, including components
for hassle-free and time-saving decision- planning, design, construction, operations of Site Analysis, Planning & Design,
making, higher productivity levels and and maintenance stages regarding the Structural Evaluations, On-Site
overall cost savings. flow of information, communication Coordination, Facilities Management

6 | AGI Newsletter Volume IV | September-October 2021


and Predictive Maintenance. At the The integration can avoid unnecessary and overall performance assessment for
same time, these technologies can attempts in redundant modelling existing spaces. Floor plans and sectional
simplify compliance with development and allow for new data flows in both models obtained from BIM can be
regulations while ensuring sustainable directions. In this way, more detailed BIM integrated onto spatial mapping layers
asset operations and efficient resource data can feed more general GIS data, and, in GIS for more well-informed initial
planning.” on the other hand, GIS data can provide assessments and localized simulations
the context that is usually missing in with the most relevant geographical and
Where a BIM+GIS Integration BIM.” geometrical attributes together.
Fits In
Together with the elimination of Construction
Data interoperability is the only way to irrelevant data silos, GeoBIM can ensure
ensure that the above challenges of the consistency of data flows from one stage Speaking at the Virtual Summit on
AEC industry are met with, enabling of construction to another and prevent Sectoral Value Proposition for the
stakeholders to adopt digitalization the loss of valuable data in between. At New Geospatial Policy organized by
measures across project workflows the same time, this would add an effective the Office of the Principal Scientific
without discrete silos in action. Integrated Geospatial context to the BIM process Adviser to the Government of India
BIM+GIS solutions can facilitate for more well-informed decision-making. and AGI Member Geospatial World,
this much-needed end-to-end data Data storage on the cloud also facilitates Anand Sirohi, Director - Trimble Inc,
interoperability through the establishment instant access, effective management noted, “With the advancement in usage
of a common data environment for and improved coordination, besides of Geospatial technology in the current
effective management of labour, simplifying reuse or repurposing of data. positive landscape, one can secure data
equipment and processes. The overall impact is felt in the form of all the three physical dimensions
of reduced costs, time and wastage of through BIM+GIS. This makes for
Talking about the wide ambit of such materials and other resources. a more comprehensive and complete
an integration, Raghu Ganeshan, evaluation model for the construction
President at Avineon India, remarks, Planning & Design and infrastructure industries, compared
“The use of GeoBIM enables the to the limited alignments used presently.”
delineation between planning, design, In the initial stages of building planning
construction and operations & and design, a BIM+GIS integration For both the construction of new
maintenance phases, leading to a more can save much time and effort by projects and the retrofitting or
holistic approach that is unprecedentedly offering easy accessibility to relevant upgradation of existing ones, the
detailed and accurate. Being able to data for activities such as site selection, integration of BIM and GIS supports
control safety, quality, costs, planning energy design, traffic design, structural an array of otherwise mismanaged
and sustainability throughout an entire evaluations, interior acoustic design, operations, including supply chain and
project lifetime is another key driver. climatic assessments, design authorization schedule management, project time

Building Information Modelling (BIM) for Building Lifecycle Management (BLM); Source: ScienceDirect

Volume IV | September-October 2021 AGI Newsletter | 7


control models, on-site coordination, and
clash or deviation detections according
to as-built data. Timely and accurate
information delivery regarding every step
of construction can be relayed digitally
to different stakeholders, including
labours, contractors, engineers, architects
and owners. Sharing of data becomes
instantaneous, allowing much improved
coordination and decision-making at any
chosen stage.
Operation & Maintenance
Though BIM has so far been generically
viewed and used mainly for 3D
visualization and modelling until the
construction stages, the most relevant
application of an integration of
BIM & GIS lies in the operation and
maintenance stages. Complete building
management systems can be facilitated
using the convergence of these and
other digital technologies to be able to
capture changes in the real-time and relay
responses accordingly. From routine
management of facilities to timely
emergency response during disasters,
from instantaneous virtual inspection at
any given time to predictive maintenance
in accordance with design and quality
standards, integrated BIM models within
a comprehensive geo-information system
can bring all relevant architectural, realms can be effectively integrated to relatively new concept of BIM still largely
engineering services, spatial and semantic obtain much-needed 3D city models, restricted to the early P&D phases of 3D
data onto a single platform for quick or Digital Twins, that can bring about visualization and Detailed Project Reports
action. unprecedented optimization. (DPRs) alone. With the association, and
hence liability of the contractor ending
Urban Development Dr. Aniruddh Roy, Senior Vice with the project construction, owners
President and CTO at Genesys fail to realize the value that BIM can
The integration of BIM and GIS International, remarks, “Urban India offer in the later stages of Operation and
serves as a potential source of requires accurate 3D models of the Maintenance. They are, hence, unwilling
solutions and developments when it cities at various Levels of Details (LOD) to embrace and invest in the technology
comes to city asset management and which are intelligent and semantically for the full lifecycle.
urban development control. From complete for effective governance
automating building permit processes rendering citizen-centric services. These Existing grade control systems for
to facilitating compliance checks at par models need to be integrated with measuring “Productivity” and traditional
with development regulations, scalable decision-making processes used in the methods of evaluating “Returns on
GeoBIM platforms can make it easier city’s planning, design and construction. Investments” also fail to elaborate on
to monitor and ensure sustainable urban Research for the full integration between the utility of a BIM+GIS integration
development despite incoming data from BIM and GIS models through exchanges, on the “Quality” and “Value” of the
multiple sources. Data from all these live data links and simultaneous querying project post-construction. The lesser
of models using CityGML and IFC are in the awareness, the lesser the adoption
progress.” of GeoBIM in the Indian mainstream,
and the longer it will take for the AEC
The Road Ahead: Challenges and industry in the country to reorient
Opportunities its approach, practices and outcomes
towards effective digitalization.
Despite the many benefits and solutions
that an integration of BIM and GIS has However, these challenges are mere
to offer to the AEC industry in general roadblocks, with the several benefits of
and the Indian urban developmental BIM and GIS gleaming as the light at the
scenario in particular, a few persistent end of the tunnel. Leading by example,
bottlenecks remain. The first, and platforms and tools such as ArcGIS by
probably the most important issue Esri, Trimble Connect, and Hexagon’s
that needs to be addressed is the Smart Build Insight, to name a few, are
lack of awareness and acceptance shaping effective use and investment
of such an integration in the into BIM+GIS on the global and Indian
mainstream. fronts. With discussions and knowledge
dissemination regarding this fruitful
The integration of BIM+GIS integration now taking centre stage, it
continues to be viewed with is about time authorities and owners of
uncertainty by many, with the infrastructure projects in the country shift
their attention to this need of the hour.

8 | AGI Newsletter Volume IV | September-October 2021


Case Study | Avineon

Comprehensive Enterprise
Application for Ajman Municipality
using BIM and GIS GeoBIM enabling Digitalization for the Ajman Municipality; Source: Avineon

Digitalization is currently driving the (i) Converting 2D CAD files to BIM • The re-engineering of the business
entire society. It is manifesting itself in (ii) Converting BIM to GIS process for design review by the
many process-oriented fields, including municipality. This was done by
urban planning, building permission, (iii) Develop an interactive BIM viewer generating a Revit model from CAD,
and emergency management processes, application. by using automated tools, and the
characterized by a high number of loading of this model into the 3D GIS
involved stakeholders, both from the Aim and Objectives application
industry and authority side. In order to • The development of a 3D GIS
increase efficiency of these processes, it is The municipality wanted to reap the
benefits of an enterprise geo-enabled, application for viewing and analyzing
necessary to digitally integrate information, BIM models along with query, search,
both between stakeholders and between BIM-based, 3D building model, that can
virtualize a building, starting with the filter, and analytical tools. In addition,
processes. this 3D GIS application was integrated
geo-location of the building, over to the
The building permission process is, to a validation of building code guidelines for with the existing GIS systems and
large extent, a continuous process where CAD/BIM drawings, and also including the database
much information is still handled in paper execution of analytics across buildings and • While providing consultancy to the
format or as independent CAD/PDF files. regions. municipality, Avineon also focused on
With digitalization comes the potential developing System Architecture and IT
to automate the submission, validation, In addition, the municipality wanted to infrastructure sizing to enable system
and permit processes by adopting / convert existing buildings from archived performance.
integrating Building Information Models CAD drawings to a geo-enabled BIM
(BIM) of planned buildings and geospatial environment to enable a seamless view and Avineon also focused on developing
technology – allowing a 3D visualization analysis. applications on Design & System
of the building, and thus making it easier Architecture through customized BIM
to check if the building complies to
Scope and Outcomes: An Interactive viewer tool, 3D WebGIS application
building permission regulations and city
BIM Viewer Application with query, search, filter, analytical tools
master plan requirements. • The development of BIM data and also developed tools for automated
standards, specifications, and a GeoBIM conversion from CAD to Revit model and
Case Study: Building Permit data model loading of Revit model to 3D GIS app. The
Department of The Ajman digitization of building permit process not
Municipality, UAE • The development of a CAD template, only set standard templates & specifications
standards, and specifications to be to enable multiple stakeholders to submit
Many entities are still struggling with a adopted for future CAD drawings building designs in BIM upto LOD 500
manual, long, and inefficient building submissions by consultants, developers, but enabled to visualize buildings in BIM
permission process. The Building Permit and designers before approving designs.
department of the Ajman municipality
in the United Arab Emirates particularly • The development of tools to convert
2D CAD floor plans to BIM, and This simplified the business processes by
faced issues in terms of receiving bringing in efficiency through digitization
building plan drawings in the form of 2D convert BIM to GIS
and enabled the municipality with a 3D
CAD drawings, which did not facilitate • The conversion of close to 15,000 view of the buildings to easily validate plans
the municipality to visualize building legacy building floor plans from paper/ against building standards.
elements in a 3D environment or easily CAD to BIM
validate plans against building standards.
In addition, the 2D CAD drawings also
complicated the execution of standard
building data analytics based on certain
defined criteria.
Avineon partnered with Ajman
Municipality as a consultant to study their
existing processes, investigate the CAD
templates currently in use, and perform
a gap analysis with respect to Building
Information Model (BIM) standards and
readiness to adopt – all in effort to build
an enterprise application that enables:

Figure :The Geo-enabled Ajman BIM Platform; Source: Avineon

Volume IV | September-October 2021 AGI Newsletter | 9


Article | GeoBIM for Digital Architecture

Integrated GIS and BIM technologies can seamlessly interconnect data between worksites, workers and
equipment, thus creating a free flow of information across the project lifecycle; Source: Wikimedia Commons

GeoBIM for Digital Architecture


Integrated GIS and BIM Technologies for
Sustainable Project Delivery in the AEC Industry
Geospatial World
The rapid expansion of global resource utilisation, often resulting in old industry challenges, including the
infrastructure resulting in accelerated increased project costs and durations, and lack of integrated systems, prioritization
construction and engineering projects wastage. of short-term cost management over
demands comprehensive assessment long-term outcomes, poor stakeholders’
of the AEC industry’s role in global Recent studies by McKinsey on efficient communication, and rigid planning &
sustainability goals. Presently, the AEC project delivery performance have shown design systems that are unable to adapt
industry’s contribution towards natural a direct correlation between digitalization to dynamic project demands. Industry
resource extraction and waste generation and a significant reduction in actual experts have embraced digitalized
is estimated at around 30% of the global project costs and durations by 30%-50%, project management to overcome
figures. The built environment has also and doubling of project returns. such challenges, with integrated digital
been found to be the primary contributor solutions, including BIM, GIS and 4IR
to global greenhouse gas emissions, with Challenges & Benefits of solutions aimed at targeted interventions
about 36% of global energy use and Sustainable Project Delivery in project lifecycle, predict outcomes,
39% of CO2 emissions as per the World unified platform for project innovation,
Green Building Council. Project management outcomes targeted and achieve sustainability goals.
at sustainability focus on prevention,
Needless to say, the AEC industry reuse and management of waste, leading Integrated GIS and BIM
requires sustainable project delivery to reduced ramifications on the natural Technologies for Project Quality
models to curtail material waste, energy environment. However, these strategies Management
and fuel consumption. are mutually exclusive due to the
difference in long-term environmental As sustainable construction outcomes
Sustainability in the AEC industry is benefits and short-term economic are tied to a process-driven approach of
primarily driven by project owners and objectives. Sustainable project delivery project management, industry leaders in
operators, contracting firms and the local is a process-driven approach aimed at the AEC market have opted alternative
governments regulating construction providing a structured workflow, and approaches to project delivery including
development. These stakeholders combining the project goals in terms Top Quality Management (TQM), which
influence the process and are capable of social, environmental and economic is considered more process-oriented as
of setting-up project delivery models performance. compared to traditional management
aimed at sustainable project outcomes. systems which are results-oriented. TQM
However, the AEC industry faces Sustainable construction outcomes require prioritises project quality, flexibility and
significant challenges in project delivery an updated project delivery model, with a adaptability, which act as catalysts to
performance and mismanagement of framework capable of addressing decade- sustainable project delivery. Furthermore,

10 | AGI Newsletter Volume IV | September-October 2021


Article | GeoBIM for Digital Architecture

TQM ensures quality & productivity data between worksites, workers and Integrated GIS and BIM technologies
with innovation and adoption of new equipment, thus creating a free flow of also enable risk analysis and provide
technology. information across the project lifecycle. enhanced support for the tracking and
tracing of construction site activities.
Studies have acknowledged the role Project Quality Inspection Presently, several C&E companies have
of TQM in the improvement of core using Integrated GIS and BIM embraced such digitalization solutions
production activities, while mitigating Technologies to achieve improved productivity and to
project waste and improved coordination leverage the power of data-producing
through data sharing within the firm. Project progress monitoring is important computing technologies in workers,
Approaches like TQM can turn out to be in sustainable project delivery, and it is machines and materials. Such integrated
successful through the use of data-driven crucial to incorporate quality inspection digital platforms have resulted in an
operations (robust digital architecture), and identification of the requisite quality impressive 25% improvement in efficient
and efficient project monitoring tolerance as part of progress monitoring consumption of fuel on-site, 15%
platforms. An integrated GIS and in the early stages of the project lifecycle increase in productivity, and 10% increase
BIM platform, or GEOBIM, supports itself. Quality inspection is the process in machine productivity enabling project
development of digital architecture of checking planned work against actual stakeholders to achieve sustainable
for a single source of truth pertaining work on site for checking clash detection, outcomes.
to project information, and facilitates for instance, as well as inspection of
real-time progress monitoring besides as-built elements during the design-to-
data-driven decision making. execution stage. Project stakeholders
must frequently conduct inspections on
“An integrated GIS and
Benchmarking Project Data
using Integrated GIS and BIM
sites to ensure compliance with quality
standards, and to drive sustainable
BIM platform, or GEOBIM,
Technologies project delivery. Integrated GIS and BIM supports development
technologies provide digital support for
Project data benchmarking is a
primary component of effective
design compliance evaluation, with an of digital architecture
array of solutions in the form of non-
quality management practices in intrusive measures aimed at: for a single source of
the construction sector. Besides,
benchmarking also assists the industry I. Architectural assessment truth pertaining to
in the identification of best construction (architectural design, structural
practices that can support a firm’s vision calculations etc.,) project information,
of sustainable construction performance.
However, it is crucial for project
II. Assessment of technical installations
(dimensions, energy consumption
and facilitates real-time
stakeholders to adopt technologies
to track, record and analyse project
etc.,) progress monitoring
workflows, and to develop benchmark
measurements for continuous quality
III. Assessment of health and safety on-
site, and besides data-driven
improvement. Integrated GIS and BIM
technologies can seamlessly interconnect
IV. Environmental impact assessments. decision making.”

Figure 1: Project Delivery Challenges (Source: Why the time is right to reinvent capital-project delivery, Mckinsey)

Volume IV | September-October 2021 AGI Newsletter | 11


Article | Esri India

GIS and BIM integration –


An Imperative for Transforming
Infrastructure Development
The infrastructure sector has become the cycle of organizations that operate and identifying any deviations with respect to
biggest focus area for the Government of build infrastructure. However, there is a planned designs.
India in its vision for a $5 trillion economy significant need to effectively integrate
by 2025. In Union Budget 2021, the those tools at the workflow level, so With ArcGIS for AutoCAD, CAD
government has given a massive push to project participants and stakeholders drawings can be enriched with ArcGIS
the infrastructure sector by expanding can capitalize on their capabilities and hosted maps, imagery, and geographic
the ‘National Infrastructure Pipeline benefits. With an integrated workflow, features. The geographic features can
(NIP)’ and invested budget of $1.4 Tn on infrastructure assets can be better viewed be edited within AutoCAD and can
infrastructure - 24% on renewable energy, in relation to how that asset fits and be used for navigating the drawing
19% on roads & highways, 16% on urban interacts with the surrounding ecosystem. through location. Recently launched
infrastructure, and 13% on railways. Esri ArcGIS GeoBIM is yet another
As we look up to a massive digital example. It empowers project teams, by
However, the sectors still struggle with transformation, the adoption of BIM connecting ArcGIS with the Autodesk
multiple challenges across the entire globally has increased over the last few Construction Cloud and BIM 360,
project lifecycle including technology years. In India, the adoption is still at a to explore and collaborate on BIM
challenges such as disparate data on nascent stage and is slowly and steadily projects and issues using data from
multiple platforms, silos and lack of finding its way into the sector. Nagpur multiple systems in a geospatial context.
collaboration which inhibit a single Metro construction is one of the first GeoBIM enables secure access to project
authoritative view of project data few projects in India to adopt the 5D information, including BIM content,
and consistent communication. The BIM technology & one of the very few in reality capture, documentation, and
Ministry of Statistics and Programme the world to have integrated 3D, 4D, and issues so that project teams can see active
Implementation (MOSPI) 2019 report 5D by the way of integrating ERP with information for better decision making
finds that only in housing projects at least BIM. and collaboration.
355 projects witnessed a cost overrun of
Rs 3.88 lakh crore and about 552 projects In addition, technology advancements These innovations will boost productivity,
have faced time overrun. are driving ease-of-use, higher streamline project management and
accessibility, and a deeper integration procedures, reduce costs, and enhance
Building Information Modelling of these technologies. Esri – Autodesk quality and safety of infrastructure
(BIM) and Geographic Information partnership has helped further build development. In India, the transition
System (GIS) today are the must-have a robust BIM-GIS offerings. Use of towards adopting BIM and GIS has
technologies that are transforming drones has seen a significant uptake in begun as the Government of India’s
infrastructure development. past few years for various applications focuses on improving development
like construction monitoring. The Site through using geospatial and BIM
BIM provides detailed information about Scan for ArcGIS, the end-to-end drone technologies to deliver more sustainable
buildings and infrastructure assets, helping mapping solution, provides a direct and resilient infrastructure. Integrated
create an integrated database(s) of assets integration with Autodesk BIM 360 geospatial and BIM technologies
including a 3D digital representation of where drone mapping where drone site are at the forefront of this digital
their physical and functional characteristics surveys can be used for construction transformation.
and extensive alphanumeric data about monitoring, change detection as well
associated components/objects.
Location is intrinsic to any infrastructure
project. GIS provides information
about these assets in the context of
the natural and built environments and
other vital factors, such as demographic,
socioeconomic, and environmental
considerations. It is a framework for
gathering, integrating, managing, analyzing,
and visualizing geospatial data using
maps and 3D scenes. This helps users
make better-informed decisions about
the operation and maintenance of those
assets.
GIS and BIM have evolved as technologies
serving distinctly separate parts of the life