The document is a daily report from Philton Industrial Supply & Services' Engineering Department summarizing right of way clearing accomplishments from March 14-20, 2023. It shows that 5-person crews cleared a total of 85 spans and 3.44 km of lines across 5 clearing locations. The clearing included various pole and line types, with most spans consisting of 3-phase and underground bundle lines. The report was prepared by Emmanuel Elauria and checked by Engineer David Toriaga Jr.
The document is a daily report from Philton Industrial Supply & Services' Engineering Department summarizing right of way clearing accomplishments from March 14-20, 2023. It shows that 5-person crews cleared a total of 85 spans and 3.44 km of lines across 5 clearing locations. The clearing included various pole and line types, with most spans consisting of 3-phase and underground bundle lines. The report was prepared by Emmanuel Elauria and checked by Engineer David Toriaga Jr.
The document is a daily report from Philton Industrial Supply & Services' Engineering Department summarizing right of way clearing accomplishments from March 14-20, 2023. It shows that 5-person crews cleared a total of 85 spans and 3.44 km of lines across 5 clearing locations. The clearing included various pole and line types, with most spans consisting of 3-phase and underground bundle lines. The report was prepared by Emmanuel Elauria and checked by Engineer David Toriaga Jr.
Cel No. 09228950256/09228814312 email:nicolas_philton@yahoo.com ENGINEERING DEPARTMENT DAILY RIGHT OF WAY CLEARING ACCOMPLISHMENT REPORT
March 14-20, 2023
NO. OF TOTAL AREA CLEARING No. Of POLE NO. CLEARING LOCATION SPANS KM. 69 KV 3 PH V PH 1 PH UB OS REMARKS OFFICE DATE Personnel CLEARED OF LINES From To No Pole No Pole 3/14/2023 San Vicente, Santa Maria 5 23 0.92 0.2 0.72 23 Spans Clear Number Number No Pole No Pole 3/15/2023 San Vicente, Santa Maria 5 16 0.64 0.64 16 Spans Clear Number Number No Pole No Pole EAO 3/16/2023 Paitan, Santa Maria 5 15 0.6 0.36 0.24 15 Spans Clear Number Number No Pole No Pole 3/19/2023 San Rafael, San Nicolas 5 15 0.6 0.6 15 Spans Clear Number Number No Pole No Pole 3/20/2023 Namagbagan, Santa Maria 5 16 0.64 0.08 0.44 0.12 16 Spans Clear Number Number
Prepared by: Checked by: Noted by: