1
Installation0102 © Phase Dynamics, 2002
Flow Through Analyzer Installation
4 3 2 1
D
Top D
TOP VIEW
View
C C
B B
Side View
PHASE DYNAMICS, INC
Earth
PHASE DYNAMICS
RICHARDSON, TEXAS
A TITLE A
FLOW THROUGH
TYPICAL INSTALLATION
SIZE DWG NO. DATE
C SK-1 8 8 1 0/ 2 0/ 00
REV
C PHASE DYNAMICS, INC.
4 3 2 1
2
Installation0102 © Phase Dynamics, 2002
Correct Flow Through Installation
TOP VIEW
Static Mixer
Pitot Tube
Homogeneous Mixture
3
Installation0102 © Phase Dynamics, 2002
Incorrect Flow Through Installation
This Mounting
Allows Gas or Oil
to Build up In the
Analyzer Unless
The Flow Rate is
High Enough to
Flush it Through
4
Installation0102 © Phase Dynamics, 2002
Incorrect Flow Through Installation
Example of Meandering
Flow Pattern Which
Can Create Problems
At Lower Flow
Rates by Separating
and Holding up Water,
Gas or Oil
5
Installation0102 © Phase Dynamics, 2002
Incorrect Flow Through Installation
• Analyzer Highest
Place in the Piping -
Should be In the
Same Plane
• Analyzer on the
Input Side of the
Pump Instead of the
Output
6
Installation0102 © Phase Dynamics, 2002
Incorrect Flow Through Installation
Better than
Previous but,
This Mounting
Would Favor
Holding up
Gas
7
Installation0102 © Phase Dynamics, 2002
Correct Flow Through Installation
Best Overall
This Mounting
Allows
Everything That
Goes In to Go
Through and
Out
8
Installation0102 © Phase Dynamics, 2002
Correct “L” Analyzer Installation
4 3 2 1
D D
Top
TOP VIEW
View
C C
B B
Side View
PHASEDYNAMICS PHASE DYNAMICS, INC
A
Earth A
RICHARDSON, TEXAS
TITLE
FLOW THROUGH
TYPICAL INSTALLATION
SIZE DWG NO. DATE
C SK- 188A 1 0/ 2 0/ 0 0
REV
C PHASE DYNAMICS, INC.
4 3 2 1
9
Installation0102 © Phase Dynamics, 2002
Correct Insertion Installation
4 3 2 1
D D
TOP VIEW
Top
C View C
B B
Side View
Earth
RICHARDSON, TEXAS
A TITLE
A
INSERTION METER
SMALL RUN PIPE DIAMETER
SIZE DWG NO. DATE
10
Installation0102 © Phase Dynamics, 2002
Insertion Installation in Elbow
TOP
Flow Towards End VIEW
Of Analyzer - Prevents
Elbow from Separating
Oil & Water
11
Installation0102 © Phase Dynamics, 2002
Incorrect Insertion Installation
Insertion Analyzer
• Weldolet is Too
X Long
• Analyzer is at the
Highest Place -
Gas Can Be
Captured
• Loop Should be
Same Plane as
Rest of Piping
Then What
Comes in Will Go
Out
12
Installation0102 © Phase Dynamics, 2002
Incorrect Insertion Installation
• Sensing Region of
Analyzer is Not Into
X The Region of Liquid
Flow- Weldolet and
Flange Spacing Too
Long
• The Analyzer is at
The Highest Place in
the Piping - This Can
Allow Oil or Gas to
Remain in the
Analyzer
13
Installation0102 © Phase Dynamics, 2002
Incorrect Insertion Installation
Too Long
14
Installation0102 © Phase Dynamics, 2002
Correct Insertion Installation
• Correct Distance
Between Pipeline and
Analyzer
• Center of Pipeline
Mounting is Correct
15
Installation0102 © Phase Dynamics, 2002
Summary
v Need High Enough Flow Rate to Give Sufficient Mixing of the Oil
and Water - Typically Greater Than 2 ft/second.
v Preference is to Mount The Analyzer Such That it is Not the
Highest or Lowest Portion of the Pipeline.
– The Goal is That Everything Which Goes Into the Analyzer
Goes Back Out The Other End.
– Preference is On the Same Plane as the Earth.
v If Liquids Are Higher In Temperature Than 100 Degrees Celsius:
– Mounting Should Be Vertical With The Electronics Down.
– This Prevents The Excessive Heat From Affecting The
Electronics’ Temperature.
v Insertion Analyzers Must Be Mounted Close to the Entry Point -
Excessive Length of Flange and/or Weldolets Will Prevent
Analyzer From Measuring the Real Flowing Liquids.
16
Installation0102 © Phase Dynamics, 2002
Obtaining a Good Sample
Flow
18
Installation0102 © Phase Dynamics, 2002