You are on page 1of 12

City Development Plan-Thiruvananthapuram

City Development Plan – Thiruvananthapuram


(Submitted to the MoUD, GoI under JnNURM)
Appraisal Report
1. City Development Plan – Thiruvananthapuram, is appraised based on the
Guidelines of Jawaharlal Nehru National Urban Renewal Mission (Sub-missions on
Urban Infrastructure and Governance and Basic Services to the Poor), the Toolkit
accompanying the Guidelines - Formulation of a City Development Plan (Vol 2) and the
Appraisal Guidelines of the Ministries of Urban Development and Urban Employment
and Poverty Alleviation, Government of India.

2. The City Development Plan (CDP), Thiruvananthapuram provides a


comprehensive picture of the city and its evolution, governance, finances, etc., covering
the Thiruvananthapuram Municipal Corporation (TMC) and Panchayats around
Thiruvananthapuram, which are part of Thiruvananthapuram Urban Agglomeration. The
CDP is divided into 18 chapters and 4 Annexures including maps. The CDP covers
demography, economy, landuse pattern, urban governance, infrastructure including water
supply, sewerage, storm water drains, environment, solid waste management, traffic and
transportation and social infrastructure covering health, education etc., urban
regeneration, urban poverty, financial status, investment plan and project implementation
mechanisms.

3. The CDP represents significant efforts of TMC in the collection and analysis of
data and presents the existing situation on various dimensions infrastructure, governance,
etc., identifies the key issues and challenges, articulates the vision, goals and strategies
and action plan, provides cost estimates for various proposals incorporated in the CDP.
Broadly, the CDP complies with the JnNURM Guidelines. It is cohesive and integrated
and provides a systematic analysis of issues, priorities and proposed projects. There are,
however, a few areas, which need strengthening, to make the CDP robust. There are also
a few data gaps in some sectors, which need to be filled. Certain aspects like governance
and vision were discussed at different places, which need to be integrated. Thus the
suggestions offered in this Appraisal Report are aimed at improving the CDP structure
and presentation for a better understanding.

Demography, Economy and Landuse

4. Chapter 3 deals with aspects of demography including population growth trends,


economic base including occupational structure, sectors of growth, land use pattern, etc.
The population details of Thiruvananthapuram Development Authority area are presented

Administrative Staff College of India Page 1 of 1


City Development Plan-Thiruvananthapuram

in Tables 3.3 & 3.4 and details of Thiruvananthapuram Urban Agglomeration area, which
forms the CDP area, are presented in Table 3.5 as per Census 2001. It is necessary to
give population details for the urban agglomeration, area covered by the CDP, over a
period of three decades along with annual growth rates as per Table 1 of Took Kit. The
components of population growth including natural increase and migration should also be
presented as per Table 2 of the Tool Kit.

Defining the CDP Area

5. Details of the panchayats covered by the urban agglomeration, which is identified,


as the CDP area should be clearly defined. In Table 3.5 the constituents of the urban
agglomeration are shown as outgrowths and in Table 3.6 they are referred as panchayats.
Again in Table 3.6 Vizhninjam was shown as a panchayats but in Table 3.5 this
panchayats was not included, instead Kovalam was shown as an outgrowth. There is need
for uniformity in presentation; particularly in defining the CDP area to avoid
complications at a latter stage.

6. Literacy rates were given for the TMC area only and not for the other constituents
of CDP area. This needs to be added. A comparative analysis of literacy levels between
males and females and also between state, district and city levels would provide a better
and comprehensive understanding. The slum population of TMC is given as 11,667 (p.
41) accounting for only 1.57% of city’s population. This is at variance of the poverty
figures given in chapter 14. The figures at page 41 were taken from the Census 2001.
Does the Government agree with these figures? Does it indicate a large number of urban
poor live outside the slums? These need to be clarified.

7. As part of discussion of economy, growth of registered manufacturing and


services sectors and their employment potential should be presented over a period of five
years as per Tables 5 and 6 of the Tool Kit. The economic base of the city and the
surrounding areas, their growth potential, employment, production and constraints need to be
analyzed. A SWOT analysis is also desirable. There is also a need to examine the contribution of
tourism to city’s economy.

8. Land use and growth patterns of developed, underdeveloped and undeveloped


land under use over a period of five years may be given as per the Table 15 of the Tool
Kit. Characteristics of urban land market need to be examined. Another aspect to be
covered is the implementation and impact of Master Plan.

Administrative Staff College of India Page 2 of 2


City Development Plan-Thiruvananthapuram

9. Shortage of affordable housing is identified as a development issue and a key


challenge. But details of housing stock along with a gap analysis have not been
presented. This may be presented as per Table 17 of the Tool Kit.

10. Different aspects of gender and role of women in governance, economy, and
poverty were discussed as part of Chapter 3 on Demography, Economy and Landuse.
The discussion (pp. 51–54) is more general and do not go well with the rest of the
discussion in the Chapter. It is desirable that gender related aspects are discussed in
different chapters like governance and poverty, while retaining aspects relating to
informal sector, social aspects, etc., in this chapter.

Consultative Process

11. The CDP was prepared under the leadership of a Core Committee led by the
Mayor of TMC. The Committee was ably supported by a Rapid Action Group consisting
of officials and senior sector specialists. The Group met on a daily basis, which is
indicative of its seriousness. The CDP is the result of extensive consultations with a large
number of stakeholders from the city and the adjoining panchayats, which are part of
Thiruvananthapuram Urban Agglomeration. The stakeholders consulted include chamber
of commerce, architects and planners, engineers and builders, residents associations,
NGOs, CBOs, women’s organisations, political functionaries including MPs and MLAs,
media, representatives of vulnerable groups, officials at state, district and local levels,
presidents of gram panchayats, etc. The outcomes of the consultations including
priorities identified by different stakeholder groups were discussed and deliberated at
length by the Rapid Action Group and the Core Committee.

12. The role of Ward Committees and Ward Sabhas and Gram Sabhas, which are,
decentralized institutions of governance, is not very clear in the consultative process as
part of CDP preparation. In CDP, it was mentioned that ‘the process of formulation
proposals were crossed checked with aspirations of the Ward Sabhas and Ward
Committees held during late 2005 and the beginning of 2006’(p.6). From this it appears
that the priorities articulated through different stakeholder consultations are only
crosschecked with the priorities identified earlier by these bodies and they are not part of
consultative process for formulating the CDP. Similarly, while the Presidents of
Panchayats were consulted, it is not very clear that the process of consultations were
taken by these Presidents to the panchayats to represent the collective wisdom of the
community of stakeholders. Another important question that arises is whether the draft
CDP prepared along with Vision and priorities was presented to the stakeholders to get

Administrative Staff College of India Page 3 of 3


City Development Plan-Thiruvananthapuram

their feedback before finalization. While these processes may have happened, the same is
not reflected in the CDP. These need to be included.

Studies and Surveys

13. In Chapter I, a number of studies undertaken by different organisations like


studies on Transportation by NAPTAC (1979), Report on Urban Slum in Kerala (1995),
etc., were briefly reviewed. These studies are old and have little relevance to the present
day context. For, example, the Report on Slums (1995) identified only 37 slums in the
TMC area where as the number of slums has gone up to over 355 by 2006. Discussion
and analysis of the conclusions of these repots and studies do not add any value to the
CDP. However, reference can be made to bring home conduct of studies periodically for
purposes of policy making, planning and programming. Similarly, several national level
policy documents like National Environment Policy 2006, Urban Transport Policy 2006,
National Policy on Inland Water Transport 2001, etc., were listed and discussed. It is not
very clear as to their relevance to the CDP. What is critical is to explain as to how these
policies were accepted and implemented in Thiruvananthapuram, their relevance to the
city and the implications of implementing these policies in Thiruvananthapuram.
Similarly, Kerala’s Tourism, IT and Industrial policies were discussed. These policies
and reports may be referred as part of overall context. It is desirable to discuss their
relevance to the city and its growth. Only this would add value to the CDP.

Vision

14. The city’s Vision is presented in Chapter 1 (pp. 12-15) and Chapter IV (pp.56–
62). It is desirable to integrated the Vision and present it at one place either as part of
Chapter 3 or as a separate chapter. The Vision reads, ‘The traditional dignified capital
city of Thiruvananthapuram aspires to become a national city with its strength as a center
of advanced studies, as the hub of modern technology based industries and as a national
harbor city, offering high quality of environment for living, working and visiting’
{(p.56). Seven components of the Vision were discussed separately, each dealing with
specific aspect like knowledge hub, destination of industries, gateway for national and
international tourism, health, poverty, etc. It appears that the Vision can be revisited and
simplified bringing all the seven components into the comprehensive Vision framework.
It is also not clear whether the Vision is result of stakeholder consultations, whether the
stakeholders from different constituents of CDP area – Corporation, Panchayats and
outgrowths, approved it. This needs to be clarified. The sectoral Visions/Goals are
presented in different chapters. It is desirable to discuss the Vision for the city and the
sectoral Visions at one place as suggested as part of Chapter 3 or a separate chapter. The
Vision should also be given in a tabular form as per Table 20 of the Tool Kit.

Administrative Staff College of India Page 4 of 4


City Development Plan-Thiruvananthapuram

Governance

15. The governance aspects of Thiruvananthapuram Municipal Corporation,


Panchyats and reforms at state and local levels were discussed in Chapters 2, 16 and also
in part in Chapter 17. It is difficult to get a comprehensive understanding of governance
framework as it was discussed at several places. It is desirable and necessary, to integrate
these aspects at one place in Chapter 2. This chapter may be structured in such a way
that governance aspects and reforms at state and local levels are presented cogently. This
chapter should also identify the state and local level institutions working in
Thiruvananthapuram city like Development Authority, Kerala Water Authority, Port
Development Authority, Kerala Urban Development Corporation, Clean Mission,
Kudumbasree, etc., discuss functional and financial linkages and overlaps between them,
identify issues of coordination and conversions to provide good urban governance to the
citizens. Implementation of different provisions of 73rd and 74th Constitution Amendment
Acts like functional devolution, working of ward Committees and gram sabhas,
organisation and working of DPC, etc., need to be highlighted. It is equally important to
discuss the impact of ongoing financial and other reforms and implementation of policies
articulated from time to time (p.34).

16. It is hearting to note that the third State Finance Commission submitted its report
and most of its recommendations were accepted. It would add value if a table consisting
of number of recommendations suggested, accepted, rejected, and those pending or still
under consideration of the Government is presented in a tabular form for all three SFCs.
Similarly, it is necessary to discuss the role of private sector in the provision and
operation and maintenance of infrastructure like water, roads and drains, solid waste
management, etc. Data should be presented as per Tables 18 & 19 of the Tool Kit. An
analysis of the impact of some of the governance reforms like Audit Commission,
Decentralization Tribunals, etc., may also be included as they are significant reform
initiatives and that will add value to the discussion.

Infrastructure

17. Urban infrastructure development aspects are discussed in nine different chapters,
each covering a specific aspect like water supply, sewerage, solid waste management, etc.

Water Supply

18. Sources of water supply, treatment and distribution, losses, tariff structure, etc.,
are discussed and key challenges identified in Chapter 5. The challenges include

Administrative Staff College of India Page 5 of 5


City Development Plan-Thiruvananthapuram

rehabilitation of distribution lines, which are very old, expansion of distribution network
to the newly annexed panchayats, and reduction of physical losses, which are estimated at
35.5%. Several projects are proposed at a cost of Rs.1042 crores to achieve the goal of
‘continuous and safe water supply in equitable and sustainable manner’. There is need to
cover the following aspects in this chapter:

• Coverage of water supply distribution network across different areas including


slums and percentage of access to the households;
• Number of house service connections (as against number of households) and
Public Stand Posts in the city;
• Metering system and their working status - percentage of meters working and not
working;
• Tariff for households with non- working meters;
• Expenditure on O&M of water supply system and % of cost recovery;
• The institutional aspects of water supply, i.e., the role of Kerala Water Authority
and TMC – issues of coordination and convergence;
• Methods of coordination and convergence in water supply management with the
villages in Thiruvananthapuram urban agglomeration;
• In the project proposals, changing of non- working meters is proposed over a
period of 6 years at a cost of Rs. 6 crores. It is not clear whether the entire cost
will be borne by the TMC and panchayats or any contribution from the
community proposed? Similarly, as metering is a priority item, which fetches
revenues to the Corporation, could metering be taken on a mission mode and
reduce the period of implementation? These need to be discussed and clarified;
• Communication strategy and human resource development are expected to cost
Rs.3.5 and Rs.10 crores respectively. This appears to be on a very high side. This
needs to be examined; and
• There is need to review the costing of all the proposed projects more carefully.

Sewerage

19. The existing sewerage system is very old and covers only 30% of the TMC area.
Key issues identified include rehabilitation of sewerage network, sewerage overflow into
water bodies causing water pollution, etc. The sector Vision aims at providing a well
planned eco-friendly and high quality sewerage facility to all. Several projects have been
proposed to improve the sewerage system at a cost of Rs.1021 crores. Following aspects,
however, need to be incorporated.

• Number of sewerage connections in the city and the reasons for low access;
• Costs of accessing sewerage connection by households and sewerage tariff;

Administrative Staff College of India Page 6 of 6


City Development Plan-Thiruvananthapuram

• O&M expenditure of sewerage of system and % cost recovery;


• Community’s willingness to pay (from the consultations or any specific studies)
sewerage tariff once coverage improved and distribution network provided;
• Link between proposed sewerage master plan and works proposed under existing
system;
• Likely additional beneficiaries in the TMC area and adjoining villages;
• Ability and willingness to contribute for the provision of the sewerage network by
the villages;
• Rehabilitation of existing network and extending to uncovered areas is proposed
over a period of six year. This will disrupt the normal life if entire city is covered
at the same time. Are there any alternate plans to minimize the problems to the
communities;
• Communication strategy and HRD are proposed at a cost of Rs. 7 and 9 crores
respectively. The costs seem to be high and need to be looked into; and
• The communication strategy and HRD for all infrastructure aspects can be
taken comprehensively to save time and resources. This should be seriously
examined.

Strom Water Drainage

20. City’s drainage network consisting of rivers, canals and their feeders and lakes
were discussed and challenges identified. They include reduced carrying capacity of
drains/canals due to silting, discharge of solid wastes into drains, overflowing culverts,
lack of coordination in the management of drains, problems relating to the conservation
of 212 tanks, etc. The drainage network covers about 60% of the TMC area. Many
projects costing about Rs.175 crores were proposed. At Table 7.5 on costing it was
mentioned Rs. in lakhs instead of crores this may be rectified.

Solid Waste Management

21. Details of solid waste management including sources, practices, coverage, etc.,
were discussed in Chapter 9. Door to door collection of solid wastes covers only 25 of
the 81 wards in the TMC area under ‘Capital City Clean City Project’. Beneficiaries
contribute cost of operations. The TMC proposes to cover 100% of the area with door to
door collection over a period of 6 years. In the budget door to door collection was shown
only in 3 years ending with 4th year. Does it indicate that 100% door-to-door collection
would be achieved in four years? This needs to be clarified.

Administrative Staff College of India Page 7 of 7


City Development Plan-Thiruvananthapuram

Environment

22. Air, water, noise, industrial pollution and disaster management aspects were
discussed in Chapter 8 on Environment. The concentration and increase of pollution
were attributed to the development activities and increasing automobile population.
Quality of environmental services needs to be presented as per Table 14 of the Tool Kit.
Institutional arrangements for pollution control, the relations between PCB and
Corporation, and Panchayats, issues of coordination and convergence and mechanisms to
overcome these challenges need to be analyzed. Untreated sewerage from the treatment
plant finds it way to ‘Parvathy Canal’ (p.101). Similarly, untreated domestic and
industrial wastes, discharge of coolant waters, harbor dredging, dumping of ship wastes;
spilling of cargo chemicals, etc., cause coastal pollution (p.102). But existing
mechanisms and plans for controlling such pollution have not been indicated. These
details need to be incorporated. Similarly, cutting off drainage connections to water
bodies and networking of household septic tanks were suggested to control pollution. But
the projects proposed do not include these suggestions. This needs to be examined. There
is also need to highlight the health impacts of pollution and mechanisms to address them.

Urban Regeneration and Renewal

23. In Chapter 11 on Urban Regeneration changing land use pattern, institutional


capacity of the central business district were discussed. Proposals for regeneration of the
CBD were proposed at a cost of Rs.200 crores. It is not clear whether the CBD also
refers to the old city or is different? If different, various aspects of the old city including
infrastructure, land use, status of heritage building, etc., need to be discussed and
proposals for renewal identified. Similarly, status of housing stock should be discussed
and the need for the renewal of housing stock in the old city should be proposed as
projects under Basic Services to the Poor. The institutional mechanisms and challenges to
address various issues of urban renewal should be clearly identified and discussed. Urban
renewal is an important component of JnNURM.

Heritage and Tourism

24. Tourism is an important part of economy of Kerala and Thiruvananthapuram city


with Fort and heritage buildings which make the city an attractive destination for tourists
– Indian and foreign. Legislative and administrative aspects, government interventions to
protect heritage buildings were discussed and Vision articulated in Chapter 12. The
Vision was discussed twice at pages 157 and 165. It is desirable to integrate them and

Administrative Staff College of India Page 8 of 8


City Development Plan-Thiruvananthapuram

articulate a broader Vision at one place. One of the issues identified to promote heritage
structures is the absence of a regulatory mechanism. But proposals to establish such an
institutional mechanism have not been given. This needs to be addressed.

Traffic and Transportation

25. Traffic and transportation sector is analyzed and presented in Chapter 10. The
analysis is detailed and comprehensive. The current situation, key issues and challenges,
strategies and action plans are well documented. However, the following aspects need to
be addressed to improve the quality and content.

• The vision for transportation is very general and needs to be more focused. It
should specifically articulate what it aims to achieve in the next 15 to 20 years in
terms of parameters such as travel time reduction, increase in share of public
transport, safety, etc.;
• Provision of transport to the poor;

• The list of projects is quite large and appears to be a wish list. The discussion
appears to be consultant and report driven. The projects should be strategic and
should be prioritized. It is not clear what are the expectations of common citizens
with regard to this sector; and
• One major omission is with regard to the institutional issues particularly in terms
of multiplicity, overlapping responsibilities and coordination and need for new
institutional mechanisms or arrangements.

The above issues should be examined and incorporated into the CDP.

Social Infrastructure

26. Several projects were proposed under social infrastructure to develop markets
(Rs. 123.8 crores), service abattoirs (Rs.9 crores), cremation ground (Rs.8.5 crores) and
sports (Rs.15 crores) and infrastructural aspects of health and education were cursorily
touched. Social infrastructure development can be considered as an area for private sector
participation and partnership. Strategies to mobilize resources through partnership should
be articulated.

Basic Services to the Poor

27. Chapters 14 and 15 deal with various aspects of poverty situation and slums in
TMC. Aspects of access to services, programs and interventions, community structures,

Administrative Staff College of India Page 9 of 9


City Development Plan-Thiruvananthapuram

planning process, gender related issues, etc., are discussed and challenges identified and
Vision articulated in chapter 14. Proposals for poverty alleviation have been presented in
Chapter 15.

28. The data on poverty only relates to the Thiruvananthapuram city and it is
necessary to give details of all the constituents of the urban agglomeration including
panchayats and outgrowths. In Table 14.1 average household income was given as Rs.
10,155. It is not clear whether it is monthly income or annual income and this needs to
be clarified. It is also important to discuss household incomes and poverty situation in
the context of poverty line as suggested by the Planning Commission, Government of
India. In addition the following aspects need to be discussed:

• Status of water, sanitation, SWM, housing, power connections, etc.;


• Role of Kudumbasree in implementation of urban poverty programmes and issues
of convergence in the implementation of poverty programmes;

• UPA Cell – its organization and working and issues of inter-departmental


coordination and convergence;
• Community based organisations like NHGs, ADSs and CDS – their working,
contribution to poverty alleviation and development, issues and challenges;
• Lack of convergence was identified as a key issue but the number of institutions
and agencies involved including public, private and civil society, have not been
identified nor their role and issues of coordination highlighted; These need to be
incorporated;
• The Vision states that Thiruvananthapuram should be a poverty free city by 2031
and the roadmap for basic services proposes total elimination of poverty by 2020
(S.No. 7, p.190). A distinction is sought to be made between income poverty and
human poverty. Literacy, health, sanitation, water and housing are high priority
and 100% coverage is proposed to be achieved only by 2031. There is need to
revisit the roadmap and efforts to be made to achieve higher coverage than what
were suggested in the roadmap. By the end of Mission period 2012 coverage of
sanitation and water would be only 55% and 65%. The roadmap may be revisited
and goals fixed. It is also necessary to understand the differences in the goals of
being a poverty free city or slum free city since it is relatively easy to achieve the
former goal as compared to the latter.
• Shelter and shelter upgradation were proposed at a cost of Rs.800 and Rs.50 lakhs
respectively. What is the status of housing, how many houses need to be
constructed or upgraded should be included. Advantage lies in preparing a
comprehensive urban poor housing action plan and submitting proposals to
JNNURM depending upon fund availability. This should be considered.

Administrative Staff College of India Page 10 of


10
City Development Plan-Thiruvananthapuram

• Proposal for housing indicate that only 6,600 dwelling units to be constructed out
of 27,000 households. This constitutes less that 25% over a period of 7 years. The
CDP should indicate what alternative plans the city has to provide housing to all
over a time frame involving private sector, NGOs, etc.
• In table 15.4 (Page 212) identification of destitute families and participatory need
assessment were shown as an activities at a cost of Rs.15 lakhs and Rs.10 lakhs
respectively. Were they not identified under Kudumbasree earlier through
participatory methods? Is it not a continuous process? These need to be clarified.
• In table 15.6 (Page 215) total disabled population in urban areas were shown as
28,778 where as in write-up that follows it is given as 20,837. This is a
discrepancy and need to be corrected.
• Lack of authentic data was identified as a key issue to plan and implement urban
poverty programmes. To develop database several surveys and studies were
proposed like identification of street vendors (Rs. 15 lakhs, p. 211), identification
of destitutes (Rs.15 lakhs, p. 212), identification of children at risk (Rs. 5 lakhs,
p.214), identification of extent of disability (Rs. 2 lakhs, p. 215), identification of
old age people (Rs. 10 lakhs, p. 216), identification of women in distress (Rs. 10
Lakhs, Page 217) etc. Can these surveys be integrated as a comprehensive survey
to save time and resources. Similarly, can communication strategy be integrated?
Similarly can there be a comprehensive plan to establish centers under different
activities? These need to be examined and incorporated.
• The chapters 14 & 15 may be clubbed into one chapter.

Finances and City Investment Plan

29. The discussion on finances and investment plan, presented in Chapter 17, is the
weakest area in the entire CDP and needs to be strengthened significantly. The
presentation is not at organized and coherent. The following need to be addressed:

• There is a discussion on the organizational structure of the Corporation, which


should not have been presented here as discussed in Para 15 above.
• The discussion on revenue and expenditure is very brief. It should be more
detailed in terms of trends and implications over the last five years, with a
forecast for the future. The property tax collections appear to be only 60 percent
and this needs to be addressed.
• The City Investment Plan should be presented first with an analysis of sectoral
break-up and priorities followed by Financial Operating Plan and the future
financial analysis of the Corporation.

Administrative Staff College of India Page 11 of


11
City Development Plan-Thiruvananthapuram

• The tables on City Investment Plan and Financing Sources does not have unit
values and are confusing and hence difficult to interpret and analyze. The tables
should be clearly presented and corresponding explanations should be provided.
• The shares of GOI, GOK and TMC are not clear since unit values are not
presented and also because grand totals are not given. The overall requirements
appear to be very large and this will have serious implications for sustainability
particularly for operation and maintenance. The projections of TMC finances are
also on higher side and not clear.
• This chapter needs to be paid serious attention and should be significantly
improved.

30. There are a few typographical errors and statistical inconsistencies. Some have
already been referred earlier in the Report. A few others are mentioned here to facilitate a
careful editing of the CDP to make it robust. At page 1 it was mentioned that
Thiruvananthapuram became the capital of Travancore in 1750. But at page 149 it was
mentioned as 1800AD. The objectives of Vision of Tourism was repeated both at pages
20 and 21. Table 3.3 was typed as 2.3 (p.39), Table numbers 12.1 to 12.5 were typed as
11.1 to 11.5 at page 159, the area of Sreekaryam, part of Thiruvananthapuram UA was
mentioned as 23.73 sq.km in Table 3.4 and the same was mentioned as 5.03 in page 3.5
(pp.39-40), Sreekaryam was spelled as Sreekariyam in Table 3.6, etc. Though they are
not substantive, these need to be carefully edited and rectified to provide a better reading
of the CDP.

Administrative Staff College of India Page 12 of