Professional Documents
Culture Documents
3. Describe the sequence of extraction and design of the panel to produce 1000 15
tons of coal per day from depillaring panel with LHD’s with pillar size of 40
m at 200 m depth cover. Estimate the Output per Man Shift (OMS) from the
district with suitable mechanization for transport of coal upto the surface
through inclines. Assume other conditions.