1.0 INTRODUCTION
The Factory Acceptance Test (FAT) Checklist is a list of all required inspections and tests, presented as inspection and test plan which must be done by the vendor to determine that the line pipes and related fittings are produced according to the project specification and applicable international codes and
standards.
Section 2.0 below presents the Factory Acceptance Test Checklist for line pipes on the Gas Supply to Ogijo customers EPC Project
Normalizing / Quenching /
2.2.2 Heat Treatment API 5L Tempering Heat Treatment Cycle API 5L
AP Procedure
2.2.3 Chemiccal
al Testing API 5L -Chemical -Chemical API 5L Report
2.3.3 Check of Final Book Project Specifi cation Project Specificati on Datasheet/P.O
2.4 Documentation
2.4.1 Documentation Datasheet/ Spec Mill Test Certificates Verifi cation Datasheet/ Spec Report
2.5.1 Preservatio
onn and Packing Project Specifi cation Project Specificati on Report
2.5.2
2.5.2 Mar
Marki
ki ng Project Specifi cation Project Specificati on Report
2.5.3 Loading
n g Inspection Project Specifi cation Project Specificati on Report