Click Project Manager on the Project menu to access the following page.
At the top is the path where all visible projects below are saved; you can click on the arrow on the
In the Project List section, there are as many folders as there are projects created or imported into
Cube-a; you can sort these projects alphabetically or by creation date using the following icons.
On the right is visible the memory space used in red and the free space in green.
The search bar immediately below allows you to search for projects by typing the name and clicking
on the lens on the right. After searching for projects, click on the cross and again on the lens on the
The icons in the bottom bar are described in the following list:
➢ Share: Share the selected project through the communication channels shown
The default proposed project name is the project creation date, but you can change it by simply
clicking in the space to the right of Project Name. In Cube-a, you can no longer change the name of
the project, you can assign a different name only when you export. All other fields are optional.
The Enable GIS feature is visible only if you have the GIS module and is disabled by default; see
Warning: If you are operating in Italy, do not select the "Retrieve from network" option in the "Sist
Parameter Source" drop-down menu. Reference" because not provided for the Italian permanent
reference bases.
The scale factor from soil to sist. ref. allows you to adapt the measurements made with total station
to the active reference system. For example, if the projection adopted is UTM then the scale factor is
0.9996.
Finally, you can choose a symbol library for the points that will be recorded so that you can assign
different symbols to different types of points; See 6.8DXF Symbol Library for more information.
Each time you create a new project, the following request appears.