You are on page 1of 1
® es || TAIT ipo ee ProlecerWon, BE =10/-00nf6. - Exewvation Locaion: nea’ gatehouse, are, Date:_26=02= 2023 SACS room Frases Name= Pre-Exeavation Checklist Initial 3m site with proponent operation’ rep. Arrange sign-off of this checklist by all parties ae ork Permit (WP) Issuer's organization with this | | checklist and excavation drawing a Provide notifications as equired | | I REPRESENTATIVE | Mahanneet Fela Lopnlg266 SPONSORING ORGANIZATION = ‘Ketion a Determine localion of underground (UG) utes, T 5 | elaine onacing Goer Ai extn Z 5 Verify operational status and operating eondiion of IG | § & [Arango cabcips detec oom icra stows] | EZ | ondrawings and unmarked in the hd i] 4 | proponent ENGINEERING REPRESENTATIVE | Alida ___| ame, phone, signature & date) < “as ers Ae - Remarks ‘g _ | Survey excavalion site with sponsoring organization's ep | ap 36 | Reviewexcavation drawing Be BE [Deengirtnown bes and bok pg posi | Ee | Advise Wr tsuer tout precautions requed ZE | reoronenr oreations representative | o___ gP0ESAL S | (Name, phoe, sina tte) fase ( eal = sconce ‘Action [Remarks Review Saudi Aramco's excavation safety requirements and implement applicable measures ‘Double-check the area for unknown U/G uiiiies by using ‘a cable/metal detector in ihe presence of the WP Issuer Provide WP Issuer with this fully signed Pre-Excavation Chests nd exeavation da ela ee SPONSORING ORGANIZATIONS REPRESENTATIVE A J {Name pone, signature & dt) 2 (Ce: The original eopy of this fin shall be kept in SMS-6 Folder RGANIZATION OF Wonk PERMIT RECEIVER

You might also like