®
es ||
TAIT
ipo ee ProlecerWon, BE =10/-00nf6.
- Exewvation Locaion: nea’ gatehouse, are,
Date:_26=02= 2023 SACS room
Frases Name=
Pre-Exeavation Checklist
Initial
3m site with proponent operation’ rep.
Arrange sign-off of this checklist by all parties ae
ork Permit (WP) Issuer's organization with this |
| checklist and excavation drawing a
Provide notifications as equired | |
I REPRESENTATIVE | Mahanneet Fela
Lopnlg266
SPONSORING
ORGANIZATION
= ‘Ketion a
Determine localion of underground (UG) utes, T
5 | elaine onacing Goer Ai extn
Z 5 Verify operational status and operating eondiion of IG |
§ & [Arango cabcips detec oom icra stows]
| EZ | ondrawings and unmarked in the hd i]
4 | proponent ENGINEERING REPRESENTATIVE | Alida
___| ame, phone, signature & date) <
“as ers Ae - Remarks
‘g _ | Survey excavalion site with sponsoring organization's ep | ap
36 | Reviewexcavation drawing Be
BE [Deengirtnown bes and bok pg posi
| Ee | Advise Wr tsuer tout precautions requed
ZE | reoronenr oreations representative | o___ gP0ESAL
S | (Name, phoe, sina tte) fase (
eal =
sconce ‘Action [Remarks
Review Saudi Aramco's excavation safety requirements
and implement applicable measures
‘Double-check the area for unknown U/G uiiiies by using
‘a cable/metal detector in ihe presence of the WP Issuer
Provide WP Issuer with this fully signed Pre-Excavation
Chests nd exeavation da ela ee
SPONSORING ORGANIZATIONS REPRESENTATIVE A J
{Name pone, signature & dt) 2
(Ce: The original eopy of this fin shall be kept in SMS-6 Folder
RGANIZATION OF
Wonk
PERMIT RECEIVER