CORRECTIVE ACTION PLAN FOR INSPECTION

Major Inspection IN-10660878

COMPANY ASHI&BUSHNAG Co. PROJECT NAME: UPGRADE SECURITY FACILITIES


LOCATION: Date 2/26/2023 Lead Assessor Ahmed Rasheed Aldossari, Radi Aqeel Al- Khaldi
SR NO OBSERVATION RECOMMENDATION CORRECTIVE ACTION TAKEN AFTER STATUS

When the potential for heat-related illness exists,


ABC is complying with approved heat
At the time of the inspection, the contractor the actual heat index shall be periodically stress management plan. Flags for heat
did not have sufficient means of determined (e.g., every hour) at the work site using
1 stress communication have been posted CLOSE
communication on site, to notify the workforce calibrated weather monitoring on each worksite. Rest shelter along with
of hea t stress levels (flags, SMS, etc.). equipment provided by the employer (e.g., the
contractor company). Penality of water is available on each site

Work permits shall be used to control hazardous ABC is fully complying with SA work permit
The inspection team identified on-going high work activities at all SA facilities and system as per GI 2.100. A copy of hot work
2 locations. For SA operated facilities and f or projects permit for specific activity has been CLOSE
risk activities that were not controlled by after the facility, or portion thereof, attached . Meanwhile it can be verifie
anapproved work permit system.
has been certified as mechanically complete, the SA through permit number from operation
work permit system department.

If people or vehicles could be in the vicinity of the


excavation after dark, warning lights shall Excavation caution boards on each side,
3 At the time of the inspection, not all barricades facing the access and road have been CLOSE
requiring blinking warning lights, were be used to mark the limits of thework. If possible, provided. Barricades and blinking lights
the grade should slope away from the
have been installed.
excavation.