An Ultra-Deepwater Success
A Supplement to E&P Magazine
Foreword
of the many legal, tax, finance, contracting, and permitting activities that needed to be coordinated with an enterprise-first mindset. The accomplishments of our engineers and geoscientists on the development of cutting-edge, fit-for-purpose designs are impressive indeed, proving once again that our people are our most important resource. I congratulate each and every one of the individuals who took part in the BC-10 Parque das Conchas development. each of them can take great pride in achieving world-class performance on this world-class project.
The 327 ,000-ton FPSO Espirito Santo takes its place as a visible symbol of Shells ultra-deepwater leadership.
(Photos courtesy of Shell)
Muito Obrigado!
June 2010 1
contEntS
1 4 Foreword: Parque das Conchas Overview Exploration to Production: An Ultra-Deepwater Success A remarkable effort came to a successful climax when first oil flowed from Shells BC-10 ultra-deepwater development offshore Brazil in July 2009. Health,Safety,Security,andtheEnvironment TotalCommitmentCharacterizesBC-10Project A proactive strategy on health, safety, security, and the environment pays off. SurfaceProduction ProductionFacilitiesAreWorld-Class Designed in Monaco and assembled in Singapore, the surface production facilities can efficiently process 75,000 b/d of water injection, 100,000 b/d of oil, and 50 MMscf/d of gas. SubseaProduction ASubseaCityRisesontheSeafloor Most of the BC-10 construction was conducted onshore in Brazil. 14
Corporate Art Director ALEXA SANDERS Assistant Art Director MELISSA RITCHIE Graphic Artist FELICIA JONES Production Director JO LYNNE POOL For additional copies of this publication, contact Customer Service +1 (713) 260-6442.
19
28
Group Publisher, E&P RUSSELL LAAS Associate Publisher, E&P DARRIN WEST Director of Business Development ERIC ROTH
Vice President, Consulting E. KRISTINE KLAVERS Executive Vice President and Chief Financial Officer KEVIN F. HIGGINS Executive Vice President FREDERICK L. POTTER President and Chief Executive Officer RICHARD A. EICHLER
On the cover: Parque das Conchas (Shell Park) lies almost 1 mile (1.6 km) beneath the FPSO Espirito Santo about 75 miles (121 km) southeast of Vitria, Brazil. It is operated by Shell on behalf of co-venturers Petrobras and ONGC Videsh. (Photo courtesy of Shell)
39
DevelopmentDrillingandCompletion DrillingChallengesandInnovations Drilling the BC-10 development wells required great precision and careful control of equivalent circulation density. Many drilling records were set in the process. FuturePlans TodayandTomorrow Plans include development of a fourth field, with first oil in 2013.
48
49
Acknowledgements TheParquedasConchasTeam The BC-10 project required the expertise and dedication of many individuals. CompanyProfiles ItTakesTeamwork Shell had many partners on the BC-10 project.
50
June 2010 3
BC-10 production flows to the FPSO Espirito Santo, where it enters the massive turret assembly in the forepeak, then through the swivel tower on top before being routed to the two processing trains.
(All images courtesy of Shell)
Vitoria
~Gasoduto
Porto de Ubu
The BC-10 block is located about 75 miles (120 km) south southeast of the city of Vitria and lies offshore of the Brazilian state of Espirito Santo. it lies just east of several prolific blocks developed by Petrobras.
k 20 ~1 m
ES RJ
BC-60 Argonauta
Ostra
BC-10 Nautilus
Abalone
BC-60
Overview
June 2010 5
Great care was taken to ensure that the local fishing community was kept informed, and that field development activities did not interfere with their livelihoods.
coordinated way, so that the entire project came together seamlessly like a fine piece of music. The diverse aspects of offshore field development transcend drilling and completion. They also include permitting, contracting, human resources, health, safety, and the environment, all of which were essential and critical to success. That the project was accomplished on time and on budget is a tribute to the hundreds of workers both within Shell and within the ranks of its co-venturers, its contractors and suppliers, and those of the various agencies of the government of Brazil. Field description Sometimes discoveries are attributed to good fortune or blind luck. In fact, a recently discovered deepwater field in the Gulf of Mexico is unabashedly named Blind Faith. However, in most cases, discoveries are all about knowing where to look, and interpreting the subtle clues that encourage additional exploration until a scientifically supported drilling case can be postulated. Starting with the investment in existing seismic data, the search began, culminating in the decision to purchase the BC-10
6 June 2010
n
block and launch a five-well exploration drilling campaign. During the search and evaluation phase, additional seismic in the form of a more definitive 3-D survey was acquired. A large area spanning some 4,900 sq miles (12,500 km2) was acquired from which the BC-10 joint venture partnership purchased about 1,172 sq miles (3,000 km2). Shell geoscientists participated in the processing of this data. Approximately one dozen prospects were identified and detailed from these seismic data. The four fields constituting the BC-10 block were not easy to evaluate. The first well drilled in 2000, the 1-Shell01-ESS, probed what later became Argonauta B-West and penetrated the oil/water contact, which in itself is a powerful clue to evaluating the prospects possibilities. The planned five-well program quickly grew to eight wells that were drilled between 2000 and 2004 as geoscientists built their initial models. Ultimately, a total of 13 exploration and appraisal wells were drilled and evaluated in the exploration phases from 1999 to 2006. Eight successful wells discov-
ered and delineated six separate oil accumulationsan admirable success ratio in anyones bookstill significant uncertainties remained. The gaps in pre-development reservoir knowledge were so significant that plans were in a state of flux right up to the time the field development wells were drilled. To understand why the prospect was so puzzling, it is worthwhile to look at its geology and morphology. Situated at the northern extent of the Campos Basin, offshore Brazil, are several prolific fields on the South American continental shelf. These have been developed over several years by Petrobras, the national oil company of Brazil, and others. The fields lie closer to the coastline than the BC-10 block, which is about 75 miles (120 km) southeast of the coastal city of Vitria. But they are in much shallower water. Nevertheless, there are several correlations between sedimentary sequences penetrated by these shelf wells and those found in the BC-10 block. These correlations provided encouragement to the BC-10 explorationists. Shell geophysicist Gunnar Holmes provided details of the regional geology. Like a complex puzzle, the geological description was put together by considering all available information. The challenge in these situations is virtually the same everywhere. The information does not come simultaneously, nor is it in an actionable form. As a result, each clue must be evaluated and carefully weighed. The geoscientists must be skeptical, because often, early theories are contradicted by subsequent revelations as more, definitive data are acquired. Raw data must be processed and assumptions must be validatedit is an iterative process that requires infinite patience and inquiring minds. The earliest studies involved a regional 2-D seismic survey that had been acquired prior to entering the block. After committing to explore Block BC10, a 3-D survey was acquired from
WesternGeco. Encouragement was provided by the identification of full stack bright spots that usually signal the presence of structures compatible with hydrocarbon accumulation. Holmes wrote in a geological description of the region, The BC-10 survey area covers a passive margin basin. The discovered BC-10 fields to date are post-salt, occurring in deepwater Upper Cretaceous through Paleogene turbidites overlying or adjacent to saltinduced structures. Piercing salt walls and diapirs are dominant to the east of the block while salt swells are dominant toward the west. Sediment sources are interpreted from the west and northwest. Amalgamated sand-filled channels and turbidite aprons, with large areas of overbanks (sands, silts, and shales) are the dominant depositional features. All of the BC-10 oil fields are deepwater sand-dominated turbidite reservoirs with different structure and stratigraphy closures. Ostra is an Upper Cretaceous age sandy turbidite valley system draped over a salt dome. Abalone is
a salt flank, mini-basin ponded Cenomanian turbidite system. Argonauta-BW is a Lower Paleogene channel belt complex of turbidite sands with a combination of structure drape and stratigraphic closure. Argonauta-ON is an Eocene age stratigraphically controlled, sandy turbidite apron. BC-10 is off the continental shelf, on the lower slope, in waters ranging in depth between 4,600 and 6,560 ft (1,400 and 2,000 m). There is evidence of extensive subsea landslides throughout the area as vast masses of sediment sloughed off the shelf and cascaded down the slope. This is seen in the turbiditic nature of the rock extending from the mudline down into the reservoir itself. Detailed geomechanical studies conducted for shallow-drilling hazards evaluation from the seabed down about 135 ft (41 m) below the mudline uncovered a field of scattered mass transport deposits, which consisted of huge buried chunks of sediment floating in a sea of debris, the artifacts of recent landslides off the continental shelf. At deeper levels, as if to complicate the
BC-10 Discoveries
Argonauta-ON, Argonauta-OS Accumulations Argonauta-BW, Nautilus Accumulation Ostra Accumulation Nautilus Accumulation
Abalone Accumulation
The stratigraphic sequence at BC-10 indicates a complex column with post-salt discoveries in the Ubatuba and Namorado formations.
Parque das ConChas
n
June 2010 7
evaluation, several salt diapirs thrust upward from beneath the reservoir creating extensive faulting. The reservoir itself is challenging, consisting of Paleogene and Cretaceous age sediments that are largely unconsolidated with complex mineralogy. The strata at Ostra were characterized by a very narrow window between the fracture pressure gradient; that is, the pressure at which the rock would fracture and pore pressure gradient, the pressure of the fluid occupying pores in the rock. Drilling under these conditions is inherently risky. If mud pressure is too low, an influx of formation fluid could enter the borehole, possibly initiating a blowout or the formation may become unstable and collapse. Conversely, if mud pressure is too high, the formation could fracture and drilling fluid could be lost, damaging the formation and leading to a potential blowout.
The rock physics models derived from the well data and the resulting modeled seismic responses were validated early in the discovery phase.
Shell geophysicist Gunnar Holmes
According to Holmes, The rock physics models derived from the well data and the resulting modeled seismic responses were validated early in the discovery phase. Additional wells provided refinements but no contradictions to the rock physics model that sustained successful seismic amplitude and attrib-
ute work. Definition of direct hydrocarbon indicators (DHI) amplitudes for many of the initial wells in the first tier, high probability of success (PoS) prospects, was not difficult: the amplitude extremes are highly correlated to the hydrocarbon accumulations and the prospects generally had multiple DHI
The Parque das Conchas: Four Shell-operated BC-10 area production licenses are shown in red. Extensive Petrobras development can be seen to the west of the BC-10 fields in the Parque das Baleis.
8 June 2010
n
attributes. On the other hand, the second tier of prospects with spotty to low amplitudes was often difficult to refine, and even with additional analyses, the PoS could not be improved above 50%. To resolve geologic and geophysical questions within BC-10, we conducted reprocessing projects on smaller field areas within BC-10, to follow up specific field discoveries and support appraisal work, as well as development activities. The determination of Shells geoscientists to follow the clues revealed by the data enabled the generation of increasingly valuable information through additional analyses. By collaborating with many Shell and vendor experts, an investmentgrade reservoir model evolved that continues to provide useful information and that will be invaluable when additional development wells are considered. Challenges Despite the drilling risks, seismic exploration of the area was promising and was complemented by data from wells on the continental shelf and continental slope between the BC-10 block and the Brazilian coast. Further encouragement to proceed on the BC-10 development came from the fact that the task was well within the realm of possibilityproven technology existed to characterize the reservoir and implement its exploitation. With the technical hurdles deemed solvable, the only remaining challenges were purely economic onescould an economically attractive and sustainable solution be found to achieve reasonable recovery factors for the medium to heavy crude, safely and with concern for the environment? Shells involvement When thinking about the BC-10 project, one theme consistently rises to the surface. The project is a textbook example of coordination. How else could one characterize a program whose diverse and technologically complex phases were simultaneously conducted in
different locations around the world, and ultimately executed so successfully? Using a multinational, multicultural team operating in a number of different time zones and integrating the hardware, software, and labor of more than two dozen separate suppliers amounted to orchestration on a global scale. In a macro-sense, the major components of the project can be segmented
into seven separate efforts: exploration and appraisal, permitting, development drilling, facilities construction, well completion, subsea installation and tieback, final assembly and commissioning. But most of these activities were carried out concurrently on a global scale. That they all came together seamlessly on time and on budget is a tribute to the ingenuity and perseverance of the team members.
The Enhanced Pacesetter design, six-column semisubmersible Stena Tay was converted for deepwater service in 1999 as the demand for deepwater units soared. Its water depth capacity is 7,546 ft (2,300 m).
June 2010 9
Coordination was the name of the game, both in the macro sense and in the micro sense. Like the precise movement of chess pieces on a chessboard, individual offshore activities had to be carefully sequenced, so there were no clashes, and no gaps in critical work flows. The comings and goings of each vessel were not only timed to ensure no two vessels were scheduled to occupy the same space at the same time, but the needs of indigenous fishermen in the area had to be taken into account. If even one vessel was delayed for any reason, the result was a domino-effect that cascaded through the plan, often necessitating a total plan rebuild. Shell offshore coordinator Mark Kite explained the challenges of coordinating simultaneous operations (SIMOPS). A key objective was to minimize the time from project launch to first oil. Coordinating the activities of multiple vessels, sometimes numbering as many as 10, was a major challenge. Our goal was to minimize vessel downtime or standby time. Many of the vessels work scopes conflicted with each other due to their physical location, and
Argo-BW
Depths Below Mud Line
Coordination is not something you do once; it is a continuous 24/7 job from launch to first oil.
Shell offshore coordinator Mark Kite
coordination was required so some could work simultaneously without compromising safety. This required gaining the respect and cooperation of several workgroups both within and outside the company. Naturally each group was looking after its own interests. I had to convince them to focus on best-forproject solutions. Kite continued, Deepwater offshore vessel costs are very high. For example, rig spread costs were more than US $1 million/day. Pipeline lay barges cost upwards of $700,000/day, and a great deal of money might have been lost if a vessel were required to standby while another vessel completed an activity. In addition, the added time would have delayed first oil.
Ostra Abalone
Asked to explain how the challenges were successfully addressed, Kite said, Planning and communications. We needed to have good plans that were communicated to all stakeholders. But most important, we needed built-in flexibility to react to changes. A big part of our success was gaining the cooperation and respect of the other [Shell] team leaders and the clear understanding that we were all working towards a common goal. The success we experienced was exceptional. We had very little downtime and first oil was in line with the P10 [most optimistic] schedule. Many times delays were avoided by only a matter of a few hours, and often, when one vessel experienced problems, another pitched in to help out. I recall a specific example when the umbilical cable laying vessel helped the drilling rig by providing remotely operated vehicle support. A well-coordinated SIMOPS plan reverberates throughout the project, and can eliminate or at least minimize logistics problems, project delays, conflicts, and most important, safety incidents. Coordination is not something you do once, Kite concluded. It is a continuous 24/7 job from launch to first oil. No matter how well the project is planned, something will come up that requires a change. Fortunately, we knew this from the start, so we had contingency plans we could implement while we regrouped to get back on the main plan. Im proud to say that the project was completed with minimum to no vessel standby charges and early first oil.
Ostra is very shallow and it is difficult to turn the boreholes to the horizontal through these relatively soft overburden muds into the reservoir oil sands.
Location Map
Argo-BW Ostra
Aba.
A 3-D seismic line through the BC-10 block illustrates the complex post-salt structure and closeness to the mudline (seabed), the principle challenge for the drillers.
10 June 2010
n
Depth (mbsl)
Good citizenship The coordination involved more than logistics. Government permits had to be obtained, bids tendered, and contracts written. The local population had to be kept informed and their rights taken into account. Unlike many nations with offshore production, Brazil has given certain rights to the inhabitants of coastal communities regarding the development of offshore areas lying opposite their villages. These rights must be honored, and permission must be obtained at the local level before operations could commence. Coastal communities actually hold a stake in the hydrocarbons produced from off their shores, and these stakes must be clearly established and agreed to in advance. In addition, all equipment and supplies brought to the project from outside Brazil had to receive customs clearance and any duties paid. This was true even for items that never actually landed in Brazil, but were brought into the coastal waters with the floating production storage and offloading (FPSO) vessel. All of the above items fall under the category of good citizenship and Shell was determined and totally committed to be a good citizen. This meant going above and beyond the minimum requirements, and taking a proactive stance to ensure that Shell, its employees, and its contractors were viewed as highly desirable members of the community at large. Two areas stand out as excellent examples of community stewardship. Not surprisingly, the first was the extension of Shells HSSE initiatives to all contractors, subcontractors, and stakeholders. Not satisfied to simply establish a safe workplace offshore with zero incident objectives, the company rigorously enforced its Life Saving Rules on all service and supply companies, on land or offshore, engaged in the project. Secondly, the company supported environmental groups in monitoring activities to ensure that none were detrimental to the local populations of whales or other sea creatures. This
extended to fish and oyster farms along the coast. The concerns of the commercial fishing community were addressed. A perfect example of Shells safety commitment played out onshore. A Brazilian pipe yard was engaged to assemble and apply protective coating to the miles of riser pipe that would be needed. On an initial inspection of the facility, it was observed that a pipecoating machine had no emergency shut-down switch. Shell insisted that the operation be discontinued until the machine could be retrofitted. A few days later, a workers coat became entangled in the feed mechanism. Trapped, he was being inexorably drawn into the machine where he most certainly would have been maimed or killed. The worker was able to push
The Transocean Deepwater Navigator underwent a US $305 million conversion in 2000 to bring it back to drilling mode, increasing its water depth capacity from 2,500 to 7,218 ft (762 to 2,200 m) and modernizing its drill floor equipment. Added flotation sponsons can be seen along the sides of the drillship.
the emergency button, stopping the machine, and was subsequently disengaged from the feed mechanism by his colleagues. By refusing to turn a blind eye to workplace hazards not on company property, the Shell inspector likely was responsible for saving a life. Early planning Between the initial BC-10 discovery in 2000 and 2005, an aggressive
Parque das ConChas
n
June 2010 11
Trained teams tagged and monitored the whale population using sophisticated electronic beacons and GPS devices, analyzing the animals movements and behavior in the vicinity of the BC-10 block to prevent infringement on habitats or traditional migration lanes.
exploration and appraisal program was followed to map the field and delineate its reservoirs. Four separate reservoirs were identified: Ostra, Abalone, Argonauta B-West, and Argonauta ONorth. The decision was made to develop the prospect as a cluster development in two phases. First, the Ostra, Abalone, and Argonauta B-West fields would be developed in Phase I; then Argonauta O-North would follow in Phase II. The fields were named after indigenous shellfish from the area, using their Portugese names. Accordingly, the BC-10 area was named Parque das Conchas, meaning Shell Park. In December 2005, a Declaration of Commerciality was signed with ANP (the Brazilian National Petroleum Agency) and the project was sanctioned in November 2006. During the exploration period, the objective was to gather sufficient information to put together a development plan. Seismic analyses were conducted by Shell to refine specific prospect areas and the uncertainties prior to drilling.
12 June 2010
n
As each well was drilled, it was logged extensively. All seismic, drilling and logging data were integrated, forming the kernel from which a comprehensive 3-D reservoir model would be derived. In all, 13 wells were drilled with six field discoveries, and all of the subsurface information enabled the partners to write a compelling Declaration of Commerciality for submission to the government. The exploration drilling was conducted by the dynamically positioned semisubmersible drilling unit Stena Tay and the dynamically positioned drillship Deepwater Navigator.
Because of the water depth, a subsea development and production scheme was envisaged. The decision was made to gather all production from each field, perform initial processing on the seabed, then boost the production up to an FPSO vessel, moored at a more-or-less central location. During the early planning stage, a search was begun for such a vessel. n
A series of community meetings was held, and members of the local population were encouraged to share any concerns.
Phase I Management
Start
Finish
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
2010
A
2 M
Jun-06
Mar-09
VAR 4
FID
PREVIOUS (LP)
(L1)
(L2)
(L3)
(L4)
START UP (L5)
CONTRACT AWARD Nov-06 Nov-06 Nov-06 Jul-08 Aug-08 Jun-08 Jul-08 Apr-08 May-08 Jun-08 Jun-08 Jul-08 Oct-08 Dec-08 Jun-09
HULL
Design & Precurement Hull Conversion Design & Precurement Fabrication Design & Precurement Fabrication
TURRET
FPSO
MOORING
A typical project time/activity chart illustrates how simultaneous components of the project were managed to result in a seamless assembly, on time and on budget.
Sep-07 Jul-08 Apr-09 Jun-09 Dec-08 Apr-10 Apr-08 Apr-08 Sep-08 Nov-08
Design
Fabrication
Subsea
Oct-08
THS/Tree Deliveries PLET Deliveries PM1 & ALM1 Manifold Deliveries PM2 & ALM2 Manifold Deliveries Subsea Control System Deliveries Complete Precom F/L & Umbl. Abalone Appraisal - AW BW Appraisal BW Production OSTRA-PM1 Abalone Production - AW Gas Disposal OSTRA-PM2
P7H
Feb-07
Wells
Mar-09
NOTE:
= Offshore
= Design
= Fabrication
= Deliveries
= Permits
= Integration
(L1) = D & C, trees and ALM installation; (L2) = Risers, flowlines, jumpers, manifolds and flying leads installation
June 2010 13
areas, but HSSE cannot be measured by the number of plaques on a managers wall; it is a mind-setan attitude that must permeate the conscious and unconscious acts of every employee, every contractor, and every stakeholder. HSSE begins with sharing a culture of commitment with all affected parties, by setting the example, employing best industry practices in every endeavor, and providing leadership. Fostering this attitude in such a way that it permeates the vast universe that constitutes the BC-10 area of influence
starts at the top. Robert Patterson, Shells vice president of Upstream Major Projects, Americas, said, Our ability to work as a team internally, and our ability to partner with others externally, should stand as an example of cultural, technological, and sustainable diversity. The conventional wisdom is that you cant do this sort of thing; you cant break the team up, spread them over multiple time-zones, challenge them on several levels, some outside their discipline, and expect resultsbut we did. The BC-10 story is one of bringing people together in a
Shell was determined to leave the beautiful Brazilian coastal environment untouched by hydrocarbon development just offshore. (Photo courtesy of Shell)
common theme, working together to achieve a goal, bringing the very best to bear, and accomplishing something thats truly remarkable. Kent Stingl, BC-10 project manager, added, This element of partnering is not just an internal one, nor is it limited to our suppliers. It also includes the local community and the environment in which we work. We wanted to ensure that our immediate neighbors were informed and involved from the beginning, just as we wanted the global community to know we were protecting their environmental interests as well. In this regard, our corporate policies of no harm to people and protection of the environment stood us in good stead. Ignorance is the worst enemy of a project of this sort. If the stakeholders dont know whats going on or whether it affects them personally, speculation
and conjecture can poison their ability to behave or think reasonably. Accordingly, Shell adopted an open-stance from the very beginning of the project, holding popular town meetings with interested and affected parties from all over Brazil. These events included transportation and accommodations for three days. Every aspect of the
project was discussed, questions were addressed, and follow-ups were implemented where necessary. In Brazil, the indigenous population shares in the profit from development in the sea offshore from its communities, so the people were indeed stakeholders. Others, like the fishermen, were
Our ability to work as a team internally, andto partner with others externally, should stand as an example of cultural, technological, and sustainable diversity.
Robert Patterson, Shells vice president of Upstream Major Projects, Americas
Parque das ConChas
n
June 2010 15
RISK
Main Barriers Risk assessment Competent supervision Effective toolbox talks Physical, clearly visible barriers Adequate lighting Good housekeeping Approved scaffolding structure Fall arrestor securely in place
Comment A number of fatal or near fatal injuries recently in other projects when workers removed boards or planks and fell through a hole below. Recent MOB with plywood board covering hole and earlier fall down ladder on vessel. Fatal incidents elsewhere: The addition of the hatch in the walkway should have been risk assessed and a MOC process followed. Better to not install these hatches. Risk assessment hierarchy: Avoid, prevent or mitigate falls. Leadership reinforcement of toolbox talks required.
1. People falling from heights (into holes, from working platforms, collapse of structures) resulting in major injury or death
Inspection of lines Assessment by competent persons of loading Toolbox talks Physical barriers, separation distance
Spooling, guy & support cables, anchor chains, tow & barge tie-off ropes, slings. Testing of vessel propulsion system shall not be carried out whilst moored. Review of spooling activities has taken place. Shell lifting and hoisting. Numerous high potential consequence incidents recently eg during riser pull-in.
Security induction Avoidance of high risk areas Awareness and minimisation of profile Appropriate response if confronted Selection of suitable location and housing JMP compliance
Brazil mostly, numerous incidents involving attack on pedestrians and car jacking. Exposure increased by travelling alone. A means of contact when travelling and location details are helpful for recovery and assurance if delayed return. Location for residence, temporary stay and travel. Residence should meet security recommendations. Recent incident in Copacabana involving spiked drinks.
For lifts: PTW and associated controls Competence of L1 & 2 critical positions Competent supervision Effective toolbox talks Controlled lift area Effective communications Sound lifting procedure Pre-use inspection Functioning safety devices Operation within environmental limits Area below remains clear of personnel Work carried out only when weather does not jeopardise safety
Incident in Nov 08 resulted in fractures. Huge amount of lifts has taken place; both major lifts of items onto the FPSO and more routine lifts. Major lifts onto FPSO now complete. Numerous dropped object hi-potential incidents at Singapore yards. For major lifts, lift plan signed off by technical authority. Many of the controls listed will be within a specific PTW. Crane operators and riggers are L1 critical. Hard hat has prevented significant injury in a number of recent small object incidents
16
June 2010
RISK
Main Barriers Non-lifts objects being carried or objects positioned at height: Toolbox talks Housekeeping Inspections Protect area below e.g. netting or restrict access3 point contact when using ladders Toe boards on scaffolding Kick plates around openings in floors.
Comment Equipment and tools may fall Tools not to be held when using ladders Incorrectly secured tools when using ladders or stairways have led to injuries to others. Falling unsecured equipment or construction material has led to injuries. A window (1x.3 m) with a known hinge defect fell from crane cab fell 6 m, Jun 09. Leading causes of storage rack failure: Poor design; incorrect installation and assembly; wrong handling equipment to load and pipe; operator error; and structural problems with the storage area. A significant marine presence now exists in Brazil, plus the FPSO is heading to Brazil. A significant ballast incident occurred recently, rapidly causing a 10 deg+ list. Mar 09, Nov 08: Crew change flight not meeting Shell requirements. Helicopter transport is always a noticeable component of offshore fatal accident rate. Competence includes escape and survival training for passengers. Shell Aircraft involved in aviation contractor selection and Helideck audits.
For stacked pipes Suitable piperacks 5. Marine vessel collision or sinking leading to major injury or death Competence Marine standards implemented Adverse weather policy
6. Helicopter crash
7. Loss of control while driving includes pipe transport by forklift (with and without pipe clamps) resulting in major injury or death.
Drivers Competent drivers inc no use of phones etc Fitness to drive Implementation of JMPs Suitable vehicles inc seat belts Consequence management for non-compliance Secured loads inc pipes Passengers Intervention if necessary Use of seatbelts Competence Use of locks and tags at isolation points Testing and monitoring of isolation JSA, PTW, toolbox talks Physical barriers, separation distance Signs warning of hazard
Includes loss of control by third parties. Ref EP2005. Also links to security risks. Inc defensive driving training. Fitness includes not under influence of drugs or alcohol. Passengers refusal of unsafe transport.
8. Electrocution
Risk increases at commissioning. PTW should cover the control stated and other requirements. Hydro-testing, pigging. Recent incident on FPSO during leak testing. Avoid pneumatic testing.
10. Fire or explosion due to Competence Emerging risk as we move towards first oil. ignition of hydrocarbons Effective management of change Inspection and verification of critical systems PtW system
Parque das ConChas
n
June 2010 17
concerned that the project might destroy their livelihood with pollution, or in some way drive the fish away from their traditional spawning or feeding areas. Farther offshore, environmentalists were interested to learn if operations would disturb the habits of sea mammals like whales. Every single one of these issues was addressed. Shell assisted in mariculture, helping establish oyster breeding grounds and fish farms. The company maintained a whale watch and supported a whale tagging and monitoring program so environmentalists could study and evaluate any changes in the whales behavior possibly attributable to offshore development. In a practical sense, Shell closely coordinated the movement of the myriad of vessels necessary for such a comprehensive development project to ensure that marine traffic jams did not materialize that would disturb the local fishing, recreational, and sea transport activities. Do no harm, leave no footprint The process was not limited to the sea. Shell also recognized the impact of air and land transport on the local communities. Major freeways and road networks are not found in the coastal area of Espirito Santo state, and clogging the existing roads with 18-wheelers hauling supplies to support Shell projects did not project the good neighbor image Shell was determined to create. All these activities were coordinated with sustainable development objectives in mind. Do no harm, leave no footprint. Another aspect of being a good neighbor and desirable development partner is scrupulous adherence to the law. Shell proactively implemented a strictly enforced and clearly communicated policy governing contracts, taxes, import/export duties, and local content. As many of the contracts as possible were negotiated with Brazilian companies or companies with manufacturing facilities in Brazil. Brazilian nationals
18 June 2010
n
We addressed the risks and identified the most appropriate controls from the boardroom to the worksite.
Robert Parker, HSSE manager
were hired. These policies were communicated to all would-be subcontractors and suppliers who were expected to become good neighbors too. The main contractors included Brazilian Deepwater Floating Terminals, a joint venture of SBM and MISC which own and operate the floating production storage and offloading (FPSO) vessel; Subsea 7, onshore fabricators and offshore installers of pipelines, flowlines, risers and jumpers, and installation of umbilicals manifolds and subsea distribution hardware; FMC-Brazil, fabricators of subsea trees, controls, and artificial lift modules; and Transocean, drilling and completion operations. Contracts with these providers included HSSE compliance elements, as well as tax, legal, and financial aspects. By insisting on an open operational and negotiating culture, Shell won the confidence of Brazils Federal Environmental Agency and the Brazilian Navy, two agencies that wield considerable influence in the granting of operating licenses. A total of six critical licenses were applied for, vetted, and approved with no delays to ongoing construction and operations. Robert Parker, HSSE manager, explained how the team implemented the commitment to continuous improvement: We addressed the risks and identified the most appropriate controls from the boardroom to the worksite. We supported our contractors directly,
by deploying safety coaches, and indirectly, by conducting focused reviews of safety at the workplace. But we also challenged our contractors to drive their own improvements. We created a dynamic Top-10 list of HSSE risks, and focused on the barriers that need to be in place to manage those risks. A popular newsletter was launched. It not only spread risk awareness but kept the BC-10 team apprised of progress in each facet of the project, no matter where the activity was located. Staff in Brazil could see the shape of things to come by seeing photographs of progress on the FPSO halfway around the world. In the area of health, proactive steps were taken to protect workers from local seasonal diseases such as dengu fever. Shells Diving Center of Excellence was called in early to provide greater assurance over the diving activities, where errors quickly develop into fatal accidents. Interactive health and safety meetings were held in the shipyard to change the culture of hundreds of workers so they would understand the benefits of good practices for themselves and their co-workers. Rewards were given for identification and reporting of hazards. These were just a few of the proactive steps initiated by Shell and its contractors. By relentlessly pursuing its no harm to people philosophy, the BC-10 project has made significant strides toward Shells Goal Zero target. n
The hull was taken to the Keppel Shipyard in Singapore to be inspected for upgrading and conversion to an FPSO.
(Photo courtesy of Shell)
Surface Production
June 2010 19
To achieve the required double-sided configuration, 10-ft (3-m) wide sponsons were attached to the FPSO hull on both sides over 90% of the vessels length.
(Photo courtesy of Shell)
commenced. Meanwhile, naval architects and marine engineers from Shell and SBM began the task of designing the overall conversion and establishing a reasonable expected time schedule. The work was conducted at SBMs offices in Monaco. Plans included upgrades that Shell felt were necessary, the most extensive of which was the vessels conversion to a double-sided design. Shells commitment to safety and environmental protection required that all prudent steps be taken to protect against a spill of produced fluids into the sea. The double-sided protection was achieved by designing 10-ft (3-m) wide sponsons that extend for almost the full length of the ships hull on both port and starboard sides from just below the gunwales to the empty-hull waterline. Shell project engineer Tom Muirhead provided oversight during the refurbishment
and conversion at the shipyard. He said that one of the biggest challenges was ensuring the safety of the workers. With the excellent cooperation of SBM and Keppel Shipyard, safe working conditions were established. These included adequate lighting inside the hull as well as positive ventilation in confined spaces. Many of the shipyard workers were immigrants from other countries; as a result, as many as 19 different languages were known to be spoken. With different languages and cultures, one of the critical tasks was to establish effective safety training. Safety is more than wearing hard hats and safety boots, it involves communication so each worker is aware of what others around him are
doing and being alert to spot hazards and warn co-workers. Shell, SBM, and Keppel established a program of safety classes during shift changes and breaks that were very effective. Muirhead explained, Through a series of safety meetings, workers learned the benefits of safe work practices and cooperated fully with enforced rules. To their credit, the workers responded positively and adapted quickly to the improved conditions and work practices. The effects on quality and efficiency were so tangible that the program spread quickly to other projects ongoing in the area. Improvement was noticeable. One of the most difficult habits to break was the failure to wear safety eye protection, but by projects end, we were getting excellent compliance, Muirhead said. Not counting the sponsons, the total steel replaced in restoring the hull to a like-new condition was more than 5,000 tons. The sponsons added another 5,400 tons. In all, the addition of tanks, bulkheads and foundation structures to support the proposed topsides and the turret amounted to 17,700 tons. To restore its corrosion resistance, the hull was blasted to bare metal and six coats of marine paint were applied. An impressed current cathodic protection system was installed. Internal tanks were also part
Topsides modules comprise three separation trains of two stages each a plumbers dream. (Photo courtesy of Shell)
June 2010 Parque das ConChas
20
blasted and coated to protect the steel, as were the full internal surfaces of the sponsons. The ships engines and boilers were refurbished so the vessel could sail under its own power to Brazil from Singapore. Subsequently, the ships steam boilers will be used to operate steam turbine generators to provide electrical power to operate the FPSO and all seabed modules. The boilers can be fueled by heavy oil, diesel, or field gas. Field gas is the preferred fuel with diesel as backup. To honor the Brazilian state off of which the BC-10 FPSO was to be moored, the ship was named Espirito Santo. It is owned by a joint venture between SBM and MISC and is under a long-term lease to Shell and its coventurers, Petrobras, and ONGC. TopsidesConsisting of three separation trains of two stages each, the topsides is capable of processing and metering production from all four BC10 fields. This is not as easy as it sounds. Argonauta B-West produces heavy crude oil in the 16 to 18API range. Argonauta O-North, which will be developed as part of Phase II scheduled for completion in 2013, is expected to contain similar heavy crude. However, the Ostra field contains 24 API crude while Abalone contains light gas condensate of 42API gravity. The topsides modules were built in Singapore by Dyna-Mac and BT Engineering and were installed atop the hull using heavy-lift mobile cranes.
Through a series of safety meetings, workers learned the benefits of safe work practices and cooperated fully with enforced rules.
Shell project engineer Tom Muirhead
The three separation trains are required to satisfy Brazilian allocation and metering regulations. One train serves Ostra and Abalone production which can be commingled. The other trains handle Argonauta B-West and O-North, respectively, even though the latter is not in operation at this time. The second stage separators are needed to heat and process the crude to achieve allocation quality requirements so they can be commingled later in the process. Following separation and metering in their individual trains, the produced fluids from each source are combined and treated in a single bulk oil treater. Gas released in the process is compressed and routed to the gas injection well located about 5 miles (9 km) away near the Ostra subsea complex. Ultimately, the gas will be transported via subsea pipeline to link with a Petrobras line being constructed in 2010, and then to shore. As in most field processing facilities, some of the gas is siphoned off to run heaters, turbines, and engines on board the FPSO to satisfy various requirements. A very innovative heat recovery and recycling technique was employed.
PEDESTRAL CRANE FLARE STACK PROCESS MODULES
FPSO Espirito Santo with its modules identified. (Image courtesy of SBM Offshore)
PEDESTRAL CRANE SWIVEL STACK
ACCOMMODATION HELI-DECK
TURRET
June 2010 21
Fuel Gas
Topsides M Gas/A/BW M
M
Ostra Oil
P
M
Abalone
R
M M
Ostra M
O
M
FM
Export
2nd St.
C E S S
Gas Injection
BW1
M BW/A
M
M 2nd St. M
BW2
M
ON ON1 M
M 2nd St. M FM
ON2
Heat application is critical at various stages in the process to prevent the formation of scale, or the precipitation of wax, asphaltenes and hydrates that clog tubulars. Heat also speeds up the separation process. Instead of allowing the heat from the bulk oil treater to dissipate into the atmosphere, recycled water at 250F (121C) from the treater was piped to heat exchangers where a significant percentage of the heat was captured and used to heat the second stage separators up to 230F (110C) to facilitate water separation in that stage. The water does not mix with the crude oil in the separator; it merely transfers its heat. Up to 33% of the heat energy was recovered and reused to facilitate the process and reduce costs. After the water transfers its heat, it is cleaned and treated to acceptable environmental standards for safe disposal into the sea. Another innovation that pays big dividends was the ability to re-circulate processed crude, called dead oil (meaning all dissolved gas and water have been removed). On the seabed are several very large pumps that
22 June 2010
n
boost the produced liquids from the seafloor more than a mile (1.6 km) to the FPSO. If these pumps lose their prime during startup, they can undergo considerable damage up to and including destruction. Accordingly, arrangements were made in the design to remove a small amount of dead oil from the FPSOs storage tanks and send it back to the seabed to maintain the prime on the subsea pumps. While this is an effective solution as far as the pumps are concerned, any dead oil used for this purpose must be carefully metered so it is not counted twice. A total of 20 allocation meters (M) are used throughout the process to keep track of the various liquids and gases as they travel through the maze. At the final stage are the fiscal meters (FM) that measure the crude oil and gas that is leaving the FPSO. Fuel gas is considered to be consumed in the process and is not required to pass through the fiscal meter. TurretThe internal turret is the key component linking the subsea system to the FPSO. Built by SBM, the turret is a marvel of engineering. Occupying
about 20% of the bow space of the FPSO, the turret accepts all production fluid that enters the vessel from the seabed modules. It also transmits all power, hydraulic pressure, and data between the FPSO and the subsea system using a series of highly complex umbilical conduits. Because the FPSO moves with wind and current and the seabed modules are stationary, the turret contains swivels that allow the FPSO to weathervane 360 as needed. The swivels are configured with an over-pressurization system to prevent external leakage, and a leak recovery system to contain any hydrocarbon that bypasses the swivel seals. The turret acts as the upper terminus of the steel lazy-wave risers that carry produced fluid from the seabed (or act as conduits for dead oil circulation) and the umbilicals that control the subsea modules and wellheads. A total of 21 riser and umbilical slots are contained in the turret. Some FPSOs, notably those located in hurricane- or icebergprone seas, have quick-disconnect features so the FPSO can sail away to safety in the event of an approaching hazard. Fortunately, neither hurricanes nor icebergs plague the seas off the coast of Brazil, so this feature was not deemed necessary. The turret is also the upper terminus of the nine mooring lines. Three clusters of three lines each spaced at 120 intervals run from the turret down to suction pile anchors driven deep into the seabed. Mooring lines are combinations of chain and polyester rope. Polyester rope has been proven to be an excellent mooring material. It is not subject to corrosion or rust like steel cable is and it is almost neutrally buoyant in water, thus it does not add weight to the vessel or detract from its variable deck load capacity. The turret is equipped with numerous sets of wheels, called bogies, that run on tracks surrounding the turret and allow 360 movement of the FPSO as it
weathervanes due to the effects of wind and/or sea currents. The multibogie design prevents axial and radial movement of the turret while evenly distributing the weight of the risers and mooring lines to the hull of the FPSO so there are no high-stress points no matter which direction the ships keel happens to be pointing at the time. Offloading of crude is carried out by traditional shuttle tankers that connect to the FPSO using flexible transfer hoses over the stern of the vessel. The FPSO mooring is sufficiently robust to moor the shuttle tankers during crude transfer. Because of occasional episodes of slug flow, it is possible for a high pressure surge to hit the turret. To protect against a possible dangerous overpressure condition, the turret manifold is equipped with a high-integrity pressure protection system (HIPPS) that senses if
The turret is the cornerstone of the FPSO. It is the point through which all production, communication and mooring between the subsea system and the FPSO must pass. The swivel stack tower atop the turret allows production, recirculation, hydraulics, power and communications lines to maintain 100% integrity while the vessel swivels with the wind and sea current.
(Image courtesy of SBM Offshore)
June 2010 23
crew, and there are strategically placed life rafts around the ship also capable of accommodating the entire crew. Safety stations equipped with breathing apparatus, first-aid kits, and defibrillators are also strategically located. A buddy system ensures that no crew member enters a hazard area without a partner to help or observe the activity. A helipad overhangs the ships stern. Although gas flaring is not anticipated, there is a flare stack amidships to be used in an emergency. Mooring While the FPSO was being readied for its role in receiving and processing BC10 production, a geoscience team from Shell, SBM, and Fugro Geoconsulting was carefully studying the BC10 seabed data for the optimum places to embed the anchors that would moor the FPSO in place. Anchor design has evolved greatly since the traditional anchor-shape seen on the uniforms of naval personnel. In fact, the anchors used to moor floating drilling and production vessels do not resemble those traditional anchors in the slightest. The team used data from a combination of piezocone penetrometer tests, jumbo piston cores, gravity cores, and side-scan sonar to analyze the seabed. They discovered that the entire area was quite complex, the result of massive sloughing off the continental shelf. Unlike oil and gas prospectors, they were looking for very low permeability, uniform sedimentary sections; ones that would accept the anchors and maintain the suction. Instead, they encountered mixed geology containing several large rock masses floating in a sea of failed sediment. The plan was to try to identify and locate these masses so they could be avoided. It would be like trying to drive a tent peg and encountering a boulder just beneath the surface. Because of the turbiditic nature of the area, development of a predictive soil model was undertaken by the team for the optimization of the mooring
The massive turret with its swivel stack tower on top dominates the bow section of the FPSO, and provides full, 360-degree weathervaning for the vessel. (Photo courtey of Shell)
cabins, although normal crew strength is 75 persons. A large galley and mess area is provided as well as TV lounges and a gymnasium. A hospital and treatment room has been included for crew safety and health. Safety first The central control room controls all onboard and subsea operations including offloading of production. Video camera monitoring gives control room personnel a view of all critical areas of the vessel and topsides. The blast bulkhead that separates the crew area from the rest of the ship has been raised to an A60 rating, and a safety zone has been established to the aft-most topsides modules on deck. Sufficient life boats exist to accommodate the entire
turret pressure rises above safe limits (300 psi) and automatically opens valves that blow down the riser pressure to prevent high-pressure fluid from entering the turret swivels that are not rated to withstand high pressures. Accommodations aboard the Espirito Santo are designed ergonomically so crew members can get the rest, recreation, and nourishment they need to operate safely and at peak efficiency. A maximum of 100 persons can be accommodated in one- or two-bed
24 June 2010
n
A geoscience team from Shell, SBM, and Fugro Geoconsulting carefully studied the BC-10 seabed data for the optimum places to embed the anchors that would moor the FPSO in place.
anchor locations. The model was based on the integration of the geophysical survey and the geotechnical data in an area characterized by complex and discontinuous sand strata interbedded with clays. The procedure they employed was quite robust and the nine anchor locations that were chosen performed as expected during the installation of the anchors. Modern anchors intended for permanent mooring of vessels are called suction piles and look like long cylinders open at the bottom and closed at the top. On the top there is an opening where a suction hose can be attached. A length of anchor chain is attached about 20 ft (6 m) from the bottom end. During deployment, the anchor A topsides module is lifted by a floating crane ready to be placed on the FPSOs top deck.
(Photo courtesy of Shell)
June 2010 25
W
Offset (m): 100 200 300 400 500 600
The seabed near proposed mooring sites was characterized by permeable sand streaks and mass transport deposits, making site selection critical.
(Image courtesy of Shell)
TWO-WAY TRA VEL TIME BELOW SEA SURF ACE (s)
2.3550
~3.8 m
2.3600
PARALLEL-LA
YERED UNIT
2.3650
2.3700
(CHIEFL Y CLA YS WITH DISCONTINUOUS SANDS)
INTERBEDDED UNIT
2.3750
2.3850
2.3900
Notes: 1. All materials are inferred. 2. All depths and thicknesses are approximate and assume a speed of sound in sediments of 1,525 m/sec. 3. Amplitudes above a relative value of 10,000 are displayed in y e l l o w to highlight the inferred presence of sands. The high-amplitude seafloor also appears yellow .
(Mass T ransport Deposits; chiefly remolded clays with some thin, discontinuous sands and erratic shear strength profiles)
MTD UNIT
cylinder is suspended vertically on a cable and lowered to the seafloor by a special anchor handling vessel (AHV), with the open end down. The cable is slacked off, allowing the anchor to penetrate the seabed of its own weight. Once it stops, a remotely operated vehicle from the AHV attaches to the suction hose and starts to pump out the water from inside the anchor, creating a vacuum condition inside that literally sucks the anchor deep into the seabed. Depth varies depending on the strength of the seabed; on the BC-10 project, the tips of the anchors reached between 52 and 57 ft (16 and 17.5 m) below the mudline. The anchors planned for the BC-10 installation were 16.5 ft-indiameter (5.0-m) steel cylinders with a wall thickness slightly greater than 1 in., so they were quite massive. Anchors were set a good eight months in advance of the arrival of the FPSO and allowed to stabilize. Two weeks before the FPSOs arrival, polyester mooring lines were attached to the anchor chains. The top end of the polyester line was buoyed off, waiting
26 June 2010
n
the arrival of the FPSO. Ultimately, another length of anchor chain was linked to the top end of the polyester lines. This upper chain was used to lock the mooring lines to the turret. When the FPSO arrived, the AHV assisted in capturing the upper ends of the mooring chains and attaching them to their respective mooring sockets on the bottom of the turret. The Espirito Santo arrived in Brazil on Dec. 15, 2008, a short 25 months after project sanction. It sailed under its own power from Singapore, a journey of some 9,000 nautical miles, and was finally moored on station in January 2009. Pull-in and connection of the risers and umbilicals from the subsea modules commenced immediately. Through the excellent cooperation of Keppel Shipyard, SBM, and Shell, the project recorded 8.5 million consecutive man-hours without a lost-time incident. A total of 50 major lifts amounting to more than 22,000 tons were conducted to complete the conversion. n
The huge turret module palls in comparison to the gigantic crane, lifting its load for insertion into the forward section of the FPSO hull.
(Photo courtesy of Shell)
Field pipeline, flowline, and riser schematic includes proposed layout for Argonauta O-North to be completed during Phase 2.
(Image courtesy of Shell)
Subsea Production
June 2010 29
(150 km) of pipe was installed in Phase I to connect the subsea modules and the floating production storage and offloading (FPSO) vessel. On the seabed, flowlines connect the various modules. The most extensive network to date is on Ostra, where two production manifolds are capable of accommodating four wells each. Initially, Ostra was developed using two clusters of three wells each. Each cluster was served by a production manifold (PM). Recently, it was decided to drill an additional (seventh) well on Ostra, so having the extra PM capacity has proven to be fortuitous. The seventh well, which has just been completed, is associated with wells 1, 2, and 3, and is tied in to their PM. The Ostra PMs are a little more than a mile (1.6 km) apart, and are linked by two insulated flowlines. Besides transporting produced oil between the PMs, they permit hot-oil circulation during startup to free up the viscous crude and get it moving. The PMs are connected by jumper lines to the huge ALMs that will separate the crude oil and water from the gas and sediment before boosting it up to the FPSO. Argonauta B-West is a smaller version of Ostra, having only a single ALM and no PM to handle production from its two wells. Lines from the subsea wellheads go directly to the ALM at BWest. With only a single well, Abalone connects directly to the Ostra ALM via two 9.5-mile (15.2-km) flowlines. Dual lines are used to permit hot oil circulation. On all deepwater subsea field developments, flow assurance is a major
concern. Scale, wax, hydrate, and asphaltene deposits can clog lines over time, curtailing production or cutting it off altogether. Installing a flowline network that allows circulation is a practical step to keep the wells flowing. Maintaining the flow lines temperature and pressure is the best protection against flow assurance hazards. Injection of chemical inhibitors to the flowstream is also an effective technique against many of these problems. Risers The most challenging part of the piping part of the project was the design, construction, and installation of the risers. Three riser options were studied in preparation for the BC-10 project: steel catenary risers (SCR), steel lazy-wave risers (SLWR), and flexible risers. While flexible risers were preferred, largely due to considerable experience with this type offshore Brazil, there was no way the flexible pipe manufacturers could meet the delivery requirements, so they were ruled out. SCRs descend in a natural catenary arc from the floating production facility to the seabed. As the vessel heaves in the sea swells, the landing point of the catenary becomes an area of some fatigue and
abrasion, and this was deemed undesirable. The SLWR includes buoyancy elements installed near the bottom that compensate for vessel motion and reduces riser wear at the touchdown point on the seabed. In addition to fatigue at the touchdown point, the designers had to worry about vortex-induced vibration (VIV). This phenomenon can be likened to the humming one hears as wind crosses high-tension lines or suspension bridge cables. Meandering subsea currents can set up sympathetic vibrations in long risers that can actually destroy them over time. The traditional way to mediate VIV is to attach fin-like strakes to the riser that break up the vortices as the currents pass, thus dampening the vibrations. Lastly, the designers had to consider interference between adjacent risers and umbilical clusters as they approached the tight confines immediately beneath the turret. They had to include cathodic protection systems to forestall rusting or electrochemical corrosion. Another critical point in riser design is the upper terminus, where the riser attaches to
SLWR profile illustrates how buoyancy elements mitigate riser motion caused by wave action at the surface.
(Image courtesy of Shell)
30
June 2010
the FPSO. At this point all tension is transferred to the turret, but riser flexure and lateral movement must be controlled as well. Long guides called I-tubes help workers pull the risers into position. First a heavy steel cable is threaded down from the pull-in winch on top of the turret through the I-tube. This cable will connect to the shackle at the riser top to reel them in. The risers were assembled into stalks of predetermined lengths by Subsea 7 at its Ubu base on the Brazilian coast. The joints were specially welded using a pulsed TIG process that produces ductile welds, and thoroughly inspected using 360-degree ultrasonic testing apparatus. Once the welds were certified, the pipe was coated with various types of insulation and/or corrosion protection material. The complete riser fabrication process comprised 11,000 welds and consumed 15 months. When it was time to install the riser, enough stalks to make up a complete riser assembly were spooled onto a reel aboard the Seven Oceans installation vessel. The stalks were welded end to end, inspected, and the welded areas coated as they were reeled onto the ship; so at the conclusion of the process, a complete single riser assembly was spooled onto the reel ready for deployment at sea. After sailing to BC-10, the Seven Oceans vessel began the installation process. First, the subsea (bottom) end of the riser was connected to its PLET module onboard the vessel. The riser was spooled into the sea and the PLET was positioned adjacent to its ALM on the seabed; then the remaining riser was carefully spooled off and laid on the seabed ready for attachment to the FPSO. Great coordination was required so the risers would be laid in reverse order to their pull-in schedule so they would not become tangled. Although a complete pre-lay was planned, only half the risers were actually pre-laid; the remainder were attached to their PLETs and pulled in to the FPSO in a series of continuous operations.
Assembled riser being reeled onto the Seven Oceans installation vessel.
(Photo courtesy of Shell)
A PLET is attached to the lower end of the riser and is lowered into position adjacent to its appropriate subsea module.
(Photo courtesy of Shell)
A pull-in shackle had already been attached to the top end of the riser along with a riser clamp and flex joint that had also been attached a precise distance from the riser top. While the steel pull-in cable was being deployed through the I-tubes, the Seven Oceans snared the riser shackle from the pre-laid
riser lying on the seabed and pulled it upward, suspending the riser just beneath the FPSO. An ROV from the Seven Oceans made the final connection of the pull-in cable to the riser shackle and the Seven Oceans released the riser top. Next the pull-in winch aboard the FPSO goes to work, pulling the riser up slowly through the I-tube until it can be hung off in the hangoff collar that supports the axial load. The riser clamp is actuated by divers, clamping the riser tightly to the I-tube, thus preventing lateral movement as the ship pitches and yaws in the ocean swells. Any remaining motion is absorbed by the flex joint. The final step is to remove the pull-in shackle from the top of the riser and plumb-in the riser to the swivel manifold in the upper part of the turret. The pull-in winch rides on a track on top of the turret so it can be positioned directly over each I-tube to pull in the risers and umbilicals one at a time.
Parque das ConChas
n
June 2010 31
The complexity and precision of the riser installation sequence is hard to describe. The intense dedication and cooperation of the Subsea 7, SBM, and Shell personnel resulted in a near flawless installation. The meticulously orchestrated sequence was repeated over and over until all risers and umbilicals had been safely pulled in to their I-tubes and hung off. A final step remained for the Subsea 7 crews to install the short steel jumpers connecting the PLETs to the ALMs. These were installed at the rate of one per day until all 25 were successfully landed in place. The entire pipeline/flowline/riser operation consumed nine months, most of which was accomplished before the Espirito Santo arrived on station. One of the last risers to be hooked up linked the FPSO to the 5.5-mile (9-km) gas injection line that terminated at the gas injection well near the Ostra complex. The well had been previously drilled into a deep aquifer downdip of Ostra that would serve as temporary storage of the gas until the Petrobras pipeline has been completed. In anticipation of that event, a 6-in. line 25 miles (40 km) long had been laid from the FPSO to the approximate junction point. The two lines are expected to be linked in late 2010, whereupon produced gas not used in operating the BC-10 production facility will be exported for sale. Umbilicals Umbilicals are analogous to the human spinal cord, transporting virtually all power, command, and control functions to the subsea modules. Through their complexity they simplify the installation and operation of the myriad connections required between the FPSO and the various subsea operations. Most umbilicals are unique because they are designed to supply specific functions based on the requirements of each field. However, they have certain degrees of commonality. At BC-10, the
32 June 2010
n
Like giant sea creatures, the pull-in cable from the FPSO and the pull-in shackle at the riser top are linked with the help of a miniscule ROV under the watchful eye of a subsea video camera.
(Photo courtesy of Shell)
by Oceaneering in its Panama City, Fla., plant, the BC-10 umbilicals are built with an inner core containing electrical power and command conduits, surrounded by an outer sheath of hydraulic lines. Shells Sean Eckerty, umbilicals team leader, explained, The high voltage cables were manufactured in Cali, Colombia, and the superduplex tubes were manufactured in the Czech Republic. It is a credit to the intense collaboration and coordination of the members of the umbilical team that all these disparate components were delivered on time and on spec to the final cabling facility in Florida where the umbilicals were assembled. Bundling all these lines simplifies the layout of the distribution and control elements subsea. Riser is firmly secured in the I-tube with axial load transferred to the turret at the hangoff collar and radial movement constrained by the riser clamp. Bending motion is absorbed by the flex joint.
(Photo courtesy of Shell)
umbilicals serve four main roles: conduct high voltage power to operate the subsea booster pumps, transport hydraulic power to operate subsea valves, supply chemicals required for the prevention of corrosion and solids formation, and serve as two-way conduits for hundreds of command and control conductors, including highbandwidth fiber-optic cables. Designed jointly by Shell and Oceaneering International and manufactured
The completed umbilicals are an extremely robust package, strong and resilient, that can withstand the dynamic loading applied to them while suspended in 6,000 ft (1,829 m) of water, swaying in the subsea currents for 30 years. The main core contains three trefoil high-voltage power cables: two live ones and a spare. There are also three communications quads and two fiber-optic cables. The white elements are polyethylene fillers intended to provide mechanical support and keep adjacent lines from shifting relative to each other. The outer sheath contains a communications quad and 15 hydraulic tubes (six large diameter tubes and nine small ones) along with additional filler elements. The steel hydraulic tubes actually support the tensile load of the umbilical,
A typical steel jumper is suspended over the side prior to lowering to link the PLETs to their appropriate subsea modules.
(Photo courtesy of Shell)
a key to the BC-10 design, as the copper conductors of the inner bundle cannot support their own weight when suspended in the water depths encountered at BC-10. The yellow sheaths are made of a rugged thermoplastic material that is extruded over the bundles in the manufacturing process. In operation, the umbilicals are designed to be flooded with seawater, and all cables are designed to operate in a wetted environment. In addition, each communications and control quad was extensively shielded against inductive interference from the high-voltage trefoils. Manufacturing of 6-mile-long (10.5km) umbilicals such as those used at BC-10 is a complex operation, and only a few companies in the world are capable of performing the work to the scale and quality required for deepwater offshore applications. The umbilicals are made in a long rotating cabling machine containing large reels or
The umbilicals are stabbed and locked in to the turret using an interface that transfers both tension and bending moment to the turret structure. (Image courtesy of SBM Offshore)
bobbins that hold the individual cables that will make up the finished umbilical. Because the bobbins can only hold a finite length of cable, and because it would only be an incredible coincidence if that length coincided with the final length of umbilical, splices are required from time to time during the manufacturing process. In the BC-10 case, three splices were required for each power cable. The splices must be perfect. They cannot
cause a change in the outside diameter of the cable, and they must have total electrical or hydraulic integrity when completed. To control the splicing environment, splicing tents were set up on the manufacturing floor adjacent to the cabling machine. Eckerty explained the procedure, To complete each electrical splice, the trefoils were unwound and the cable ends prepped prior to the conductors of the spent bobbin being brazed to those of the new spool. The insulation and screening material were reinstated with extreme care. Finally, each splice was subjected to rigorous testing to ensure it passed electrical, hydraulic, and mechanical specifications before the cabling machine was re-started.
Parque das ConChas
n
June 2010 33
The cabling machine wraps the cables in a tight helical pattern before the application of a thermoplastic outer sheath. Like the risers, umbilicals were preinstalled to their respective subsea modules as they were submerged in November 2008, the free (upper) ends terminated at a pulling shackle and were laid out on the seafloor ready for tieback to the FPSO. Umbilicals have their own I-tubes to guide them into place in the turret. However, the umbilicals terminate much higher in the turret than the risers, so they exist in a permanently dry area of the turret. Once they are hung off, the conductors, power cables, and hydraulic lines are routed to their respective swivels in the swivel stack at the top of the turret. Umbilicals are hung in a lazy-wave configuration like the risers to allow for the rise and fall of the FPSO in the sea. Subsea hardware The BC-10 complex looks like a small town of bright yellow modules arrayed across the subsea landscape. First there are the wellheads, each equipped with safety shut-in valves and vertical access for well intervention services that may be required later in the life of the field. Flowlines connect the wellheads to subsea PM where produced fluid is measured and gathered for transmission to the ALM. Because produced fluid can contain various mixtures of liquids (oil and saltwater), gas, and gas condensate, multiphase flowmeters are required to monitor and measure each wells production. Pressure and temperature are also measured precisely. The flowmeters were supplied by Schlumberger and use the Vx technique pioneered by Framo Engineering of
Norway. This allows them to measure accurately a very wide range of flow composition and flow regimes from steady-state fluid flow to severe gas slugging. Flowmeter data are continuously telemetered back to the FPSO control room via one of the umbilical communication lines.
The BC-10 field layout consists of subsea wellheads, pipeline end terminations, production manifolds, and artificial lift manifolds along with all connecting flowlines and risers.
(Photo courtesy of Shell)
The 240-ton ALM starts its journey from the FMC fabrication yard. This is the top, or seabed section, that will sit precisely atop the embedded caissons.
(Photo courtesy of Shell)
34
June 2010
Subsea treesSubsea trees were provided by FMC, and were installed using an anchor handling vessel with an A-frame on the stern. A heave compensated lowering system ensured that the equipment would not crash-land on the wellhead if an ill-timed ocean swell came by. The first step was to install a tubing head spool (THD) to the wellhead flange. This could be accomplished either prior to drilling the wells lateral section or after installing the gravel pack completion. Next, an enhanced vertical deepwater tree (EVDT) was installed on top of the THD after installing the upper completion package. The flowline jumper attaches to the THD so if the tree must be removed for any reason, the flowline jumper is undisturbed. The EVDT offers through-bore access for wireline or coiled tubing so the well can be worked over with the tree in place. A workover riser can also be connected to the top of the tree, if necessary. For a major intervention or tree replacement, a subsurface safety valve is first deployed into the tubing hanger; then the tree can be safely removed. Production manifoldsProvided by Subsea 7, production manifolds gather produced fluid from several wells and route it to the ALM, where it is separated and boosted to the surface. Weighing in at 100 tons each, the PMs were deployed from Subsea 7s Seven Seas work vessel, which is equipped with a 400-ton capacity crane. The PMs are sited on the seafloor where they can be jumpered to the subsea wellheads, and then, also by jumper, to the ALM. Jumpers are versatile adjustable-length steel conduits that can reach across short distances to connect subsea modules. Artificial lift manifolds (ALM)Likely some of the most innovative subsea modules ever conceived, the ALMs host the booster pumps that move production up to the FPSO. The massive ALMs built for BC-10 weighed in at 140 tons and 235 tons for the Argonauta B-West
It is a credit to the intense collaboration and coordination of the members of the umbilical team that all these disparate components were delivered on time and on spec
Sean Eckerty, umbilicals team leader, Shell
h g=
Pfriction
MOTOR
Caisson cross-section from Argonauta B-West showing gas re-blending ports just below the ESP.
(Photo courtesy of Shell)
June 2010 35
and Ostra Fields, respectively. But like an iceberg, the visible portion of the ALM concealed the massive separation caissons that lay beneath the seabed. Control systemsThe entire BC-10 complex is instrumented, on the seabed, downhole in the wells, and on the FPSO. All data are transmitted in real time to the control room aboard the Espirito Santo. There, experienced professionals monitor production operations 24/7. They are assisted by automatic alarms that signal any operating condition that is out of established norms. All wells and processing modules are equipped with two-level emergency shut-down devices. Two level means that first the operators receive a warning of an impending problem condition. They can implement a procedure to mitigate the problem or they can manually initiate emergency shutdown. As an added safety factor, if action is not taken within a specified period (either time- or condition-based), an automatic shutdown is initiated. Artificial lift The artificial lift system employed at
BC-10 is believed to be unique. It has been implemented because reservoir pressure is insufficient to lift the produced fluids naturally to surface. Even if a subsea well may flow naturally, artificial lift may be implemented because it is predicted that the well will ultimately require it, and for subsea wells it is more cost-effective to implement certain artificial lift techniques when the well is constructed, rather than later in its life. CaissonsDriven deep into the seabed, the caissons are each more than 300 ft (100 m) long. Each contains a 1,500-hp electrical submersible booster pump to lift the produced fluid up through the risers to the FPSO. By encasing the pumps in such a long tube, it was predicted that they would not pump off, meaning that the gas liquid contact would never fall below the pump intake, causing them to lose prime. The Ostra caissons played a dual role. They had a gas/liquid centrifugal cyclonic (GLCC) separator in the top that separated out a large percentage of the gas and routed to a gas riser where it flowed naturally up to the FPSO.
The complexity of the chemical solution can be seen in this overview. Potential challenges are listed across the top row, and each part of the BC-10 production system is described in the left column. Color codes denote the relative risk.
(Photo courtesy of Shell)
36
June 2010
The key to operating an integrated production system effectively is monitoring and surveillance.
The GLCC concept was critical to the success of the project. Accordingly, a fullscale pilot was constructed on land and full simulation tests were run to qualify every detail of the caissons. For example, even the angle of the inlet pipe was optimized to complement the initial gas separation process. By removing the gas subsea, it was believed that the formation of hydrates would be minimized. Also, gas slugging in the liquid riser would be curtailed. After gas was separated, the oil and water gravitated to the bottom of the caisson where the pump could boost the liquids to surface in a liquid riser. Any fine sand that managed to get past the gravel pack went to the bottom of the caisson where it was sucked into the pump intake and transported to the surface. On most land or surface-processing operations offshore, a 300-ft long (91.4-m) vertical separator is impractical, but at BC-10 there was room to spare, and the long, slender caissons were driven into the seabed with only their tops sticking out to mate with the ALM module. The combination of cyclonic force and gravity separated the gas in the top portion of the caisson, leaving the oil/water mixture to gravitate to the bottom where it entered the pump intake. The Ostra/Abalone complex ALM has four caisson separators. The light Abalone crude is commingled with the medium weight Ostra crude and the gas is separated and transported to surface using a dedicated gas riser. The remaining crude oil/water mixture is boosted to surface. On the Argonauta B-West ALM, the multiphase produced fluids are separated at the caisson; then they are reblended before being pumped to surface. The reason this is necessary is due to the high viscosity of the oil phase. By reblending the oil, gas, and water, viscosity control can be maintained for the 5.5-mile (9-km) trip through the Argonauta B-West flowlines to the riser connection on the seabed. Reblending was enabled by a row of ports at the pump intake that allowed a set volume of gas to enter the pump enough to control viscosity, but not enough to cause the pump to stall. By maintaining a constant volume of gas in the blend, the mixture viscosity can be held steady, facilitating flow and preventing gas slugging. Each caisson contains a junk basket near the bottom to prevent large debris from being sucked into the pump. The caisson bottom is also profiled to help sweep fine-grained sand into the pump for transport to surface where it can be screened out. This prevents sand accumulation in the bottom of the caisson. MoBosNamed using a contraction of the Portugese words for modular pumps, the MoBos are 1,500-hp electrical submersible pumps (ESP) located in the lower ends of the caissons. The ESPs were provided by Baker Hughes. Because changing out a subsea pump is non-trivial, great care was taken to ensure that pump operation was optimized. Any condition that is known to shorten pump life was eliminated in the design. For example, the pumps were shrouded to force fluid to pass at high velocity to create a heat-transfer cell that kept the pumps from overheating. The design is such that pumps can be pulled and replaced, if necessary, using a light rigless workover vessel assisted by an ROV, but every means was taken to minimize the frequency of intervention.
Pumps are instrumented so they can be monitored to ensure that both pump and well performance can be maintained at optimum levels. They are powered using variable frequency drives, so pump speed can be adjusted simply by raising or lowering the frequency of the electrical current. Production monitoring and control The key to operating an integrated production system effectively is monitoring and surveillance. Almost all problems can be managed successfully if they are detected early enough. At the BC10 complex, Shell has implemented a network of temperature and pressure gauges and flowmeters that monitor production all the way from downhole in the wells to the export lines on the FPSO. The purpose of most of this instrumentation is to detect the early signs of corrosion or blockage caused by the buildup of scale, wax, or hydrates. It is also intended to monitor the flow regime to detect anomalies such as slug flow, liquid carryover into the gas line, or gas carryover into the liquid lines. In the wells themselves, monitors can detect the early signs of gas coning or water encroachment from the reservoir. Changes in the gas or water phase fractions are detected by subsea multiphase flowmeters. Much of production control falls under the general heading of flow assurance. At BC-10, flow assurance received an unusual amount of attention. A full-scale simulator was built onshore to test the GLCC concept separator performance and process control. The full spectrum of gas and liquid carryover in the risers and flowlines was simulated and studied so that operating strategies could be refined, and monitoring systems designed to ensure the systems were operating within design norms. As previously described, the umbilicals contained steel conduits designed to transport flow assurance chemicals from the FPSO to the wells and flowlines.
Parque das ConChas
n
June 2010 37
But it was impractical to supply separate lines for each possible chemical treatment. Accordingly, the Nalco Co. was contracted to study the situation and develop chemical cocktails that could accomplish multiple tasks and be transported to the subsea field in a single line. This task is not as easy as it sounds. Production is often complicated by multiphase flow, diverse fluid compositions, and high fluid velocities. Nalcos challenge was to address three main issues: corrosion and scale inhibition, foaming, and viscosity reduction. But it had to thoroughly test the chemical-chemical compatibility as well as the compatibility of the chemicals with the myriad materials with which they might come in contact in the production system. The compatibility tests had to take into account the extreme ranges of temperatures and pressures encountered in the production and processing flowstreams to ensure that the chemicals could maintain their potency under a wide variety of environmental conditions, including the high shear and temperatures of the ESPs. The results were impressive. At BC-10, the first qualified combination of corrosion and scale inhibiting chemistry was inaugurateda high shear corrosion inhibitor/methanol mix. In addition, the first chemical antifoam compound qualified for deepwater production that utilized subsea separation and boosting was successfully implementeda fluorosilicone product. Each production stream required a slightly different treatment; in the end, a comprehensive chemical strategy was implemented that was both effective and economical. In addition to chemical flow assurance treatment, control of flowline and riser temperatures was critical to prevent the formation of hydrates and wax buildups. Mostly, this was accomplished by insulating the lines with low thermal-conductivity coatings. As previously discussed, the subsea separation of gas was a key factor in hydrate
38 June 2010
n
The compatibility tests had to take into account the extreme ranges of temperatures and pressures encountered in the production and processing flowstreams to ensure that the chemicals could maintain their potency under a wide variety of environmental conditions.
suppression. The time factor had to be considered as well. Some production had to travel several kilometers to reach the ALMs and risers and the insulation heat transfer coefficient had to be sufficient to maintain liquid temperature above precipitation thresholds. The alternative was a very costly concentric pipe-in-pipe technique, or the employment of electric line-heating elements. In the gas line, the combination of continuous injection of methanol and high flow velocity keeps the line free. A fine balance was maintained regarding liquid carryover (LCO) in the gas line and gas carryover (GCO) in the oil line. As mentioned, a certain level of gas in the oil was beneficial as a deviscosifier. The gas presence also lightened the load on the ESPs. A minimal amount of LCO is tolerable in the gas line as long as it does not cause slug flow. The cure for LCO was maintaining a high enough gas velocity to sweep the liquid from the line. The recirculation of dead oil provided insurance against the ESPs losing their prime, but also brought a measure of stability to the produced fluid flow. Inside the caissons, pressure gauges monitored the gas/liquid level and automatically adjusted the pump speed to maintain the level within the optimum range. n
because the rock provides little mechanical integrity for the rotary steerable systems (rss). Finally, after experimenting with directional mud motors and different types of rss, the drilling group settled on the PowerDrive Xceed rss from schlumberger, a system specially designed for tough drilling environments.
Transocean Arctic I is a third-generation semisubmersible drilling rig normally rated for 3,100 ft (945 m) of water. With pre-set mooring and a dry BOP stack it is capable of drilling in at least 7 ,400 ft (2,250 m) of water. (All images courtesy of Shell)
June 2010 39
The first six Ostra development wells were batch-drilled in two clusters of three 3-D wells each.
P8H P5H P1P P2H P3H PM1
PM2
P4-Pilot
1200 900 600 300 0 -300 -600 -900 -1200 -1500 -1800
21
P4H
-1200
-180
-150
-900
-600
-300
300
-2100
600
Seeing where youre going, learning where youve been To help mitigate the challenges of the development drilling program, a comprehensive formation evaluation program added eyes to the drill bit. The combination of logging-while-drilling (LWD) conventional coring, and wireline logging complemented the batch drilling technique used in constructing the development wells. Logs and cores from the exploration and appraisal wells were thoroughly analyzed and integrated into the 3-D reservoir model that was evolving from the seismic data. Each additional piece of information helped the development drillers and subsurface staff, but even with a data-rich model, the stakes were too high to risk drilling blind. Accordingly, bottomhole assemblies included LWD tools that provided real-time vision of the formations being penetrated by the bit. The development of logging programs is not an exact science. Log data are gathered to answer geologists questions or to validate their theories about the subsurface. Some questions are known in advance, others come up in the course of developing the reservoir. If the information is to be used in steering the wells trajectory to intersect the highest-quality reservoir volumes or avoid drilling hazards, it must be acquired in real time. If it is required to characterize the reservoir, it can be acquired subsequent to drilling using wireline-conveyed logging tools. Some data can be acquired through casing, so its acquisition can be delayed until the completion phase. Most, however, must be acquired in open hole. Often, the well trajectory influences the decision. Wireline tools depend on gravity to take them to bottom. In highly deviated well bores or horizontal sections, they must be assisted to bottom by conveying them on drillpipe or pulling them with a downhole tractor. Both are time-consuming and costly techniques. There is
18 00
-210
The drilling objective was clear. Shells BC-10 project manager, Kent Stingl, elaborated, Wells had to be constructed that would produce at high rates. They had to be completed in such a way as to minimize the need for interventions. And they had to contact enough reservoir rock to ensure production longevity of at least 20 years. Success in achieving these goals would translate into a positive economic scenario that could produce the desired profitability to justify the investment. It was the consensus that the only way to reach these objectives was to drill a few perfectly positioned lateral well bores extending about 5,000 ft (1,524 m) or more. The actual lateral length depended on the formation being penetrated and the profile of the structure where the well was drilled. In fact, each of the initial six wells exceeded the 5,000-ft minimum with one extending to almost 7 ,700 ft (2,350 m). Collectively, the first six Shell BC-10 wells were record-setters for extendedreach wells drilled in more than 3,281 ft (1,000 m) of water.
40 June 2010
n
Numerous challenges addressed The difficulty of drilling high-quality lateral boreholes under the prevalent conditions cannot be overstated. Penetrating the highest-quality reservoir rocks required precise geosteering technology. The first target to be drilled was the Ostra reservoir. A total of six wells were drilled, three at a time. A batch technique was used for maximum efficiency. That is, the rig drilled three top holes, then three intermediate holes, and finally, the lateral sections. Each well bore was a 3-D design with the first cluster of three wells drilled from one location and the second cluster of three drilled from another location about 6,900 ft (2,100 m) to the southwest of the first cluster. The seabed penetrations corresponded to the planned location of the two production manifolds. Not only was the batch drilling technique inherently efficient, it also allowed maximum flexibility for the drilling group as it was able to apply learnings from the well to immediately improve drilling performance and hole quality on the subsequent wells in each cluster.
no set formula for deciding how and when to acquire log data; each well is different, and there is risk involved. Shell petrophysicist Lee Stockwell explained, In the top and intermediate hole sections, we typically ran a limited LWD string consisting of a Triple Combo log (resistivity, density, and neutron) to acquire basic data. Wireline was kept in reserve for backup in case of a problem, causing gaps in the data. In addition, we used specialty wireline tools to investigate questions or opportunities seen in the LWD data. These included Modular Formation Dynamics Tester (MDT), Nuclear Magnetic Resonance (NMR), and Check-shot borehole seismic logs. We took conventional cores while drilling and augmented them by shooting sidewall samples to fill in gaps. No clues are overlooked, said Stockwell. Weve been building our reser-
Weve been building our reservoir database for eight years. If we dont need the information immediately, it will be useful later during the completion and production phases.
Shell petrophysicist Lee Stockwell
voir database for eight years. If we dont need the information immediately, it will be useful later during the completion and production phases. Our welllogging programs are designed to reduce uncertainties. For example, at
Real-time geosteering software was used to monitor drilling progress and manage directional changes. It is worth noting that the logs revealed seven major faults where prior seismic interpretation had suggested only two.
Geo-Steering RTGS
Plan
Actual
Exit shale at XX77m MD. ROP slight increase. At XX70m DD reached 90 (XX61.5m TVDSS).
Sand @ XX80m MD
XX31 - XX76m MD Kept inclination at 86 to minimize shale. Build inclination to 90 due to TVD limit imposed due to OWC.
June 2010 41
Abalone, our assumption based on early data was that the field was similar to some we have seen in the Gulf of Mexico with a gas/oil ratio (GOR) of 1,200 and crude oil gravity in the 30API range. However, our logs showed us that the actual GOR was 3,500 and the liquid was not crude oil, but consisted of high gravity condensate with a density of 42API. This information prompted the decision to drill a gas injection well to dispose of the gas temporarily until a gas pipeline could be laid to shore. The exploration seismic data provided macro-scale information, such as the reservoir top and base. However, the base data was inconclusive in places, Stockwell said. This led to extensive changes in our evaluation programs, particularly in the horizontal production sections. We beefed up our LWD program using Schlumbergers Scope family of services. This included the EcoScope
multifunction formation evaluation tool, the PeriScope real-time well placement and boundary mapping service, and the TeleScope power, telemetry, and combinability service. Other LWD services were added as needed, including the proVISION NMR tool. The EcoScope tool provided a baseline Sigma measurement that will be extremely valuable as a benchmark for production logging programs performed later in the life of the reservoir. Drilling unconsolidated sediments is particularly challenging because abrupt directional changes are difficult to make, Stockwell explained. We used Schlumbergers Xceed RSS tool, which uses the point-the-bit principle and steered it using information from the PeriScope deep-reading propagation resistivity device. This tool is able to see 15 to 18 ft (4.5 to 5.5 m) radially to give the driller early warning of formation changes or drilling hazards.
Drilling and steering efficiency can be evaluated by superimposing actual directional drilling parameters onto the seismic section. By understanding what works and what does not work, drilling parameters can be optimized for subsequent wells.
Zone 1 : 2469 m to 2600 m MD - Mid-Mio-Marl to Top Olig - Steering Ratio: 40%-60% - Average DLS: 3.7 - ROP: 45 m/hr
Zone 2 (Hard Steering): 2600m to 2920m MD - Top Oligocene to Top Eocene - Steering Ratio: 80%-100% - Average DLS: 2.8 - ROP: 25 m/hr
Mid Eocene to Top Maas Shale Steering RATIO 20-50% Average DLS = 2.4 ROP:42 m/hr Severe Losses crossing Flt
42
June 2010
Typical Ostra development wells followed this design. For example, there was a remarkable increase in the number of actual faults encountered during drilling compared to those anticipated from seismic interpretation. In later wells, we were able to use the new PeriScope Ultra that can see up to 66 ft (20 m) radially into the formation. Because of the unconsolidated pay sections, we didnt want to implement aggressive steering to try to achieve 100% coverage. We elected to take a conservative approach guided by the logs to construct an optimum well path that would deliver the production results we wanted upon completion. As drilling progressed, cumulative knowledge and experience combined to improve drilling efficiency, narrowing the gap between planned and actual drilling days. With non-drilling NPT removed, drilling of the second Ostra well cluster experienced a 30% improvement in drilling efficiency compared to the first cluster. Innovations add spice to a traditional approach Thus, a typical well construction scenario included the following. First, 36in. conductor pipe for each well was driven into place on the seabed with positioning governed by the proposed subsea production manifold layout. Depth of the conductor pipe was about 165 ft (50 m). A novel technique was used by Intermoor to install the conductor pipe. The assembled conductor was transported to a location above the proposed well site using a flat barge towed by a tugboat. A hydraulic hammer was attached to the top end, and the hammer was attached to a chain/cable arrangement that was connected to a dynamically positioned anchor-handling vessel (AHV). The AHV was equipped with a remotely operated vehicle (ROV). After the AHV positioned itself directly above the proposed well site and held its station, the tugboat pulled the flat barge out
from under the conductor, allowing it to fall into the sea and swing like a giant pendulum until it stabilized in the vertical position. The AHV then lowered the now vertical conductor to the seabed, whereupon the hammer was activated to drive the conductor into the seafloor. Meanwhile, the ROV was deployed to attach itself to the conductor to help measure and maintain verticality as the conductor was driven home. This technique demonstrates the value of using the batch construction scenario; all three conductors were emplaced before the drilling rig arrived on location, so they were
Parque das ConChas
n
June 2010 43
ready in advance. No rig standby time was required while conductors were emplaced. The operation was a worlds first for deepwater. Next, the top-hole section was drilled using a 12-in. bit and 17-in. under reamer. This was not the original plan, but was decided after difficulties in achieving the desired dogleg in the soft, unconsolidated formations were experienced with the first well using a mud motor and bent sub to build hole angle. The final bottomhole assembly included the Schlumberger Xceed RSS
in conjunction with the Halliburton XRreamer, and this combination proved extremely successful, allowing penetration rates (ROP) to be increased by a factor of three, thus reducing section drill-time by half compared to the mud motor technique. In addition to fast drilling rates, hole quality was clearly improved with a smoother trajectory that contributed to higher casing running speeds and fewer casing problems. It has been proven that top hole quality is a major factor affecting the ability to reach extended lateral target depths. The top holes were drilled and cased to about 8,528 ft (2,600 m) measured depth, or 8,200 ft (2,500 m) vertical depth, below the rig rotary table. The top holes were cased with 1338 -in. casing cemented back to approximately 6,200 ft (1,900 m). Water depth at Ostra averaged 6,180 ft (1,884 m), so this means that the top holes bottomed out about 2,020 ft (616 m) true vertical depth below the mudline (seabed). Less is more Another first recorded on the BC-10 project was the successful drilling and completing of all wells using a thirdgeneration semisubmersible rig, the Transocean Arctic I. For each drill site, a pre-laid mooring system had been emplaced to position the rig precisely over each cluster of wells, greatly reducing rig-up time. The use of a thirdgeneration floating rig set a world record for mooring and drilling at this water depth and was enabled by the decision to use a surface blowout preventer (SBOP) stack and a high-pressure riser with an internal diameter of 14-in. Using a batch technique, three production wells were drilled and completed as horizontal, gravel packed subsea oil production wells. It was the first time an SBOP system was deployed from a floating drilling vessel for development drilling and completion. At the mud line, a seabed isola-
tion device (SID) provided the means to shut in the well in case of an emergency The primary activation technique was with a through-water broadband acoustic link, backed up by a control line umbilical strapped to the outside of the riser. Accumulators on the SID that powered the rams were kept fully charged from the surface using a hydraulic link built into the umbilical. An electrical link kept the SIDs batteries fully charged as well. Not only did the SBOP system double the water depth capacity of the rig to more than 6,000 ft (1,829 m), but together with the pre-set mooring system, it enabled the rig to move onto location and commence normal drilling operations the next day. Several innovations were added to provide safe and efficient means of configuring the rig for whichever operation was scheduled. A new hoisting system was installed on the rig so the SBOP could be quickly moved on and off wellcenter, depending if the rig would be drilling or performing completion activities. And a spacer spool the same height as the tubing head spool was added to the SBOP system. This kept dimensional consistency between drilling and completion operations. Both systems could be installed using a heave compensator and could be latched and unlatched using an ROV. The SID contained a set of shearing blind rams and a set of 75 8 -in pipe rams. Practice makes perfect To ensure rig crews were fully comfortable with the SBOP system, several training simulation drills were held. A color-coded warning hierarchy was developed with each set of potential conditions of sea state and offset defined. Green defined normal operating range, followed by yellow, orange, red, and emergency disconnect. During the drilling of the first Ostra cluster, foul weather necessitated a planned disconnect. The disconnect operation was conducted
The use of the surface blowout preventer (SBOP) or dry stack allowed the drilling rig to double its water depth capability, and is the first time a dry stack has been used for both drilling and well completion.
44
June 2010
Another first recorded on the BC-10 project was the successful drilling and completing of all wells using a third-generation semisubmersible rig, the Transocean Arctic I.
and reconnect established with minimal problems. As a result, the rig crew was confident that it could efficiently manage an emergency disconnect should the need occur. A special, slimbore wellhead housing was supplied by Vetco from which the main 95 8 -in. casing would be hung. This wellhead housing had to be slim enough to pass through the 14-in. riser and hang in the seabed wellhead assembly. No problems were experienced with the SBOP for the duration of drilling and completion operations of BC-10. The result was considerable savings of both time and money. Once the top holes were drilled, cased, and cemented, the intermediate sections were batch-drilled to their respective landing targets. For a typical Ostra well, a 12-in. hole was drilled and steered so as to land nearly horizontally in the target formation. The intermediate sections were cased with 958--in. casing hung back to the slimbore wellhead housing previously described. About 1,640 ft (500 m) of cement was used to set the casing and ensure well integrity. A synthetic-based mud system (SBM) was used in the intermediate sections to optimize ROP and borehole quality. Drilling the intermediate holes was a critical step requiring top-quality steering and drilling fluid control. During these sections, the well angle was built at a rate of 4 degrees per 100 ft (30 m) while holding the muds equivalent circulating density (ECD) precisely between the extremely narrow pore pressure and fracture pressure limits. Because such tight controls over drilling fluid density were maintained, it was possible to drill the wells safely with 9.2 ppg mud compared to the 9.4 ppg to 9.8 ppg mud weight requirements anticipated, all the while maintaining excellent hole cleaning. In anticipation of drilling the lateral production sections, the SBM was displaced out during the cementing operation. Special care was taken to clean all SBM from the inside of the drilling riser so as not to contaminate the water-based drilling fluid to be used in constructing the lateral sections. The finishing touch The final step in well construction was the delicate task of drilling and completing the lateral sections. A number of plan alterations occurred during the drilling of the laterals based on experiences encountered. The initial plan was to drill the lateral sections using the RSS to drive an 8-in. bit and the XR reamer to open the hole to 9-in. in diameter. Despite formation fracture pressure gradients ranging from 9.8 ppg to 10.0 ppg, some moderate losses were encountered even with 9.0 ppg drilling fluid and ECDs maintained between 9.7 ppg and 9.8 ppg. It should be noted that most, if not all, of the drilling decisions at this point were predicated on ensuring the success of the subsequent completion
phase. A key success factor in the ultimate well performance following completion was the skillful handling of fluid ECD to maintain borehole stability while not contributing to formation damage. Ultimately, the team was able to maintain ECD within 0.2 ppg of the fracture pressure gradienta phenomenal achievement. Developing the completion scenarios Because the reservoir rock basically consisted of unconsolidated turbidities, a sand management completion was designed. Halliburton installed 5-in. wire-wrapped screens, centralized with 7-in. Spirolizer stand-offs to allow uniform gravel pack placement around the entire screen. The screens were designed as stand-alone sand management media with the gravel pack as added insurance. Dowhhole completion techniques and results During the completion of the first six Ostra wells, difficulties were encountered in placing the gravel pack on three of the wells. The plan was to pump the gravel in two waves. The initial, or alpha, wave was intended to fill the bottom of the lateral section from toe to heel. The second, or beta, wave would attempt to pack the remaining half of the lateral from heel to toe. Because the gravel pack was intended as a secondary sand management technique, and primary sand management would be performed by the stand-alone screens, it was decided not to attempt to run costly shunt tubes to try to improve gravel distribution across the completions. Premature screen-outs occurred on three of the Ostra wells predicating a detailed root-cause analysis that concluded the most likely cause was inadequate hole cleaning sequences prior to gravel placement. As a result of the root-cause analysis, for subsequent wells, four changes were made to the construction plan:
Parque das ConChas
n
June 2010 45
The drillship Transocean Deepwater Navigator used for BC-10 exploration/appraisal well drilling underwent a multimillion dollar conversion to extend its water depth capabilities to 7,218 ft (2,200 m). (Photo courtesy of Shell)
For Phase 1 of the project, six production wells were constructed on Ostra, two on Argonauta B-West, and one on Abalone.
n
has many more riser slots than are currently being used. These can accommodate additional development wells that may be required as reservoir conditions change. Although the wells have been designed to minimize the necessity for intervention, the downhole measurements will prove to be valuable if such actions are ultimately required. Beneficial learnings For Phase I of the project, six production wells were constructed on Ostra, two on Argonauta B-West, and one on balone. In addition, one gas injection well was drilled in Ostra. A seventh well was added to the Ostra scope late in 2009, and this well will be hooked up later in 2010. This latter well is a temporary solution to avoid the necessity of flaring gas. Ultimately, all produced gas will be tied back to a Petrobras gas pipeline projected to be ready later in 2010. First oil from the BC-10 complex was recorded on July 12, 2009. As each well was drilled and completed, cumulative learnings were applied to subsequent wells, making each operation a little bit more efficient. n
Raise the density of the solids-free drilling fluid placed in the open hole slightly to maintain borehole stability by keeping the same hydrostatic pressure on the borehole during gravel pack operations. Increase KCl concentration in the drilling fluid to delay shale imbibition. Perform wellbore cleanout operations before drilling out of the intermediate section to minimize the open-hole time in the lateral before the gravel was emplaced. Minimize or eliminate azimuthal or inclination changes while drilling the lateral section.
The above changes were implemented when constructing the Argonauta wells with clearly observable improvement.
Reservoir management planning Permanent downhole gauges have been installed to assist in reservoir management. Over time, it is anticipated that reservoir parameters will change. Downhole measurements allow these changes to be anticipated and timely remedial action to be taken to minimize any potential negative effect. The umbilical control lines that service each wellhead have the capability of transmitting vital production data in real time to the field control center aboard the floating production storage and offloading facility (FPSO). They also contain conduits so flow assurance chemicals can be delivered to each well as needed to sustain production. The data from each well is stored and analyzed in a dynamic 3-D reservoir model so the entire reservoir can be managed in a holistic way for production optimization over its economic life. The FPSO
Unique placement of conductor casing involves launching off a flat barge and suspension beneath an AHV in a giant pendulum motion.
June 2010 47
Future Plans
sister field Argonauta B-West, so the valuable learnings from the B-West development can be applied to O-North. Preliminary plans call for O-North to be produced using seven wells producing to one ALM and then traveling about 5.5 miles (9.0 km) to the risers and the FPSO. Tentative plans show four seawater injector wells planned for the flanks of the O-North structure. Since the crude oil is similar to that produced at B-West, it is anticipated that the caissons will be similar and will recombine the gas to mix with the crude at the pump intake to stabilize the flow. Argonauta O-North is an Eocene-age stratigraphically controlled sandy turbidite apron. It was discovered with the exploratory well 1-SHELL-09-ESS. Development of the O-North field will benefit from the facilities installed during Phase 1 of the project. n
Sustainable development means that peaceful scenes like this one will not be affected by hydrocarbon production offshore.
(Photos courtesy of Shell)
48
June 2010
Acknowledgements
Parque das Conchas An Ultra-Deepwater Success Story Jaryl Strong Shell Publications Lead Ray VanNorman Shell Publications Manager
June 2010 49
PRofIles
Table of ConTenTs
Delmar Schlumberger FMC Technologies Transocean Oil States Industries Inc. SBM Offshore Multiphase Solutions Baker Hughes Oceaneering InterMoor Bredero Shaw 51 52 56 58 59 60 61 62 64 66 68
50
June 2010
Delmar
June 2010 51
Schlumberger
EcoScope multifunction logging-while-drilling service. measurements/logging-while-drilling services helped in many aspects of the drilling process to improve performance, and well placement maximized the productive reservoir penetrated by the wells, he noted. specifically, the shallow nature of the field, which occurred 2,953 to 3,609 ft (900 to 1,100 m) total vertical depth (tvD) below the mudline, resulted in the need to start the buildup section near the mudline. building the 1712-in. hole to 40 degrees inclination in the initial 1,804-ft (550-m) tvD subsea was found to be very challenging in the soft pliocene and miocene sediments, which required several changes in the drilling assembly and procedure, said Zambrano. using such platforms as the schlumberger perform* tool kit and petrel* seismic-to-simulation software, drilling and subsurface data were integrated. understanding the drilling behavior of specific formations and the lithology at various depths helped in the redesign of the bottomhole assemblies (bHas) and well paths, refinement of the steering program, and updating of the lwD [logging-while-drilling] requirements, Zambrano said. this demanding project necessitated turning the wells in very shallow, soft sediments, said alex kletzky, schlumberger brasil ioc account manager. not every tool can do that, but this was a technical challenge schlumberger was able to meet. the successful drilling solution used the powerDrive Xceed* 900 rotary steerable system bit 1214 in. enlarging the hole to 1712 in. with a reamer above the directional tools. with this configuration we were able to drill seven top sections, even reaching 47 degree inclinations at the 1338-in. casing shoe and
52
June 2010
reducing the drilling time to half when compared with the first three top sections, which were drilled with a conventional motor assembly, Zambrano said. The 1214 sections (the buildup section) included challenging high dogleg (DLS) requirements and complex lithology among interbedded shales, siltstones, and hard limestone layers, said Zambrano. That generated different directional responses that required additional work by Shells geology and drilling departments and Schlumbergers drilling engineering team in order to achieve a better understanding of the directional performance and formation response to plan the correct drilling parameters and improve the drilling performance. That teamwork, combined with the specific application of the PowerDrive Xceed* 900 rotary steerable system for harsh rugged environments, were the keys to success that guaranteed a constant DLS generation up to 4.5 degrees/30 m. Another drilling challenge that Shell and Schlumberger encountered was the need to land the wells in the approximate desired targets. The correct surveying procedure became critical in order to achieve this goal, said Zambrano. We corrected the drillstring magnetic interference running while drilling with the Schlumberger DMAG* software, reducing the uncertainty of the MWD [measurement-while-drilling] reading in half. Induced fracturing, opening of minimum-stress faults, and the presence of high-permeability sands resulted in substantial synthetic-base mud losses. Hole cleaning management was very important in drilling this section, Zambrano noted. On this matter, the annular pressure while drilling and equivalent circulating density readings from the arcVISION* array resistivity compensated tool were very important to the successful drilling, providing confidence to the drilling team of the operational limits and improving the drilling and hole cleaning performance. The high net-to-gross reservoir model predicted from the vertical appraisal well and the need for gravel pack sand control led to a completion interval design with a straight line well path inclined near 88 degrees for the 812-in. by 912-in. reservoir section, said Zambrano. This philosophy proved too simplistic and changes to the well trajectories were made. For the 812-in. sections, the Shell operations team and the Schlumberger well placement team worked closely through the planning and drilling of the last five horizontal wells, constantly updating the models and analyzing the real-time data to take advantage of all of the available data and minimizing the amount of non-reservoir interval drilled. A variety of Schlumberger tools were used to improve the well trajectories in real time. LWD tools used included Schlumbergers proVISION* real-time reservoir steering service (mineralogy and permeabilty), geoVISION* image-while-drilling service (bit & ring resistivity and resistivity image), PeriScope* bed boundary mapper, and EcoScope* multifunction LWD, which include resistivity, gamma ray, density-neutron, caliper, PEF, sigma, and image services.
PowerDrive Xceed rotary steerable system. The proVISION tool delivers reliable determination of mineralogy-independent porosity, bound- and free-fluid volumes, permeability, and pore size, as well as identification of fluids. This deep-reading tool has a field-proven dual-wait-time capability for direct hydrocarbon detection. Operating independently of resistivity measurements, the tool locates low-contrast, low-resistivity pay. The answers provided by the proVISION tool may be used to optimize wellbore length by matching the wellbores producibility characteristics to the planned completion capabilities. The tool maximizes production by drilling the highly permeable zones and avoiding water cut by using knowledge of irreductible water saturation. The proVISION tool can be placed anywhere in the BHA with no detrimental effects on the drilling operation. The geoVISION resistivity sub provides real-time highresolution resistivity images to the WellEye 3-D borehole data viewer. The WellEye software operates on a personal computer at the well site to provide 2-D and 3-D interactive displays of the borehole along the well trajectory. The interpreter can readily visualize the spatial position of log features on the dynamically linked displays.
Parque das ConChas
n
June 2010 53
Schlumberger
The PeriScope bed boundary mapper is revolutionizing well placement by providing the ability to see the reservoir as wells are being drilled, thereby eliminating sidetracks on wells and enhancing production. With the industrys first deep and directional electromagnetic LWD measurement, the position of the formation and fluid boundaries can be monitored up to 21 ft (6.4 m) away, thereby allowing horizontal well drilling entirely within the sweet spot. The deep measurement ranges gives early warning when steering adjustments are required to avoid water, drilling hazards, or exiting the reservoir target. The EcoScope multifunction LWD service integrates the next generation of LWD measurements into a single collar. By running the Orion II* telemetry platform, real-time data transmission of up to 120 bps is possible. Multiple real-time images can be seen without affecting the high resolution of the measurement curves. And measurement of the formation density without the sidemounted cesium source makes the service the first to offer commercial LWD nuclear logging without traditional chemical sources. This project marked the groundbreaking introduction of PeriScope ultra-deep services in its first run for an IOC in Brazil and the first run in conjunction with proVISION worldwide, providing a wide, complete set of rock and formation properties which, together with pre-drill, real-time, and post-well modeling
using the Schlumberger RTGS* real-time geosteering software, contributed to minimize the amount of non-reservoir interval penetrated, Zambrano said. The well found on average a 10 to 15% higher N/G than the first three wells drilled without it. The modeling and pre-planning of the drilling contributed significantly to the projects success, said Kletzky. Those aspects combined with the close cooperation between Schlumberger and Shell personnel during the actual drilling brought good results. The Shell Brasil team provided very active support for Schlumberger on this project and helped the team learn and perform better. Schlumberger Wireline plays an integral role Early in the Parque das Conchas project, the services of Schlumberger Wireline were used for formation evaluation purposes on some of the exploration and development wells. Key petrophysical and reservoir evaluation answers on this field for Shell came from Schlumberger Wireline tools, said Eric Englehardt, Schlumberger Wireline IOC Account Manager. Tools used included the Platform Express* integrated wireline logging tool, CMR* combinable magnetic resonance tool, DSI* dipole shear sonic imager, and the MDT* modular formation dynamics tester. In 2009, as the project shifted to its gas disposal wells, Schlumberger Wireline was given the task of logging some unconventional openhole tool combinations in order to reduce rig time. A special switch was developed to help make these combinations compatible, thereby allowing logging the entire requested logging suite in one single rigup. We were not forced to come out of the hole to change tools, said Englehardt. The success of running these tools in this new configuration helped reduce Wireline rig time by more than 50%, bringing huge savings to the project. With the proper planning and preparation, Schlumberger Wireline has been able to and will continue to support Shell in the delivery of top quality data and efficiency throughout the life of the Parque das Conchas project. Cementing also fulfills an important function Schlumberger Well Services performed primary and remedial cementing jobs for the wells in the Parque das Conchas block. Shell requested a customized solution to adapt Schlumbergers Surface Dart Launcher [SDL] to existing casing hardware they had chosen, said Luiz Picone, Schlumberger Client Support Engineer. The SDL is part of the DeepSea EXPRES* offshore plug launching system, which also includes a subsea tool (SST.) The SDL contains identical darts launched during cementing. The darts release casing wiper plugs when they reach the SST. Since the SDL is modular, adding segments is simple and the number of darts that can be launched can be easily increased. Using darts instead of a free fall ball helps prevent contamination, provides positive fluid displacement, and saves time, said Picone.
proVISION real-time reservoir steering service. After dart launch, mud flows down the drillpipe, through the sliding sleeve of the SST, and out of the orifices. The dart lands on a rod and continued pumping forces the dart and rod down, pushing the plug out of a basket. A spring retracts the sliding sleeve, allowing complete, unobstructed flow through the orifices. A pressure differential resists rapid rod motion and stops rod movement after plug release. Combined with plug friction, this caused increased pumping pressure and provides indication of plug launch. Spacers prevent plugs from sticking and are retrieved with the tool. The downhole SST encases plugs inside a basket, eliminating difficulties associated with pumping fluids through the inside of the plugs. Simplified plug design allows use of high-performance, easily drillable plugs. All of the 958-in. cementing jobs were successfully executed, said Picone. To prevent losses, CemNET* advanced fiber cement was used in the cement slurry. The inert, fibrous material is capable of forming a network across the loss zone, allowing circulation to be regained and maintained. Full returns were observed, noted Picone. Schlumberger, Shell a team from the projects beginning The association between Schlumberger and Shell on the BC-10 project began back in the early 2000s and will continue through the next decade. Schlumberger took part in the early exploratory work for the Parque das Conchas project, said Kletzky. We look forward to working with Shell on the second phase of the project that will start in late 2011. Our Schlumberger team members, along with those from Shell Brasil, utilize the best practices in a safe manner to produce the very best project results. n
* Mark of Schlumberger
Paid Sponsorship
Schlumberger Servios de Petroleo Limitada Av. Presidente Wilson 231, 20th floor Rio de Janeiro, Brazil Phone number: +55 21 3824-6923 www.slb.com
Parque das ConChas June 2010 55
FMC Technologies
Two gas/liquid separation and ESP boosting modules assembled on top of the artificial lift manifold are shown. Two of these manifolds were installed in Parque das Conchas.
(Photos courtesy of FMC Technologies)
All subsea separation and production equipment for BC-10 was manufactured at FMCs plant in Brazil.
56 June 2010
n
project in Malaysia. since these designs have been used on other shell deepwater projects, the company was able to move fast and at less cost by using a global standard and avoiding the time and cost to redesign the tree system for different projects. with the synergy at the components/tooling level, less shell project staff was needed during the engineering phase. the new subsea tree, which received the new technology award at the offshore technology conference in 2008, features a number of enhancements. the actuators, seal, and connectors have all been upgraded to FMcs latest standard product offering, and the tree features a 1358-in. oD tubing hanger system, allowing interface to the surface Bops. the tree system also incorporates a retrievable flow control module in place of the traditional insert retrievable choke, which can be configured to accommodate a choke as well as a single or multiphase flowmeter. this allows production downtime to be cut from a matter of days to a matter of hours during maintenance and meter replacement. additional benefits include the ability to shift a tree between production, water injection, or gas injection by changing the flow control module. the evDt also allows for flexibility in installing tubing hangers, permitting a customer to either use a tubing head or to simply land the tubing hanger directly into a wellhead without the need for a tubing head. this results in a more efficient installation when completion and drilling operations are conducted and does not require a customer to retrieve the subsea Bop and riser.
FMC has a long relationship with Shell in the Gulf of Mexico, said Villasboas. Our subsea expertise and the seamless work environment developed between our companies throughout the years have resulted in successful teamwork. We believe that, after evaluating the local industry challenges and capabilities in Brazil, Shell saw that the successful business model created in Houston could be replicated with FMC Technologies do Brazil given our local subsea expertise and manufacturing capability. Besides the technologies engineering capability, FMC was able to support Shell in dealing with logistics and other associated business matters in Brazil. FMCs scope of supply on the project included 10 subsea trees with tree mounted controls rated at 10,000 psi; two subsea production manifolds; two subsea artificial lift manifolds (ALMs); six subsea separation and boosting modules; 15 PLETs; 26 rigid jumpers; one completion and workover riser system with intervention, workover, and control systems; topsides controls; and subsea mounted controls. The subsea system was engineered and manufactured at FMCs facilities in Rio de Janeiro. New technology used on the project included 1,500 electric submersible pumps (ESPs) which were rated to provide subsea boosting of up to 2,300 psi. Also, in the BC-10 Vertical Caisson Separator (VCS) System, the multiphase flow was introduced through a purposefully angled and tangential inlet. This inlet allowed for smaller caisson diameters, said Villasboas. The separation of the multiphase inlet flow into liquid and gas components occurs as the stream spirals down inside of the VCS. Centrifugal and gravitational forces cause the heavier elements (solids and liquids) to be thrown outward to the VCS wall and downward to the Caisson Sump (CS). The ESP suspended from the ESP Hanger on the tubing pumps liquids and associated solids from the CS to the Top End Assembly (TEA) flowloops through the Manifold Multibore Interface (MMI) and downstream through in-field flowlines to the Production Host Facility (PHF). The gas liberated from the multiphase stream rises naturally through the annulus created between the outside diameter (OD) of the ESP tubing and the internal diameter (ID) of the VCS into the TEA flowloop, through the MMI and downstream through the in-field flowline to the PHF. The ESP string, TEA, and VCS may be retrieved sequentially from the permanently installed manifold. There were many challenges in this project as it was the biggest subsea system ever delivered by FMC Technologies in Brazil, and it also included a large portion of new product development, said Villasboas. The early development of the Artificial Lift System contributed to improvement in the project schedule by enabling managers to order items with long lead times and immediately launch into the detail design engineering at final investment decision (FID). Also, the System Integration Testing performed on the Arctic 1 rig enabled identification of critical interfaces, anticipation of problems, and avoided rig downtime during boosting modules installation. This was a very good practice that will be followed by future projects.
By utilizing FMCs subsea separation technology, the Parque das Conchas project became more economically viable. The field was characterized by low reservoir pressure, which made it difficult to bring the hydrocarbons to the surface, said Bill Houston, Project Development Manager. Subsea separation and boosting is an excellent option for a low energy reservoir like Parque das Conchas. The FMC team in Brazil included 25 project management personnel as well as 60 project management people supported by various other departments and plant employees at the FMC Technologies facility in Rio de Janeiro. This has been another successful project in the long track record of success enabled by the strategic relationship between Shell and FMC, said Villasboas.
Shell and FMC have worked together on some of the industrys most complex deepwater projects.
Jeff Mathews, Shell Global Business Program Manager
And, following in the footsteps of the EDVT innovation, FMC Technologies expertise again will be honored at the 2010 Offshore Technology Conference with another Spotlight on New Technology Award this time for its Self Configuring Multiphase Meter. The meter has been rated at 15,000 psi and temperatures of up to 480F (249C). It also has been designed for use at water depths of 11,500 ft (3,500 m) and performs in multiphase and wet gas applications. Through the use of 3-D tomography imaging, the meter significantly improves the measurement accuracy and range of multiphase product flow. The self-calibrating meter detects and measures water salinity in combination with other liquids in a flow stream, thus saving operators time and enhancing production knowledge. Working together since the early 1990s, Shell and FMC Technologies have successfully developed some of the worlds most challenging projects including Shells Mensa project, the Shell Coulomb Field, and the Shell Princess Project. Shell and FMC have worked together on some of the industrys most complex deepwater projects, said Jeff Mathews, Shell Global Business Program Manager. We continue to look forward to supporting Shells projects throughout the globe. n
Paid Sponsorship
1803 Gears Rd. Houston, Texas 77067 Tel: (281) 591-4000 Fax: (281) 591-4102 E-mail: corporate.info@fmcti.com www.fmctechnologies.com
Parque das ConChas June 2010 57
Transocean
Transocean used surface BOP technology in BC-10 drilling and completion activities. (Photo courtesy of Transocean) While Brazilian waters are relatively benign, the SBop system on the parque das Conchas project could still be disconnected quickly in an emergency, if required. to further optimize the rigs performance, the GSF Arctic I utilized an onboard computer system for Halliburtons insite Anywhere web delivery service. this real-time operations center enabled Shell to track and optimize the rigs drilling performance data anywhere in the world through the worldwide web. the experiences gained on the parque das Conchas drilling and completions campaign will undoubtedly be applied to future projects, and transocean and the crews of the GSF Arctic I congratulate Shell and its co-venturers petrobras and ongC on a successful project and look forward to the next opportunity. n
Paid Sponsorship
a total of 170 riser joints of 50 ft (15 m) length were supplied to X80 pipe specification together with 18 pup joints of various lengths, said John gallagher, Development manager. a riser spider together with two connector makeup tools also was provided. the spider was fitted with a gimbal to minimize stress in the riser due to vessel motion. all the risers were shipped in custom-designed frames, each accommodating four standard riser joints. since the riser needs to be installed and retrieved frequently without suffering any loss in performance of the metal seals that are integral to the merlin connector design, an extensive testing program was implemented to demonstrate seal integrity and structural capacity after multiple connector make ups. assembly tooling for the merlin connector was specifically
Corporate Headquarters Oil States Industries Inc. P. O. Box 670 Arlington, Texas 76004-0670 7701 South Cooper Street Arlington, Texas 76001 Tel. +1 817 548 4200 Fax. +1 817 548 4250 E-mail: headqtrs@oilstates.com
Parque das ConChas
n
June 2010 59
SBM Offshore
during the Feed phase of the Parque das Conchas project, shell considered a number of riser systems including steel catenary risers, flexible risers, and hybrid risers. shell also conducted a study to verify that the use of flexible risers was feasible based on the projects riser diameters and water depths. since fatigue of the riser at the touchdown point ruled out sCrs and the cost of hybrid risers was deemed too high, sLWrs and flexibles were then evaluated based on payload, cost, and schedule. While costs of the two systems were comparable, the sLWr system payload proved to be approximately 50% of the flexible riser system. scheduling for the flexibles also became a problem since the offshore market was booming at that time and the flexible manufacturers lead time to deliver the risers was incompatible with the project schedule.
60 June 2010
n
Multiphase Solutions
15115 Park Row, Suite 201 Houston, Texas 77084 Tel: (281) 646-1515 Fax: (281) 646-8700 www.multiphase.com
SBMOffshorecontinued
sBm offshore designed and supplied the slWr and umbilical pull-in equipment while working closely with the shell team to ensure the compatibility of rigging pulling head and key interface equipment. all the offshore operations of pull-in through the i-tubes were performed successfully as part of the site integration tests. Working hand-in-hand, shells design of the riser clamp casting enabled sufficient tolerance while providing an efficient way to secure the structural interface with the i-tube bottom. meanwhile, sBm offshores winch platform design enabled perfect alignment of the winch cable to the i-tube axis. as a result, the pull-in team would have been ready for another pull-in within six to eight hours, which indicates that the pre-installation of slWr and recovery of the slWrs and umbilicals from the seabed is an effective strategy to reduce the path to first oil. n
Paid Sponsorship
Monaco Engineering Office 24 Avenue de Fontvielle P.O. Box 199, Monaco Cedex MC 98007 Principality of Monaco Tel: +377 92.05.15.00 www.sbmoffshore.com
Parque das ConChas June 2010 61
Baker Hughes
hardware configuration. This differs from the approaches where the ESP is considered as a separate item instead of being pre-planned as part of the final configuration, Martinez said. Baker Hughes dedication to delivering reliable and technically innovative products and services was applied to the full scale of the process, from the initial research and design efforts through describing the application, qualifying the manufacturing, transporting, and installing the solutions through to commissioning and operation of the equipment. This project presented unique challenges and demanded innovative approaches to meet Parque das Conchas needs, Martinez noted. Although we have a demonstrated track record in subsea applications, the complexity of this subsea infrastructure and associated procedures for BC-10 called upon many of our resources. Many hours were dedicated to workshops, internal meetings and meetings with Shells experts. Testing of new solutions was required for hardware and new procedures were developed to operate and control the ESP equipment. Many of the hardware solutions on the BC-10 ESP equipment are unique. Specifically, the motor used for the ESPs in the BC-10 development was designed and manufactured with new high-end technology seals. Vanguard has been proven to enhance reliability when compared with standard motor construction, said Martinez. The extreme performance motor with Vanguard technology is a precision design, manufactured to the highest industry standards. The motors are assembled in a specially designated facility under the close scrutiny of design engineers from Centrilift, a Baker Hughes subsidiary. The main hardware improvements were made to the seal section and were required because of expected rapid gas decompression during some transient periods of operation. Baker Hughes developed solutions to hold up to 1,000 psi per minute of gas decompression from 3,000 to 1,000 psi and 350 psi per minute from 1,000 to 300 psi, he said. Rapid decompression is detrimental to all elastomers, necessitating evaluation of composition and change to metal configurations. Components, such as the o-rings on the motor and pump and the power cable were evaluated. The BC-10 operational procedures are unique and involve a new philosophy of how to operate ESP equipment, Martinez noted. Commissioning of the system and startup has been flawless and the system is in continual operation. To date, there is no subsea boosting system that has the high-volume and high boosting pressure capabilities of this Baker Hughes ESP system, which is considered the most cost-effective solution to the type of operations present in the BC-10 development. Martinez said the main objective of all the research was to bring the lessons learned to the design stage, thereby reducing the learning curve during the operational phase. The applied technology and research enhances the run life of the ESP system and, ultimately, will result in a reduction in the number of interventions.
Early research and development also improved the quality and outcome of a project which is often influenced by the process and relationship between the operator and the contractor. In many cases, the operator focuses on the ESP as hardware only, neglecting the importance of the process in the conceptual phase of the project, Martinez noted. Our work with Shell demonstrates the benefits gained with collaborating to solve unique challenges. Many Baker Hughes personnel contributed to the success of the project, especially those located in Brazil. The entire system has been installed and operated by Brazilian people, demonstrating the expertise available in the region for delivery of this type of high-end project, said Martinez. Rui Pessoa, a member of the Brazil team, was the dedicated desk engineer located in Houston who committed more than 18 months to project details. Other key personnel included Howard Thompson and his team as technical support; Carl Grotzinger and Ben Gould as project managers and Bill Largess and his team who managed all processing and manufacturing in Claremore, Okla. All advance qualification testing for every piece of the system was performed using the test wells in the Claremore facility. Our management dedicated its best resources from the region as well as from headquarters. Research and development was used in installations in Claremore for several studies. The most important was the development of a new high viscosity loop to determine pump operating performance and motor temperature profile in high viscosity scenarios. This was the first time ever that high volume pumps (10,000 b/d to more than 40,000 b/d) were tested under those conditions and the results were exciting demonstrating that high volume ESP pumps can be much more efficient than expected, said Martinez. This was a dedicated, successful partnership with Shell which led to further improvements in our processes, products and quality of our services, Martinez noted. Our collaboration with Shell resulted in a mutual understanding of critical interfaces and delivery of innovative solutions. n
Paid Sponsorship
Baker Hughes 2929 Allen Parkway Houston, Texas 77019 Tel: (713) 439-8135 Fax: (713) 439-8135 www.bakerhughes.com kathy.shirley@bakerhughes
Parque das ConChas
n
June 2010 63
Oceaneering
The 30-ton bobbins on the cabling machine resulted in fewer splices in the power triads. (Photos courtesy of Oceaneering)
64 June 2010
n
Three each, 18 ft (5.4 m) dynamic bend stiffeners (BSR) with a remotely operated vehicle (ROV) operable latching system; n Two thousand feet (600 m) of VIV suppression devices (strakes); n Two hundred distributed buoyancy modules; and n Multiple repair splice kits and subsea Umbilical Termination Head (UTH) interface assemblies with vertebrae bend restrictors (VBR). Extensive experience in the design and manufacturing of umbilicals combining power transmission with production control functions allowed Oceaneering to address the design challenges specific to this type of umbilical, such as internal heat generation, electrical interference, and increased mechanical loads. Oceaneering developed and enhanced existing techniques to study the interaction of the MV and LV electrical circuits, including their impact on the operating temperature of the umbilical in the upper section of the dynamic umbilicals, Emery noted. We also performed 3-D thermal analysis to evaluate the effect of the insulating properties of the unusually large polyurethane bend stiffener on the operating temperature of the umbilical. Other specific testing included: n Tension/torsion testing; n Crush and installation simulation; n Reverse bend and flex fatigue; n Qualification of splicing techniques and abandonment caps; n Verification of electromagnetic interference (EMI); and n Multiple mechanical tests of hardware components. Two of Oceaneerings accomplishments on the project will likely make an impact on the BC-10 projects life cycle operating costs. Improved power transmission quality results in lower voltage imbalances on the subsea pump motors, thus improving their reliability, said Matt Smith, Oceaneerings Commercial Operations Manager. Additionally, use of a single umbilical riser cross section reduced the costs of the qualification program. As with all umbilical projects of this size and complexity, Oceaneering put in place a dedicated project team to ensure successful completion of the project scope. Oceaneering dedicated five full-time team members at our facility in Panama City, Florida, during the execution of the BC-10 project, said Wood. Three full-time team members in Brazil contributed to the project along with multiple other team members who joined during specific phases of the work. Cumulatively, more than 200 Oceaneering employees played a role in the successful completion of the umbilical scope for the Parque das Conchas project. Oceaneering utilized a variety of its facilities around the world to bring their part of the project to fruition. The BC-10 umbilical supply was an example of successful cross-regional project execution, said Smith. Each of Oceaneering Multiflex three umbilical factories (in Panama City; Rosyth, Scotland; and Niteri, Rio de Janeiro, Brazil) are capable of supplying a full range of products and services. In the case of BC-10, Oceaneering was able to bring this global capacity to bear, supplying the long-length
n
Loadout of the umbilicals at Oceaneerings deep-draft quayside. umbilicals from Panama City while supplying the flying leads and performing qualification testing in Brazil. A comprehensive list of lessons learned from the BC-10 project will be incorporated into future practices. We made significant advancements in our technical capabilities with respect to the electrical, thermal, and dynamic analysis activities required to support this type of major project, said Chartier. We developed and implemented new splicing techniques for the MV power conductor trefoils and we applied updated processes to improve the safety and quality of oversheathing steel tubes. With the successful completion of the Parque das Conchas umbilical, Oceaneering is looking forward to the next challenging project. Due to the compelling economic impact of subsea pumping, umbilicals for this type of application are among the fastestgrowing sectors of the umbilical market, said Charles (Chuck) Davison, vice president of Oceaneering Multiflex. Oceaneerings successful execution of the BC-10 umbilical project is the result of ongoing investments in people, processes, and facilities dedicated to maintaining market leadership in this technology. The umbilicals that Oceaneering designed, manufactured, and tested for the Parque das Conchas project demonstrate our commitment to provide superior technical solutions for the most challenging deepwater developments. n
Paid Sponsorship
Oceaneering Multiflex USA Corporate/Sales Office 11911 FM 529 Houston, Texas 77041 Tel: (713) 329-4500 Fax: (713) 329-4603
Parque das ConChas June 2010 65
InterMoor
A 55-ton, 4-tube, ALM template is hung off vertically in the stern of the AHV prior to launch. (Photo courtesy of InterMoor) set the anchors firmly in the seabed at which time the valve is closed and the anchor is ready for rigging. on the Bc-10 project, the anchors were rigged chain/poly/chain with both the upper and lower ends of each mooring line made of steel chain and the center (longest) span made of polyester rope. polyester rope is almost neutrally buoyant in water so it provides the required tensile strength without adding weight to the vessel. anchor lines were pre-laid on the seabed, so when the Espirito Santo arrived all that was required to moor her was to pull in the nine anchor lines, tension them properly, and make them fast to the cleats in the turret. Conductor placement challenges interMoor was also challenged to pre-install conductor casing for the Bc-10 development wells and for the production caissons that housed the artificial lift systems. For the 36-in.-diameter well conductors, the main challenge was timing. they had to be pre-installed off the critical path for the Arctic 1 drilling rig so as not to delay drilling. For the 48-in.-diameter artificial lift conductors, the challenge was precision. they had to all be driven to the same level (within a 2-in. tolerance of each other) and within 1 degree of verticality. in all, 17 conductors were installed.
InterMoor managed this project from conception through development and finally execution. These conductors were the first pre-installed driven conductors in deep water, and during the project development and execution there were several other industry firsts, as could be expected when operating in waters ranging in depth from 5,412 to 6,298 ft (1,650 to 1,920 m). Among these were: n Vertical transportation and insertion of massive artificial lift module (ALM) templates into the water followed by horizontal lowering to the seabed; n Deepwater hydraulic hammer spread deployed and operated from an anchor-handling vessel (AHV); and n A new deepwater hammering depth record (6,298 ft). In addition, as a direct result of the learnings from Phase I of the BC-10 project, InterMoor engineers have designed and tested a prototype 15-ton enhanced passive heave compensator. It is specifically intended for metocean conditions on long-period deep ocean swells as found offshore Brazil and West Africa. As a result of the successful prototype testing, a commercial version rated to 60-tons is being built and design is complete for a 75-ton unit. The new design, which is unique in the industry, is currently planned for BC-10 Phase II conductor and ALM template installations. This helps enhance performance and helps retain the commercial advantage of performing the installation from a smaller vessel without the need for large construction vessels. Although conductors typically are installed using a jetting technique, for the BC-10 project a hydraulic hammer was planned. This was largely to ensure that the required vertical precision and setting depth accuracy could be achieved. This is because a driven product is better understood than a jetted product from a geotechnical perspective; therefore, the final capacity, penetration requirements, conductor length, and setup are easy to calculate. Driven installations have traditionally been conducted using very large crane barges or construction vessels. However, these vessels command a very high day rate and are of limited availability. Accordingly, InterMoor developed a technique to effectively launch conductors off a flat barge and install them using the operators own AHV. ALM templates set precisely The massive ALM templates were transported to location vertically on the back of the AHV. The large four-conductor ALM templates weighed 55 tons and the small two-conductor ones weighed 35 tons. They were carefully lowered into the water and only turned to the horizontal position after they were below the level of surface disturbance (waves and ocean swells). The ALMs were precisely positioned on the seabed within 20-in. horizontal and 1.5-degree heading tolerances. Fine-tuning was accomplished with the help of the ships remotely operated vehicle (ROV). All of the 48-in.-
diameter conductors were to be installed through alignment tubes in the templates. There was only -in. tolerance between the alignment tube ID and the conductor OD. Novel technique used After attaching the work wire from the AHV to the top of a conductor on the barge, the conductor was positioned on a sloping ramp and rolled off the barge into the sea. The conductor handling system was also designed and fabricated by InterMoor specifically for this project, and allowed for the safe movement of single conductors on the barge to the launching ramp. When entering the sea, the conductor filled instantly with water and swung in a pendulum motion through the water column until it stabilized in the vertical position under the stern roller of the AHV. Once in the vertical position, and hanging on the passive heave compensator, the rigging was checked by an ROV and the conductor was lowered to the seabed. On the seabed the conductor self-weight penetrated enough to ensure stability (both structural and geotechnical), at which point the ROV connected to a suction port on the suction to stability (STS) head and pumped out water from the conductor and gained additional penetration and further stability before landing the 80-ton hammer on the conductor for driving. The STS head was designed and fabricated by InterMoor to provide additional contingency in the case that the conductor stopped short during the self weight penetration phase. With the STS head removed, the subsea hydraulic hammer could be landed and the conductor driven to final penetration. Tolerance was met on all conductors the first time, with no re-driving required, mainly due to the hammer being able to reduce energy and to single blow counts during the final blows. This allows it to be a very controlled driving process, even at such depths. Advantages The single biggest advantage of this novel approach was that it removed the installation of 17 conductors from the rigs critical path; however, there is also an argument that this reduces risk because it reduces multiple handling of many large pipe sections offshore. It also delivers a well-understood product (driven conductor) with a known capacity, which is not the case with traditional jetted conductors. n
Paid Sponsorship
900 Threadneedle, Suite 300 Houston, TX 77079 Tel: 1-800-451-8106 Tel: 832-399-5000 Fax: 832-399-5001 www.intermoor.com
Parque das ConChas
n
June 2010 67
Bredero Shaw
Pipes protected with Syntactic Polypropylene for the Parque das Conchas pipeline project. (Photo courtesy of Bredero Shaw) Shells parque das conchas project, located in the Bc-10 block offshore Brazil, is a key milestone in the commercialization of heavy oil offshore Brazil. to protect this pipeline, Bredero Shaw coated 50 miles (81 km) of 6-in., 8-in.,10-in., and 12-in. diameter pipe with Syntactic polypropylene thermal insulation coating and 39.8 miles (64 km) of 6-in. and 8-in. diameter pipe with 3-layer polyethylene (3lpe) and fusion Bond epoxy (fBe) anti-corrosion coatings. in offshore oil fields, the flow of oil contains many types of hydrocarbons that can turn to solids when cooled to certain temperatures. as the oil flows from the wellhead to the processing facilities on offshore platforms, the temperature can drop below the point where certain hydrocarbons can turn to solids; effectively plugging the pipeline. Syntactic polypropylene is a coating designed to ensure that the temperature remains above
68 June 2010