CHECK LIST FOR PREPARING AMENDMENT TO
AUTOMOTIVE INDUSTRY STANDARD (AIS)
Amd. No 1 to AIS-048: Battery Operated Vehicles -
Safety Requirements of Traction Batteries

SR. PARTICULARS REMARKS


NO.
1.0 Is the amendment related to : Amendment is proposed to replace “Roll
i) Changes in technical requirements; Over test” with “Shock Test ” in case of
ii) Corrigendum CoP test plan of traction battery.
iii) Any other (Pl. specify)

2.0 Indicate details of base reference standard AIS-048


( amendments).

3.0 Add an explanatory note indicating deviations NA


from the above base referred standard
( amendments) in Sr. 2.

4.0 If amendment is for provisions in technical


requirements :
4.1 a) Does amendment call for re-type approval of No
component / vehicle, which is already type
approved?
b) Is amendment applicable to fresh type Yes
approval of component / vehicle
c) Do components / vehicles manufacturers / No
Test agencies require lead time to meet
requirements of amendment?

4.2 If amendment is related to corrigendum : NA


a) Whether changes are required in previous
approvals
5.0 What are the test equipments for establishing Vibration / shock test system
compliance to amendment?
6.0 If possible, identify such facilities available in ARAI, iCAT, CIRT, VRDE
India.
7.0 Are there any points on which special No
comments or information is to be invited from
AISC/ CMVR-TSC

If yes, are they identified?


8.0 Recommendation of date for implementation of With date of approval in AISC
amendment.

Explanatory note based on ECE/EEC Directive practices:


1. Amend.X = an amendment issued to the text of the AIS .
2. Rev.X = a Revision of the text comprising all previous text(s) of the AIS.
3. Corr.X = a Corrigendum consists of editorial corrections of errors in the issued texts.
Draft Amendment 1
To

AIS 048: 2009


Battery Operated Vehicles -
Safety Requirements of Traction Batteries

1. Page No. 7/16 Clause No 6.3.3

Substitute following text for existing test:


6.3.3 Shock Test (2.2.2)

Justification: AISC panel on AIS 037 has agreed to include Traction battery as safety
component for Type approval and Conformity of Production (CoP) requirements under the
purview of AIS 037 vide draft Amendment 6.

Conformity of Production (CoP) requirements for Traction Battery are already addressed in
AIS 048 vide clause no 6.0 with following tests.

1. Short Circuit Test (2.1.1)


2. Overcharge Test (2.1.2)
3. Roll Over test (2.2.3)

The same was discussed in 52nd AISC meeting held on 4th May 2016 at ARAI and decided to
replace “Roll Over test” with “Shock Test ” in case of CoP test plan of traction battery.

Shock test is considered so as to cover performance test for traction battery CoP testing.