1 2 3 4 5 6 7 8

A Cable 3-07
15 m.
Cable 3-04 Cable 3-01
15 m.
A
Cable 3-11 15 m.
7 m.

Floor bund
Cable 3-10 Cable 3-03 Floor bund
7 m. 15 m.
Cable 3-12 Cable 3-08
3 m. Cable 3-05 Cable 3-06 Cable 3-02
3 m.
7 m. 3 m. 7 m.

LEGEND
SYMBOL DESCRIPTION

B B
UNIT CONTROL
FG-NET

SATELLITE DEVICE
FG-BBOX

WATER CABLE DERIVATION BOX


CONNECTION CABLE

END PLUG
FLOOR WATER DETECTION CABLE
AERIAL TRAY WATER DETECTION CABLE
WATER POINT SENSOR

FLOOR BUS CABLE

AERIAL TRAY
C C
FLOOR BUND

TRUNKING CONDUIT

Cable 3-13 Cable 3-14 Cable 3-15


15 m. 15 m. 15 m.

Cable 3-17
Floor Bund detail built with stainless steel profiles
Cable 3-18 Cable 3-16
15 m. 15 m.
15 m.

D D
Cable BB1. 1-02
15 m.

Cable BB1. 1-01


15 m.

E E

AB02 02/02/23 LC AB -As Built


C01 31/01/22 JG A1 - For construction
P05 05/07/21 JG Updated project design changes July 1st, 2021
P04 03/06/21 JG Updated project design changes May 31th, 2021
P03 22/04/21 JG Updated with the scope reductions
P02 25/03/21 JG Updated revision marks March 25th, 2021
P01 16/03/21 JG Updated revision marks March 15th, 2021
Rev. Date. Drawn Description

REVISIONS SCHEDULE
CLIENT CONTRACTOR
NAME: DATE:
DRAWN: LMG 05/03/21
DESIGNED: LMG 11/01/23
Cable BB1.1-08 Cable BB1. 1-13 Cable BB1. 1-14
15 m. REVIEWED: LMG 02/02/23
15 m. 3 m.
PURPOSE OF ISSUE
F PROJECT F
Floor bund Floor bund AB - As Built
Floor bund
Equinix MD3
Cable BB1. 1-15
Cable BB1. 1-09 Cable BB1. 1-12 15 m. Cable BB1. 1-17
7 m. 15 m. 15 m. ZONE SUBDISCIPLINE - DRAWING
F-ENG-07-00

MD3.1 Data Hall First floor leak detection system (Floor)


MD4 ANC

REV
MD3.1 MD3.2 FILE NAME
AB02
MD031-TTK-ZZ-01-DR-M-AUXL-1003 SCL.
1/100