Professional Documents
Culture Documents
A Cable 3-07
15 m.
Cable 3-04 Cable 3-01
15 m.
A
Cable 3-11 15 m.
7 m.
Floor bund
Cable 3-10 Cable 3-03 Floor bund
7 m. 15 m.
Cable 3-12 Cable 3-08
3 m. Cable 3-05 Cable 3-06 Cable 3-02
3 m.
7 m. 3 m. 7 m.
LEGEND
SYMBOL DESCRIPTION
B B
UNIT CONTROL
FG-NET
SATELLITE DEVICE
FG-BBOX
END PLUG
FLOOR WATER DETECTION CABLE
AERIAL TRAY WATER DETECTION CABLE
WATER POINT SENSOR
AERIAL TRAY
C C
FLOOR BUND
TRUNKING CONDUIT
Cable 3-17
Floor Bund detail built with stainless steel profiles
Cable 3-18 Cable 3-16
15 m. 15 m.
15 m.
D D
Cable BB1. 1-02
15 m.
E E
REVISIONS SCHEDULE
CLIENT CONTRACTOR
NAME: DATE:
DRAWN: LMG 05/03/21
DESIGNED: LMG 11/01/23
Cable BB1.1-08 Cable BB1. 1-13 Cable BB1. 1-14
15 m. REVIEWED: LMG 02/02/23
15 m. 3 m.
PURPOSE OF ISSUE
F PROJECT F
Floor bund Floor bund AB - As Built
Floor bund
Equinix MD3
Cable BB1. 1-15
Cable BB1. 1-09 Cable BB1. 1-12 15 m. Cable BB1. 1-17
7 m. 15 m. 15 m. ZONE SUBDISCIPLINE - DRAWING
F-ENG-07-00
REV
MD3.1 MD3.2 FILE NAME
AB02
MD031-TTK-ZZ-01-DR-M-AUXL-1003 SCL.
1/100
1 2 3 4 5 6 7 8