You are on page 1of 1

1 2 3 4 5 6 7 8

BMS Tray

A A
Floor bund
Floor bund

Cable 3-09
7 m.
From Fg-Net
TR.1-08
Roof

L3
L1 BB1

BMS Tray
LEGEND
SYMBOL DESCRIPTION

B B
UNIT CONTROL
FG-NET

SATELLITE DEVICE
FG-BBOX

WATER CABLE DERIVATION BOX


CONNECTION CABLE

END PLUG
FLOOR WATER DETECTION CABLE
AERIAL TRAY WATER DETECTION CABLE
WATER POINT SENSOR

FLOOR BUS CABLE

AERIAL TRAY
C C
FLOOR BUND
Cable BB1. 1-07
15 m.
TRUNKING CONDUIT

Aerial Tray galvanized steel 3D Model Detail


TR.1-07

D D

TR.1-06

Cable BB1. 1-05


15 m.
TR.1-04

Cable BB1. 1-03


7 m.

Cable BB1. 1-06


15 m.
Cable BB1. 1-04 BMS Tray
Det. puntual
TR.1-05

E E

AB02 02/02/23 LC AB -As Built


C01 31/01/22 JG A1 - For construction
P05 05/07/21 JG Updated project design changes July 1st, 2021
P04 03/06/21 JG Updated project design changes May 31th, 2021
P03 22/04/21 JG Updated with the scope reductions
P02 25/03/21 JG Updated revision marks March 25th, 2021
P01 16/03/21 JG Updated revision marks March 15th, 2021
Rev. Date. Drawn Description

REVISIONS SCHEDULE
CLIENT CONTRACTOR
NAME: DATE:
DRAWN: LMG 05/03/21
DESIGNED: LMG 11/01/23
TR.1-03
TR.1-01 REVIEWED: LMG 02/02/23
Cable BB1. 1-10 Cable BB1. 1-11
7 m. 7 m. BMS Tray PURPOSE OF ISSUE
TR.1-02 CableBB1. 1-16
F Floor bund Floor bund Floor bund 7 m. PROJECT F
AB - Issue As Built
Equinix MD3

ZONE SUBDISCIPLINE - DRAWING


F-ENG-07-00

MD3.1 Data Hall First floor leak detection system (Aerial)


BMS Tray MD4 ANC

REV
MD3.1 MD3.2 FILE NAME
AB02
MD031-TTK-ZZ-01-DR-M-AUXL-1004 SCL.
1/100

1 2 3 4 5 6 7 8

You might also like