Application Form for Inter-connection of Renewable Energy Facility

to the MERALCO Distribution Grid

Name: Name of Owner


Address: Address of Owner

Contact Person: Contact Name of Person to Assist in Net Metering

Telephone Number: Contact of Person to Assist in Net Metering

Service Point Address:

Information Prepared and Submitted by (Name and Address):

Signature: Owner Name & Signature

All applicable items must be accurately completed in order that facilities may be effectively evaluated by
the Company for interconnection with the utility system.

GENERATING FACILITY
No. of Units: 1

Manufacturer: Deye

Type (Synchronous/Induction/Inverter): Inverter


Fuel Source Type (Solar, Biogas, Wind, etc.): Solar

kW Rating (95F at location) 8Kw

Kilovolt-Ampere Rating (95F at location): 0.34KVA

Power factor: 0.8 leading to 0.8 lagging

Voltage rating: 230V

Ampere Rating:
15.1A

Number of Phases: 1 Phase

Frequency: 50/60 Hz

Yes Yes ______ No


Do you plan to export power: ______
50%
If yes, maximum amount expected ___________

Pre-Certification label or Type Number: 2620/0211-E1-CER

Expected Energizing and Start-up Date: ASAP

Normal Operation of Interconnection (examples: provide power to meet base load, demand
management, stand-by, back-up, others (please describe):

YES
One-line diagram attached? _____ Yes

YES Yes (Note that answer


Has the Manufacturer supplied its dynamic modelling values to the DU? _____
here requires “Yes” for complete application. For Pre-certified Equipment, answer is Yes.)

YES
Layout sketch showing lockable, “visible” disconnect device. _______ Yes

Company ---------------------------------------------------------- Customer Name


Wextrends ICT & Solar Solutions OPC (Customer Name)
By: _____________________________ By: _____________________________

Title: _____________________________ Title: _____________________________


05/04/2023
Date: _____________________________ Date: _____________________________

You might also like