You are on page 1of 10

Structural Engineering International

ISSN: 1016-8664 (Print) 1683-0350 (Online) Journal homepage: https://www.tandfonline.com/loi/tsei20

Wide Cable-supported Bridges for Rail-cum-road


Traffic

Yingliang Wang & Reiner Saul

To cite this article: Yingliang Wang & Reiner Saul (2020): Wide Cable-supported Bridges for Rail-
cum-road Traffic, Structural Engineering International

To link to this article: https://doi.org/10.1080/10168664.2020.1735980

Published online: 04 May 2020.

Submit your article to this journal

View related articles

View Crossmark data

Full Terms & Conditions of access and use can be found at


https://www.tandfonline.com/action/journalInformation?journalCode=tsei20
Wide Cable-supported Bridges for Rail-cum-road Traffic
Yingliang Wang, Dr, Deputy Chief Engineer, China Railway ERYUAN Engineering Group Co. Ltd, Chengdu, People’s Republic of
China; Reiner Saul, Dipl.- Ing. Dr- Ing E.h., Senior Consultant, Former Managing Director of Leonhardt, Andrä und Partner, Stuttgart,
Germany. Contact: yingliangwangcd@aliyun.com.
DOI: 10.1080/10168664.2020.1735980

Abstract Compared with the two-level arrange-


ment, the authors find that the one-
This paper reviews and describes experiences and the state-of-art of cable- level arrangement has the following
supported rail-cum-road bridges with box girder. The application range of wide advantages:
single box girder, vented box girders with two and three separated boxes is
analyzed from the point of view of structural behavior, fabrication,
transportation, installation depending upon the number of tracks, road lanes (1) The top elevation of the road is
and different transversal locations of the pylon legs. Future trends of these reduced by about 10–15 m, so the
bridges for multiple railway tracks and road lanes are discussed. A cable- total length of the corresponding
stayed bridge with a main span of 520 m and three-separated-box-girder with approach bridges is remarkably
different arrangements of the cable planes has been analyzed in a little more reduced. Another disadvantage
detail. The results reveal that the three-separated-box-girder is an effective of the two-level superstructure is
solution for long span cable-supported bridges with multiple railway tracks and that it is necessary to arrange a
road lanes. transition zone where the traffic
on either the upper level or the
Keywords: Cable-supported bridges; rail-cum-road bridges; truss girder; single
lower level is shifted transversely
box girder; separated-box-girder
to separate the alignments and
allow the traffic on both levels to
Introduction —of course- as a minimum be able reach the ground.2
to span between these points. (2) In general, the steel quantity of a
Cable-stayed bridges are very suitable Action 3: distribute concentrated box girder is smaller than that of
for long span rail-cum-road bridges loads. The deck’s ability to distribute a truss girder. The main girder of
with heavy train load. According to concentrated train loads is utilized in cable-stayed bridges with multi-
the relative location of the railway order to distribute these loads over cable system has to resist big
tracks and the road lanes, the bridges several stay cables. axial forces and small bending
can be divided into two-level and moments. The advantage of a
single-level structures. The two-level steel truss girder, instead, is its
The limitation of the maximum slope,
bridges generally use truss girders, in higher depth and its higher
deflection and rotation is stricter for
which the railway is located on the capacity to resist big moments.
bridges carrying railways than road
bottom level and the road on the top The box girder is composed by stif-
lanes only. In particular, the differen-
level. Very exceptionally, the railway fened plates, whose capacity to
tial angular rotations under traffic
is on the top level and the road on the resist axial forces is much bigger
loads at the expansion joints between
bottom level due to different slopes of than that of a steel truss girder.
adjacent girders need special attention.
the road and the railway, especially if (3) The steel box girder is easy for
Furthermore, the loads in the longi-
the elevation is controlled by the site maintenance, and the maintenance
tudinal direction of the bridge due to
topography or the adjacent elevation cost is, hence, much lower than
braking and accelerating trains are
of railway stations and yards. The that of a steel truss girder.
significant.
single-level bridges often uses box Chinese bridge engineers have
girders with various cable planes. The global vertical stiffness of CSBs learned lessons from double deck
with multi-cable system is mainly rail-cum-road bridges with steel
The action of the main girder of cable-
determined by the total load and the truss girder as the retrofitting of
stayed bridges (CSBs) with multi-cable
general arrangement. The contribution the upper level for the carriage-
system can be divided into1:
of the stiffness of the main girder is ways may not interrupt the oper-
small, especially for main spans larger ation of the railway on the
Action 1: absorb the normal forces ori- than 300 m. The traditional limitation bottom level, so the construction
ginated by the inclined cables. of the vertical deformation is replaced time had to be very short and
Action 2: carry the load locally by the maximum gradient slope under a shield had to be added along
between the cable anchor points. the traffic load. The end rotation the clearance of the railway. The
The contribution of the main girder angle of the main girder at the expan- retrofitting cost was, hence, very
in the transfer of vertical loads sion joint can be limited by piers in high.3
depends on the overall structural the side spans or by smaller cable (4) The depth of a box girder is lower
system. In principle, as the deck is spacing near the expansion joint. The than that of steel truss girder, so
subjected directly to the traffic load multi-cable system and piers in the the bridge looks very slim and
and its own weight, but only sup- side spans make cable-stayed bridges elegant.
ported by the cable system at the with box girders feasible for heavy (5) The width of a box girder is larger
cable anchor points, the deck must live loads and high speed railways. than that of a truss with the same

Structural Engineering International 2020 Scientific Paper 1


(a) track and multi–lane are needed, so
the bridges become wider and wider.
The cross section of box girders may
use a single box or two coherent
boxes or vented (slotted) girders with
two or three boxes, and associated
anchorages of the stay-cables to the
box girders.
The cross section of the box girders is
(b) mainly controlled by following factors:

(1) the capacity of the fabrication yard


(2) the transportation condition from
the fabrication yard to the con-
struction site
(3) the transportation condition at the
construction site, including the
main span and side spans.
(4) the transversal location of the
main girder and the pylon leg
Fig. 1: Overall layout of a multi-cable bridge with different girders (a) box girder (b) truss
girder (Units: m)
which may be located outside or
inside the box girder.

number of tracks and road lanes, dominate the total bridge, so the Three box girder types may be used:
so its transversal stiffness is much two-level arrangement with truss
bigger. This enhances the lateral girder is more suitable. (1) a single-cell box girder or two
stability of high speed trains and coherent cells
the comfort for passengers (2) two-separated-box-girder
significantly. The first CSBs with box girders for (3) three-separated-box-girder
(6) The cable spacing of a box girder is road and full railway traffic are the
easier to reduce at the side spans two Zárate-Brazo Largo Bridges in
than that of a truss girder as the Argentina which were opened to
panel length of steel trusses is diffi- traffic in 1978.4 The railway and the Single Box Girders or Two
cult to change, so the total length road are on the same level (Fig. 2). Adjacent Boxes
of and the total cost of the box These two identical bridges with main
girder option is often shorter and spans of 330 m carry four lanes of In general, if the total width of the
lower than that of truss girder roadway traffic and a single railway girder is less than 40 m and the con-
(Fig. 1). track across two branches of the dition of fabrication and transportation
Paraná River. Another rather early is good, a single box girder with multi-
example is the Kap Shui Mun Brige cell is convenient.
The disadvantages of one-level rail- in Hongkong, China, a double deck
cum-road Cable-stayed bridges are The longest span bridge with a single
bridge with 2 lanes for suburban
listed in the following: streamlined box girder and multi-
trains and emergency lanes on the
cells is the Third Bosporus Bridge in
lower deck and 2 × 3 lanes on the
Istanbul, Turkey, opened to traffic in
(1) If the railway tracks are located in upper deck.5
the middle and the road lanes are 2016.6 It is a high rigidity suspension
located at the both sides, the land With the rapid development of the bridge reinforced by stay-cables with
acquisition is more than that of infrastructure, bridges with multi- a span of 1408 m. It carries two
two-level rail-cum-road Cable-
stayed bridges with truss girder.
(2) If side-span piers cannot be
adopted, the global stiffness is a
little bit weaker than that of two-
level arrangement with truss
girder.
(3) Sometimes, the approach bridge
will also play more important role
than that of the main bridge. If
the spans of the approach bridge
are larger than 120 m, the two-
level arrangement with truss
girder is more suitable for the
approach bridge. If the total
length of the main bridge is Fig. 2: Cross- sections of the Zárate-Brazo Largo Bridges across the Paraná/ Argentina4 (a)
shorter, the approach bridge will standard section (b) section with cable anchorage (Units: mm)

2 Scientific Paper Structural Engineering International 2020


If the width of a bridge deck is larger
than 40 m, it is very difficult to fabri-
cate and transport the entire section.
If the box girders cannot be trans-
ported to the side spans by ship they
were often constructed on trestles or
by incremental launching.
If a concrete box girder is used for the
side spans with a width larger than
45.0 m, the construction is very diffi-
cult. The typical example is the Third
Bosporus Bridge, whose PC box
girder of the side spans were cast in
situ on trestles. The construction is
even more difficult if the box girder is
wider than 45 m or/and the false work
is higher than 30 m.
If the bridge deck of the side span is
designed as a single steel box girder
as that of the main span and the trans-
Fig. 3: Cross- sections of the Third Bosporus Bridge (a) main span (b) side spans (Units: m) portation condition of the side spans is
(courtesy of T Engineering) very difficult, the incremental launch-
ing method may be used as for the
Lingang Yangtze River Bridge,
Yibing, China.
Another important factor which influ-
ences the cross section of the bridge
deck is the transverse location of the
pylon legs. Basically there are two
possibilities:
(1) The pylon legs are located outside
the box girder (Fig. 5).
When the pylon legs are located
outside the single box girder, the total
Fig. 4: Cross section of the Lingang Yangtze River Bridge in Ybing/China (Units: mm) width of the main girder is reduced
no matter whether the anchorage of
the cables is located inside or outside
tracks of heavy railway and eight railway and 8 road lanes, resulting in a
the box girder. The connection
lanes, resulting in a total width of total width of 63.9 m (Fig. 4). The
between the pylon legs and the main
58.5 m (Fig. 3). width of the box girder is the world
girder can be fixed, free or by
record for a rail-cum-road bridge with
Another typical example is the Lingang dampers in the longitudinal direction,
a single box.
Yangtze River Bridge in Yibing, China. which can be used for any kind of
It is a cable-stayed bridge with two Some more bridges with single box cable-stayed bridge, such as single
pylons and spans of 72.5 + 203 + 522 + girders or two coherent box girders pylon, double pylon or multi pylon.
203 + 72.5 m. The main girder wider than 40 m have been built world- But if the main span is small and,
accommodates 4 tracks of high speed wide (Table 1). hence, the height of the pylon above

Bridge Completed year Country Main span (m) Width of girder (m) Tracks Lanes
Mannheim- Ludwigshafen Bridge 1972 Germany 287 36.9–51.9 2 4–8
South bridge 1991 Ukraine 271 41.5 2 6
Sava bridge, Belgrade 2012 Serbia 376 45.0 2 8
3th Bosporus Bridge 2016 Turkey 1408 58.5 2 8
Dongping Channel Bridge 2018 China 260 46.5 2 6
4th Tuo River Bridge 2018 China 200 49.0 2 6
Lingang Yangtze River Bridge 2021 China 522 63.8 4 6
Table 1: Cable- stayed rail-cum-road bridges with a single or two coherent box girders

Structural Engineering International 2020 Scientific Paper 3


Bridge in Belgrade.7 Sometimes the If the pylon leg is located inside the box
pylon leg and the main girder are con- girder, three options may be used:
nected monolithically and directly sup-
ported on the pier by bearings, as at the (1) Slot in the box girder, the pylon is
Oberkasseler Bridge in Düsseldorf/ supported on or fixed to the pier
Germany8 and the South bridge in (2) The pylon leg and the box girder
Kyiv/Ukraine.9 These bridges look are connected monolithically and
very slim and elegant because the supported on the pier by bearings
pylon leg runs through the wide box (3) Separated-box-girder with two or
girder. three boxes

Fig. 5: Pylon legs outside the box girder Option (1) is very rare in the practical
(Units: m) Separated-box-girder design due to the poor structural behav-
ior of the main girder; option (2) is often
General used for single pylon cable-stayed
the deck is small, it looks stumpy and If the width of the single box girder bridges, medium spans with two
less elegant. would be wider than about 40 m, it pylons and multi-pylon cable-stayed
becomes more difficult for fabrication bridges and option (3) is suitable for
(1) The pylon legs are located inside any kind of cable-stayed bridge. The
the box girder (Fig. 6). and transportation than separated-
box-girder. If the main span of the separated-box-girder is connected by
If the pylon legs are located inside the bridge is larger than 1600 m and the cross beams. The spacing of the cross
box girder, the additional width of the wind speed is higher, the separated- beam is basically determined by the
girder required for them will also be box-girder may also be used to cable spacing at the girder.
used for the cable anchorage. This sol- enhance the critical wind speed of Compared with the single box girder,
ution is very suitable for single pylon flutter. Cable-stayed bridges (CSB) as the separated-box-girder solution has
cable-stayed bridges if the pylon leg, well as suspension bridges (SB) may the following advantages:
the main girder and the pier are con- have bridge decks with separated-
nected monolithically as at the Ada box-girder (Table 2).
(1) The smaller box girders can be
easier fabricated, transported and
installed individually and con-
nected by cross beams at the con-
struction site.
(2) The pylon leg runs through the gap
between the separate girders, so
the bridge looks very slim and
elegant.
(3) The three-separated-box-girder
solution is very suitable for multi-
track railway and multi-lane road.
(4) The critical flutter wind speed of
separated-box-girder is often
much higher than that of single
box girder, so it is more suitable
for very long span cable-supported
bridges.

One major weakness of separated-box-


girder is their sensitiveness to vortex
Fig. 6: Pylon legs inside the box girder of the South Bridge in Kyiv9 (Units: m) (courtesy of induced vibrations, so the distance
Dr. Korniiev) between the box girders should be

Completed Bridge Main span Girder width Carriage Nos of Nos of


Bridge year type (m) (m) Tracks lanes boxes pylons
Kai-Shui Mun 1997 CSB 430 35.5 2 6+2 2 2
Bridge
New Champlain 2019 CSB 240 59.7 2 10 3 1
Bridge
Danjiang Bridge 2022 CSB 450 45–69 2 6 2 1
Messina Bridge Unknown SB 3300 61.5 2 4 3 2
Table 2: Cable-supported rail-cum-road bridges with separated-box-girder

4 Scientific Paper Structural Engineering International 2020


determined with consideration of this but the curve in the plan is, of course, and the railway can use a steel-con-
vibration, or other devices should be not suitable for high speed trains. crete composite deck or a steel
used to mitigate the regular vortex- orthotropic deck, respectively. For
A typical example of solution (b) is the
shedding. the road deck, the concrete slab
Ruyi Sea Crossing Bridge, China.
deck is cheaper than a steel ortho-
Two-separated-box-girder An early example for pylons of solution tropic deck and the pavement on
(c) is the Mannheim-Ludwigshafen the concrete deck is more durable
If the girder is not too wide, two-separ- Bridge across the Rhine river, opened than on a steel orthotropic deck.
ated-box-girder connected by cross to traffic in 1972.10 It is a single pylon The steel orthotropic deck is not
beams is an ideal cross section. The cable-stayed bridge with spans of very sensitive to the train load due
transverse location of the tracks and 287.4 + 60.16 + 65 m and a cantilever of to the distribution of sleepers and
lanes are also influenced by the 21.25 m. It carries two lanes of light the ballast. So the economy and
number of pylon legs and their relative railway traffic and four to six road durability are enhanced greatly.
location (Fig. 7). lanes. It was worldwide the first mayor (2) If the transportation condition of
bridge with a main span from steel the yard or/and the site is not suit-
(a) One central pylon is between the and side spans from pre-stressed con- able for one big segment, the
box girders, and the railway crete. This kind of cross-section has three-separated-box-girder can be
tracks and lanes of each direction not been used in a very wide bridge divided for fabrication, transpor-
are located outside the pylon yet, but the authors believe that it is a tation, installation and are then con-
(b) Two pylon legs are located outside good solution for appropriate construc- nected by cross beams. They can
of the box girders, tracks and lanes tion conditions, especially for doublet also be fabricated, transported and
are located between the pylon legs tracks railway and multi lanes road installed by one big segment when
(c) Two pylon legs run between the traffic. Another advantage of this kind the site condition is very favorable.
box girders, the railway tracks of cross section is the central trough (3) The railway and the road are separ-
are located between the pylon and railway tracks can be added in the ated physically by the gap and the
legs and the lanes are located second stage easily. cross beams. The boundary of
outside. inspection, maintenance work and
cost between the owner of the
In solution (a) and (c), the two side Three-separated-box-girder railway and the road is clearer
boxes are connected by cross beams than for other cross sections, such
Three-separated-box-girder is an effec-
only. as truss, single box girder and two-
tive solution for a major number of
A typical example of solution (a) is the tracks and lanes, especially for super- separated-box-girder.
Danjiang Bridge in Taiwan, a single long span cable-supported bridges. (4) Due to the two gaps between the
pylon cable-stayed bridge with a main The railway and the road are located three box girders, the freedom of
span of 450 m. The railway on this on the middle box girder and the side pylon design is big and very suit-
bridge is a light railway, so the align- box girders, respectively. Compared able for two pylon legs running
ments of tracks and lanes are curved with the two-separated-box-girder between the box girders and for
on the main bridge and the length of option, three-separated-box-girder four pylon legs, with two legs
each cross beam is variable. The steel has the following advantages: running between the box girders
quantity of the main girder is reduced and two other legs located outside
and the appearance for drivers and (1) The road and railway are located the box. The transversal behavior
passengers is playful and interesting, on separate box girders, the road of the pylon is ensured by reason-
able structural forms. These
bridges look slim and elegant
(a) (b) even for small or medium spans.
(5) The option with three-separated-
box-girder is wider than two-sep-
arated-box-girder with the same
number of tracks and road lanes,
so its transversal stiffness is bigger.
So far only one CSB has used the
three-separated-box-girder solution:
(c) the New Champlain Bridge in Mon-
treal/Canada,11 a single pylon cable-
stayed bridge with spans of 80.4 + 124
+ 240 + 84.4 m, which has been com-
pleted this year (Figs. 8 and 9).
The Messina Bridge12 is a rail-cum-road
suspension bridge with a main span of
3300 m, whose main girder has three-
separated-box-girder with a total width
Fig. 7: Cross-sections with two separate box- girders (a) central pylon between the boxes (b) of 61.15 m. The final design was com-
pylon legs located outside the bridge deck (c) two pylon legs in between the box girders pleted several years ago, but the con-
(Units: m) struction has not started yet.

Structural Engineering International 2020 Scientific Paper 5


(a) (a) Two cable planes with twin cables
(Fig. 12a)
The cables are anchored at the cross
beams between the central girder and
the lateral girders. The cable forces are
transferred to the three box girders by
shear, bending and torsion of the cross
beams, so their section is a closed box
(b) and more steel than for the other
options is needed. The spacing of these
cross beams is equal to that of stay
cables. The proper horizontal location
of the cable anchorages on the cross
beam depends upon the ratio of the
cross sectional areas of one side box to
half of the central box girder and can
be determined by the following approxi-
mate calculation. With the areas of each
Fig. 8: Cross- sections of the New Champlain Bridge in Montreal/Canada (a) without cable side girder and the central girder As and
anchorage and steel crossbeam (b) with cable anchorage and steel crossbeam (Units: m) Am, respectively, the effective Young’s
moduli Es and Em, the distance
between the center of the side and
and three-separated-box-girder with a
central girder L and the distance from
depth of 5.0 m (Fig. 11). The central
the cable anchorage to the outside web
box girder and the side box girders
of central girder a (Fig. 13) and assum-
are connected by cross beams with a
ing that the cross beam is simply sup-
standard spacing of 12.0 m. The gaps
ported on the side and central girder,
between the box girders are 6.2 m at
the axial force in the side and central
the top flange. The two pylons legs
girder may be calculated as follows
run through these gaps.

a L−a
DFs = Fch DFm = Fch (1)
Cable Plane Options and L L
Associated Cable Anchorages
in which Fch is the horizontal component of
In general, there are three different
Fig. 9: Main girder of the New Champlain the cable force.
types of cable planes and associated
Bridge (courtesy of SSLC) anchorages on the three-separated- The ideal conditional is that the axial
box-girder, (Fig. 12). strain of the side girders and the
Case Study of a Cable-stayed
Bridge with 4 Tracks of High
Speed Railway and a Dual 3
Lanes Carriageway
General Layout and Cross- Section
of the Bridge Deck
A CSB with spans of 70.5 + 203 + 520 +
203 + 70.5 m was studied (Fig.10).
The bridge accommodates, besides the 4
tracks and 6 lanes, cycling and footpaths.
The total width of 63.4 m consists of
Fig. 10: General layout of the bridge (Units: m)
. the cycling track, footpath and 3
lanes in each direction with a width
of about 17.25 m
. the 4 tracks high speed railway with
about 24.9 m.
. the cable anchorage area on each
side with about 2.0 m,

Two options of the main girder were


studied in the preliminary design: a Fig. 11: Cross- section of the bridge deck with cable anchorage and crossbeam (left) and
single box girder as shown in Fig. 4 without cable anchorage and crossbeam (right) (Units: mm)

6 Scientific Paper Structural Engineering International 2020


Fig. 14: Visualization of Fig. 12b

beams are much smaller than for sol-


ution (a). The spacing of the cross
beams can be the double or the triple
of the spacing of the stay-cables. If the
spacing of the cross beams equals to
that of the stay cables, most of the
cross beams can use an open cross
section what will reduce the difficulty
of fabrication, site installation and site
connection significantly. The road
girder is in the transverse direction still
on a cantilever.
(c) Four cable planes (Fig. 12c)
Fig. 12: Alternatives of cable anchoring for a section with three-separated-box-girder (Units: mm) The two outer stay-cables are anchored
at the outer web of the side girders and
the two inner cables at the webs of the
central girder. The side girders are no
longer on a cantilever but are continu-
ously and directly supported by the
outer stay cables. So the internal
forces of the cross beams are reduced
greatly and so is the associated
steel quantity. Combined with the
diamond pylon or the invert “Y”
pylon, the torsional stiffness of four
cable planes is much bigger than that
of two cable planes or quasi-four
cable planes. Therefore the elevation
difference of adjacent rails under
eccentric traffic loads will be reduced
greatly (Table 3) and (Figs. 15 and 16).
The transverse inclination under
eccentric traffic loads and, hence, the
Fig. 13: Plan view of the cable anchorage at the cross beams difference of deformation between two
rails is for 4 cable planes reduced by
about 50% compared to the other two
central girder induced by the horizon- (b) Quasi four cable planes (Fig. 12b options, so it is very suitable for trains
tal component of the cable force are and Fig. 14) with a design speed in excess of
equal, so 200 kmph without compromising the
The outer cable is anchored at the inner safety and the comfort for the passengers.
DFs DFm web of the side girder and the inner
= (2) cable at the outer web of the central
Es × As Em (Am /2) Options for the Side Spans
girder. The cable anchorages can be sup-
ported by brackets on the webs of the If two cable planes or quasi-four cable
Substituting (1) into (2), we can get: box girders or by cross beams directly. planes are adopted, a pre-stressed con-
Cable forces are transferred to the box crete box girder is very difficult
2Es × As girders mainly by the associated web, because the road box girder is on a can-
a= L (3)
Em × Am + 2Es × As so the internal forces in the cross tilever in the transverse direction what

Structural Engineering International 2020 Scientific Paper 7


Quasi-four cable
Items Two cable planes planes Four cable planes
Bridge width (m) 72.0 72.0 73.0
Steel quantity of cross beams (t/m) 6.25 4.1 3.0
Most unfavorable elevation difference of adjacent rails at 10.2 9.5 4.6
middle span(mm)
Structural behavior of the cross beam Simply supported Simply supported Three span
girder with cantilever girder with cantilever continuous girder
Maximum derailment coefficient* (the ratio of the lateral to 0.1537 0.1537 0.1537
the vertical force of a wheel. It should be limited as follows: Y/
P < 0.8 in which Y and P are the dynamic lateral and vertical
wheel force on the rail, respectively)
Maximum overturn coefficient* (ΔP/P < 0.9 in which ΔP is the 0.1638 0.1637 0.1637
difference between the dynamic and the static vertical wheel
load and P is the static vertical wheel load)
Maximum vertical acceleration*(m/s2) 0.823 0.823 0.822
Maximum horizontal acceleration of the train* (m/s2) 0.617 0.617 0.617
Maximum rotation angle* (Rad) 1.776E-4 1.767E-4 1.333E-4
Appearance better good good
*Only one passenger train on the bridge.

Table 3: Comparison of the three cable plane options

permanent and temporary piers with


spacing of about 60 m. The three steel
box girders of this side span are fabri-
cated and transported to the site separ-
ately. Their installation is divided into
three major steps (Fig. 17):

Fig. 15: Traffic load arrangement for the maximum elevation difference of adjacent rails
(Units: m) (a) The central box girder with part of
the cross beams is incrementally
launched into its final position.
causes difficulties in the design of the and the north side span can be con- (b) Temporary tracks and moveable
cross beams. Four cable planes, instead, structed by the free cantilevering cranes are installed on the com-
are suitable for pre-stressed concrete method as these segments can be trans- pleted central box girder. The seg-
box girders because the cross girder is ported beneath their final position by ments of the two side box girders
a three span continuous beam supported ship at flood season. The south side and the rest of the cross beams
by the four stay cable planes. span is located on the bank of the are lifted near the pylon and trans-
river, and the topography is much ported along the completed
undulated, so that the segments central (railway) girder by a
Construction of the Three-separated- cannot be transported beneath their moveable crane.
box-girder in the South Side Span final position. The girder of this side (c) The two lateral box girders and
The segments of the three-separated- span is therefore constructed by incre- the rest of the cross beams are
box-girder solution of the main span mental launching and supported by lifted to their final elevation and
the cross beams are connected
after they arrived at their final
position by welding at a zero
stress state as the weld is located
at the end of the cantilever of the
cross beam.

After the side span is installed and still


supported by permanent and tempor-
ary piers, the segments of the central
Fig. 16: Exaggerated rotation due to eccentric traffic load for cable anchorage according to span are installed by the free cantile-
Fig. 12a vering construction method.

8 Scientific Paper Structural Engineering International 2020


(a) (b) (c) [3] Wei X, li-xia B, Hua L. Retrofitting design of
roadway bridge of main bridge of Jiujiang
Changjiang river bridge. Bridge Constr. 2017;
47(1). (In Chinese)
[4] Leonhardt F, Zellner W, Saul R. Zwei
Schrägkabelbrücken für Eisenbahn- und
Straßenverkehr über den Rio Paraná /
Argentinien (Two cable- stayed bridges for
railway and highway traffic across the Paraná
River in Argentina). Stahlbau 1979; 48: 225–236
and 272–277.
[5] Saul R, Hopf S. Die Kap-Shui-Mun-Brücke
in Hongkong - eine zweistöckige
Schrägkabelbrücke für Straßen- und
Eisenbahnverkehr (The Kap-Shui-Mun- Bridge
at Hongkong- a double deck cable-stayed
bridge for road and railway traffic). Beton- und
Stahlbetonbau 1997; 92: 261–265 and 308–312.
Fig. 17: Construction sequence of the main girders of the south side span (a) launching of the [6] Klein J- F. Third Bosporus bridge- A master-
central box girder (b) lifting of the lateral parts (c) connection of the lateral parts to the piece of sculptural engineering. Stahlbau 2017;
central box girder 86: 160–166.
[7] Romberg M, Hopf S, Steinkühler M.
Design& construction of the bridge over the
Conclusions steel orthotropic, respectively. The
Sava River at Ada Cinganlija in Belgrade. 35th
economy and durability is enhanced. Annual Symposium of IABSE, London,
In general, if the total width is larger The railway and the road are separated September, 2011
than 40.0 m and the critical flutter physically by the gap and the cross
wind speed is not the controlling [8] Beyer E. et al. Neubau und Querverschub
beams. The boundary of maintenance der Rheinbrücke Düsseldorf-Oberkassel (New
factor of the design, the cross section work and cost between the owner of construction and lateral shifting of the bridge
of the main girder should be deter- the railway and the road is very clear. across the Rhein at Düsseldorf- Oberkassel).
mined by the detailed comparison of CSBs with three-separated-box-girder Der Stahlbau 1977; 46: 65–80, 113–120, 148–154
single box girder and separated-box- can achieve significantly long spans and 176–188.
girder. If the main span is larger than without compromising safety and [9] Korniyiv MH, Fuks GB. The South Bridge,
1600 m and the critical flutter wind comfort for the passengers. Kyiv, Ukraine. Struct Eng Int 1994; 4: 223–225.
speed is the controlling factor of the
[10] Volke E, Rademacher C-H. Die
design, separated-box-girder is an Strombrücke im Zuge der Nordbrücke
effective solution. For high speed rail- Acknowledgments
Mannheim- Ludwigshafen - Kurt-Schumacher-
cum-road bridges with multi-track The authors would like to thank all suppli- Brücke (The main bridge across the Rhine river
and multi-lane, three-separated-box- ers of the photographs used in the paper. as part of the Northbridge Mannheim-
girder with a multi stay-cable system Ludwigshafen – Kurt- Schumacher Bridge. Der
is a very good solution. As the road Stahlbau 1973; 42: 97–105. 138–152 and 161–172.
and the railway are separated by the References [11] Nader M, McGain Z, Demirdjian S,
cross beams, the lateral wind forces [1] Gimsing NJ, Georgakis CT. Cable Supported Rogerson J. Design and construction of the new
induced by the high speed train onto Bridges: Concept and Design, 3rd edn, John Champlain bridge, Montreal, Canada. Struct
Eng Int. 2017; 27(1): 38–43.
the road traffic are very small and Wiley &Sons Ltd.: London, 2012.
wind screens can be omitted. The [2] Vejrum T, Gimsing J. Long span cable-stayed [12] Brancaleoni F, et al. The Messina Strait
decks for the road and the railway bridges for Railway, Strait Crossings, Bergen, Bridge: A Challenge and a Dream. CRC Press:
can be steel-concrete composite and Norway, 16–19. June, 2013. Rotterdam, 2009. ISBN: 978-0-415-46814-5

Structural Engineering International 2020 Scientific Paper 9

You might also like