You are on page 1of 1

PRM360 Deliverables - 1

Deliverables Document for the first invoice period

Architecture Document:
Based on the Standalone solution Flowchart shared by PRM360 ( link ),
we provided an architecture document ( link ) which outlines the personas, sev-
eral systems involved and the necessary services that needs to be implemented.
This architecture document and service identification was refined in several
meetings with Nitesh.

Tech Stack Finalisation:


Based on the Architecture document, we finalised the tech stack ( link )
needed for the solution after weighing pros and cons of several frameworks.

Architecture Requirements and their solutions:


As per the requirements shared by PRM360 at the start of our conversa-
tion and after several Q&A based on this ( link ), we submitted a detailed solu-
tion document ( link ) for each of the architecture requirement raised.

You might also like