Professional Documents
Culture Documents
NO
NO ACCESS ACCESS
WAIT FOR
PLASTERIN GIRT COMPLETED HAND OVER
G
Girt installing
inspection on 16/Apr
GIRT
INSTALLING
INSPECTION
Girt installing 11/Apr
inspection on 15/Apr GIRT
INSTALLING
INSPECTION
13/Apr
ELEVATION G.L D6
Girt
SCAFFOLDING TO CLOSE complet WAIT FOR
e hand
Girt complete hand over on 12/Apr Girt complete hand over on 14/Apr SCAFFOLDING
TO WALL
over on
Girt complete
hand over on
GIRT COMPLETED HAND OVER WAIT FOR PLASTERING WAIT FOR
AND SHORT RC. CONFIRM DESIGN
15/Apr
PEDESTAL
WAIT FOR
CONFIRM
Girt complete DESIGN
WAIT FOR SHORT RC. WAIT FOR
hand over on GIRT COMPLETED HAND OVER PEDESTAL AND WAIT CONFIRM DESIGN
13/Apr FOR RC COLUMN
ELEVATION G.L D1
Wait for scaffolding
Wait for scaffolding
Wait for scaffolding repair installation
installation
ELEVATION G.L AB
ELEVATION G.L AR
No Scaffolding No Scaffolding
No plastering No plastering
ELEVATION G.L AQ
ROOF PLAN