MAPING GIRT AND ROOF MEMBER INSTALLATION

PROJECT: LOGOS 04 WAREHOUSE


CONTRACTOR: PT. BMB
Updae: 11.04.2023 (09 am)

NO
NO ACCESS ACCESS
WAIT FOR
PLASTERIN GIRT COMPLETED HAND OVER
G
Girt installing
inspection on 16/Apr
GIRT
INSTALLING
INSPECTION
Girt installing 11/Apr
inspection on 15/Apr GIRT
INSTALLING
INSPECTION
13/Apr

ELEVATION G.L D6

WAIT FOR PEDESTAL

Girt
SCAFFOLDING TO CLOSE complet WAIT FOR
e hand
Girt complete hand over on 12/Apr Girt complete hand over on 14/Apr SCAFFOLDING
TO WALL
over on

Girt complete
hand over on
GIRT COMPLETED HAND OVER WAIT FOR PLASTERING WAIT FOR
AND SHORT RC. CONFIRM DESIGN
15/Apr
PEDESTAL
WAIT FOR
CONFIRM
Girt complete DESIGN
WAIT FOR SHORT RC. WAIT FOR
hand over on GIRT COMPLETED HAND OVER PEDESTAL AND WAIT CONFIRM DESIGN
13/Apr FOR RC COLUMN

ELEVATION G.L D1
Wait for scaffolding
Wait for scaffolding
Wait for scaffolding repair installation
installation

Wait for scaffolding Girt complete hand over on 14/Apr


installation
Girt complete hand
over on 11/Apr

GIRT COMPLETED HAND OVER

ELEVATION G.L AB

GIRT INSTALLING (PARAPET TOO LOW 10 cm)

Girt complete Girt complete


hand over on Girt complete hand over on 15/Apr hand over on
28/Apr 13/Apr

ELEVATION G.L AR
No Scaffolding No Scaffolding
No plastering No plastering

No Scaffolding Girt complete hand


No plastering over on 18/Apr

No Scaffolding Wait for plastering


No plastering

ELEVATION G.L AQ

COMPLETE HAND OVER