REV 0

PRPD
PWHT REQUIREMENT CHKD
UW-2, UCS-56, UCS-68 APPD
POST WELD HEAT TREATMENT IS REQUIRED WHEN ANY OF FOLLOWING CONDITION EXIST:

SR NO. APPLICABLE DESCRIPTION APPLICABLE REMARKS


CLAUSE
1 UW 2 (a) LETHAL SERVICE NO
UNFIRED STEAM BOILER WITH DESIGN
2 UW 2(c) NO
PRESSURE EXCEEDING 0.345 Mpa

IF MDMT IS COLDER THAN -48°C AND THE


3 UCS-68(b) COINCIDENT RATIO DEFINED IN FIG UCS-66.1 IS NO
0.35 OR GREATER

MATERIAL OVER 32 mm NOMINAL THICKNESS


4 UCS-56 NO
AS DEFINED IN UW-40(f)
5 - IS PWHT CLIENT'S SERVICE REQUIREMENT? NO

POST WELD HEAT TREATMENT IS NOT REQUIRED