UPGRADING SLUDGE TREATMENT FACILITY

PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED


WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

ELECTRICAL PLANT AND ASSOCIATED


EQUIPMENT

Supply, handle and deliver to site including taxes at


site, duties, insurance, freight loading and storing
complete erection and installation, painting, site
testing, setting to work and attendance during the
running and maintenance period of all plant and
equipment supplied as specified.

MOTOR CONTROL CENTER (MCC) AND


EQUIPMENT
A 400V, 400A, IP54 New MCC-STF2 located at the L.S.
existing pump house of Wash Water Recovery Tank,
floor standing metal cubicle type with type-tested
certification as specified. The MCC shall comprise
the following item as specified in the drawing no.
HLA18/9488/STF-P2/NANAS/E/01
- Main incoming MCCB
- Outgoing MCCB's complete with all fuses
- Current Transformer (CT)
- Overcurrent and earth fault (OCEF)
protection relays (IDMT)
- Indicating and recording instruments.
- Metering and measuring equipments
- VSD and DOL starters for equipments as specified
complete with all necessary power and control cabling.
- ELCB or Earth Leakage relay for equipment protection
complete with necessary internal wiring works.
- Overloading protection relay for equipments
- Indicating lights, push buttons, panel heaters,
exhaust fans, and etc.
- Internal earthing system complete with wiring.
- Complete internal power / signal / control
wiring in the panel.
- Necessary pumps and motors overload,
protective and control relays, timer and etc.
- M.S channel support with suitable size to mount
MCC on the floor. The support shall be galvanised type.
Provision connection to control/ Supervisory panel
shall be made available into this panel. Rate shall
also to include obtaining calibration certificate for
protection relays and to be endorsed by the qualified
service engineer.
Carried To Collection

BQ-B5/1 (Add 1)
UPGRADING SLUDGE TREATMENT FACILITY
PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED
WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

LOW VOLTAGE CABLING WORKS

A Submain cabling from existing MSB-N to new m 85


MCC-STF2 using 1 x 150mm sq. 4 core XLPE/
SWA/PVC complete with all control cables as specified
to be laid underground and partially in trench. Rate to
include excavataion and backfilling works, hot dip
galvanised cable tray, cable glands, cable markers,
cable ties, fixing accessories, etc. and termination
works to the boards as specified.

SUBMAIN CABLING WORKS FOR


MCC-STF2

To following equipment Junction Box using 1 x 25mm


sq. 4 core (Cu.) PVC/SWA/ PVC complete with all
control cables as specified to be laid underground and
partially on tray. Rate to include, excavation and
backfilling works, hot dip galvanised cable tray, cable
ties, cable glands, cable markers, emergency push
button with wiring to MCC, fixing accessories, etc.
and termination works to the panels and junction
boxes as specified:

B Existing Sludge Lifting Pump No.1 m 45


(Sludge Holding Tank)

C Existing Sludge Lifting Pump No.2 m 50


(Sludge Holding Tank)

D Existing Sludge Lifting Pump No.1a m 25


(WWR Tank 1)

E Existing Sludge Lifting Pump No.1b m 27


(WWR Tank 1)

Carried To Collection

BQ-B5/2 (Add 1)
UPGRADING SLUDGE TREATMENT FACILITY
PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED
WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

SUBMAIN CABLING WORKS FOR


MCC-STF2 (CONT'D)

To following equipment Junction Box using 1 x 25mm


sq. 4 core (Cu.) PVC/SWA/ PVC complete with all
control cables as specified to be laid underground and
partially on tray. Rate to include, excavation and
backfilling works, hot dip galvanised cable tray, cable
ties, cable glands, cable markers, emergency push
button with wiring to MCC, fixing accessories, etc.
and termination works to the panels and junction
boxes as specified:

A Sludge Lifting Pump No.2a (WWR Tank 2) m 45

B Sludge Lifting Pump No.2b (WWR Tank 2) m 47

To following equipment Junction Box using 1 x 10mm


sq. 4 core (Cu.) PVC/SWA/ PVC complete with all
control cables as specified to be laid underground and
partially on tray. Rate to include, excavation and
backfilling works, hot dip galvanised cable tray, cable
ties, cable glands, cable markers, emergency push
button with wiring to MCC, fixing accessories, etc.
and termination works to the panels and junction
boxes as specified:

C New Grit Submersible Mixer m 67

To following equipment Junction Box using 1 x 16mm


sq. 4 core (Cu.) PVC/SWA/ PVC complete with all
control cables as specified to be laid underground and
partially on tray. Rate to include, excavation and
backfilling works, hot dip galvanised cable tray, cable
ties, cable glands, cable markers, emergency push
button with wiring to MCC, fixing accessories, etc.
and termination works to the panels and junction
boxes as specified:

D New Grit Pump m 65

Carried To Collection

BQ-B5/3 (Add 1)
UPGRADING SLUDGE TREATMENT FACILITY
PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED
WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

SUBMAIN CABLING WORKS FOR


MCC-STF2 (CONT'D)

To following equipment Junction Box using 1 x 50mm


sq. 4 core (Cu.) PVC/SWA/ PVC complete with all
control cables as specified to be laid underground and
partially on tray. Rate to include, excavation and
backfilling works, hot dip galvanised cable tray, cable
ties, cable glands, cable markers, emergency push
button with wiring to MCC, fixing accessories, etc.
and termination works to the panels and junction
boxes as specified.

A Existing Wash Water Recovery Pump No.1 m 33

B Existing Wash Water Recovery Pump No.2 m 35

To following equipment Junction Box using 1 x 4mm


sq. 4 core (Cu.) PVC/SWA/ PVC complete with all
control cables as specified to be laid underground and
partially on tray. Rate to include, excavation and
backfilling works, hot dip galvanised cable tray, cable
ties, cable glands, cable markers, emergency push
button with wiring to MCC, fixing accessories, etc.
and termination works to the panels and junction
boxes as specified:

C Submersible Mixer No.1a (WWR Tank 1) m 38

D Submersible Mixer No.1b (WWR Tank 1) m 28

E Submersible Mixer No.2a (WWR Tank 2) m 55

F Submersible Mixer No.2b (WWR Tank 2) m 40

Carried To Collection

BQ-B5/4 (Add 1)
UPGRADING SLUDGE TREATMENT FACILITY
PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED
WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

SUBMAIN CABLING WORKS FOR


MCC-STF2 (CONT'D)

To following equipment using 1 x 4mm sq. 4 core


(Cu.) PVC/SWA/ PVC complete with all control cables
as specified to be laid underground and partially on
tray. Rate to include, excavation and backfilling
works, hot dip galvanised cable tray, cable ties,
cable glands, cable markers, fixing accessories,
etc. and termination works to the panels and
junction boxes as specified.

A Motorised Inlet Valve No.1 (WWR Tank 1) m 55

B Motorised Inlet Valve No.2 (WWR Tank 2) m 65

C Motorised Outlet Valve No.1 (Decanting 1) m 33

D Motorised Outlet Valve No.2 (Decanting 2) m 45

E To DB-STF2 using 1 x 6mm sq. 4 core PVC/ m 20


SWA/PVC complete with all control cables as specified
to be laid the cable tray and trench. Rate to include
hot dip galvanised cable tray, cable glands, cable
ties, fixing accessories, etc. and termination
works to the boards as specified.

F To Instrument/ Supervisory Panel using 1 x 2.5mm m 15


sq. 4 core PVC/ SWA/PVC complete with all control
cables as specified to be laid the cable tray and trench.
Rate to include hot dip galvanised cable tray, cable
glands cable ties, fixing accessories, etc. and
termination works to the boards as specified.

G To Air Conditional Changeover Panel using 1 x 6mm m 20


sq. 4 core PVC/ SWA/PVC complete with all control
cables as specified to be laid the cable tray and trench.
Rate to include hot dip galvanised cable tray, cable
glands cable ties, fixing accessories, etc. and
termination works to the boards as specified.

Carried To Collection

BQ-B5/5 (Add 1)
UPGRADING SLUDGE TREATMENT FACILITY
PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED
WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

SUBMAIN CABLING WORKS FOR


MCC-STF2 (CONT'D)

A To Outdoor Feeder Pillar using 1 x 10mm sq. 4 core m 55


PVC/ SWA/PVC complete with all control cables as
specified to be laid underground and partially in the tray.
Rate to include excavation and backfilling works, hot dip
galvanised cable tray, cable glands, cable ties, cable
markers, fixing accessories, etc. and termination
works to the boards as specified.

ELECTRICAL JUNCTION BOXES

400V, IP55, wheatherproof electrical junction box for


pumps cabling termination complete with suitable
three phase busbars according to equipment rating,
proper mounting and bracket, necessary fixing and
accessories as follow:

B Existing and New Sludge Lifting Pump No. 6

C Existing Wash Water Recovery Pump No. 2

D New Grit Pump No. 1

E New Submersible Mixer at Grit Chamber No. 1

F New Sludge Submersible Mixer at No. 4


WWR Tanks

EARTHING SYSTEM

G Complete earthing system for the installation of MCC L.S.


and all equipments. Rate to include copper tape,
fixing accessories,earth bar, earthing chamber, earth
rod, sleeves, and etc. as per drawing no.
HLA18/9488/STF-P2/NANAS/E/05

Carried To Collection

BQ-B5/6 (Add 1)
UPGRADING SLUDGE TREATMENT FACILITY
PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED
WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

DISTRIBUTION BOARD, DB-STF2


A Distribution Board DB - STF2 as specified complete No. 1
with MCCBs, ELCB, contactors, timer, internal wiring
and etc as specified.

LIGHTING AND SMALL POWER (DB-STF)

B Supply and install wiring point for lighting using No. 11


2x1.5sq.mm PVC with earthing conductor in 20mm.
Dia G.I conduit complete with 6A metalclad switches
and accessories. Rate also to include forming groove
for installation of concealed conduit or ducting if
necessary.

C Supply and install wiring point for flood lighting using No. 2
2x4sq.mm PVC with earthing conductor in 25mm.
Dia G.I conduit complete with 10A metalclad switches
and accessories. Rate also to include forming groove
for installation of concealed conduit or ducting if necessary.

D Supply and install wiring of small power point using No. 4


2x2.5 sq.mm PVC with earthing conductor in 25mm
Dia G.I conduit complete with 13A Metalclad Switched
Socket Outlet and accessories. Rate also to include
forming groove for installation of concealed conduit or
ducting if necessary.

Supply and install the following lighting fitting complete


with internal wiring, brackets, support, switches,
termination and all accessories as per drawing and
specification.

E 2x20W LED Fluorescent (T8) fitting complete with No. 8


necessary fittings, housing, mounting bracket,
tube, accessories and etc.

F 1x8W self contained 'Emergency' light fitting No. 2


complete with 3 hours standby NICAD battery and
charger.

G 1x8W self contained 'Keluar' sign fitting complete with No. 1


3 hours standby NICAD battery and charger.

H 1x80W LED Flood Light No. 2

Carried To Collection

BQ-B5/7 (Add 1)
UPGRADING SLUDGE TREATMENT FACILITY
PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED
WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

LIGHTNING PROTECTION SYSTEM

Supply, delivery, testing and commission of surge


surge and lightning protection system as per
specification and drawing no.
HLA18/9488/STF-P2/07 and drawing no.
HLA18/9488/STF-P2/NANAS/E/03 complete with air
finial, copper tape 25mm x 3mmfrom terminal to
ground, test clamp, etc. for the Pump Control Room.
Each grounding point shall consist of copper bonded
rods, coupling and exothermic joint. All the points
shall be interconnected with copper tapes and these
copper tapes may be covered with grounding
enhancement material in order to improve the ground
resistance of less than 5 ohm:

A Air Finial No. 4

B Test Clamp No. 4

C 25mm x 3mm copper conductor. Rate to m 55


include forming groove for copper tape
installation and touching up properly with
cement in order to hide the conductor.

D Interlinking by 25 x 3mm copper tapes m 35


installation. Rate to include excavation works.

E Earthing points complete with rods to the m 16


depth of at least 3.6m in length complete
with coupling,exothermic welding, etc.(only
length permanent installed to be measured
for payment).

F Earthing chamber complete with necessary No. 4


for a complete earthing system connection.

Carried To Collection

BQ-B5/8 (Add 1)
UPGRADING SLUDGE TREATMENT FACILITY
PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED
WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

OUTDOOR COMPOUND AND FLOOD


LIGHTING

A Feeder Pillar FP-1 (IP55, outdoor and wheather No. 1


proof type) complete with MCCBs, ELCB, 24-hour
adjustable timer, contactors, internal wiring, lighting,
socket outlet, etc. together with solid earthing complete
with copper tape and earth chamber similar to Furse.

B Cabling works from DB-STF2 to the fittings m 135


using 6mm sq 4C PVC/SWA/PVC underground
cable complete with earthing system, trenching,
sand, cable markers, nylon, protective covers,
ducts, cable joints and terminations, accessories,
etc.

C Concrete foundation complete with all necessary bolts, No. 5


PVC conduit for cable entry for Street/ Compound
Lighting as per drawings and Specifications.

D 10m lighting column with single arm complete with base No. 5
plate loop-in loop-out box, slip bases, internal
wires, etc.

E Lighting fittings complete with 1 x 100W LED No. 3


lamps for compound lighting for new road complete with
mounting accessories, control gear, accessories,
SPD, etc as per appropriate.

F Lighting fittings complete with 1 x 80W LED No. 4


lamps for flood lighting for new road complete with,
mounting accessories, control gear, accessories,
SPD, etc as per appropriate.

G 150 mm diameter Class C G.I. pipes not No. 3


exceeding 6m for road crossings encased in
concrete jackets, drain crossings and all other
areas deemed necessary for cables to be in
ducts.

Carried To Collection

BQ-B5/9 (Add 1)
UPGRADING SLUDGE TREATMENT FACILITY
PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED
WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

MISCELLANEOUS

A 150mm Dia. PVC Class D pipes not exceeding No. 8


3 meter in length for cable entry into building.
Rate to include all necessary excavation and
backfill.

B Sealing works to all M&E opening due to L.S.


pipeworks and cable sleeve entry to building,
sleeve in cable trench, services penetrate
through wall and etc. using mastic seal type as
specified.

C Supply and install 400A TPN MCCB at existing No. 1


MSB-STF to accommodate new installation of
MCC-STF2. Rate shall include any necessary
modification works to the existing MCC, internal
wiring works, fittings and etc.

To dismantle existing MCCBs, power cable,


control cables and related works at existing
MCC-STF1 as specified. Rate to include
handing over asset to Pengurusan Air Selangor
Sdn Bhd or disposal of debris off site:

D Sludge Lifting Pump (Sludge Holding Tank) No. 2

E Sludge Lifting Pump (WWR Tank) No. 2

F Wash Water Recovery Pump No. 2

G Main Single Line Diagram endorsed by No. 1


Professional Engineer and framed with glass
panel. The size of frame shall be minimum
1050mm x 750mm.

H Supply and install of rubber mats with size L.S.


approxiamately 1200mm wide and 6.5mm
thick. The length shall be equal with length of
switchboard and MCC.

J Supply and install relevant signages for panel L.S.


and room.

Carried To Collection

BQ-B5/10
UPGRADING SLUDGE TREATMENT FACILITY
PACKAGE 2 (RE-TENDER) : UPGRADING SLUDGE HOLDING TANK AND OTHER ASSOCIATED
WORKS FOR BUKIT NANAS SLUDGE TREATMENT FACILITY

BILLS OF QUANTITIES
PART B5 - ELECTRICAL WORKS

Rate Amount
Item Description Unit Quantity
(RM) (RM)

MISCELLANEOUS (CONT'D)

A Cutting and hacking works to the existing L.S.


appron not less than 1000mm depth to
accommodate installation of pipe sleeves. Rate
shall include making good to the existing
appron and drain after installation of pipe
sleeves cross the drain.

B Reinstatement of existing roads, and drain after L.S.


new cable installation.

C Testing and setting to work of complete L.S.


installation under this section.

Carried To Collection

BQ-B5/11