Professional Documents
Culture Documents
Important: The site for the proposed works is an occupied premises with a number of
existing installations. The contractor will be required to ensure normal power
supply to the building is maintained throughout and not interfered with
throughout the entire period of this exercise. The contractor will be required to
take all precaution and care so that no damage will occur to the existing
installations on site. The contractor is also advised to secure all the necessary
insurance policies as he will be solely held responsible for any damages to the
existing system, injuries to persons resulting from his activities and/or
interference with normal operations of the building that may result from his
negligence, actions or otherwise.
1) The tenderer is required to check the number of pages in this document and should any be
found to be missing or the figures indistinct, he must inform the procurement officer at once and have the
same rectified. Should the tenderer be in doubt about the precise meaning of any item, word or figures,
or for any reason whatsoever observe any apparent omission of words or figures, he must inform the
procurement officer in order that the clarification is given 5 days before the date for the submission of the
tenders.
2) No liability whatsoever will be admitted nor claim allowed in respect of errors in the completed
tender due to mistakes in this document which should have been rectified in the manner described
above.
3) The tenderer shall not alter or otherwise qualify the text of this specification. Any alteration or
qualification made without authority will be ignored and the text of the specification as printed will be
adhered to.
4) The tenderer shall be deemed to have made allowances in his unit prices generally to cover
items of preliminaries or additions to Prime cost Sums or other items, if those have not been priced
against the respective items.
5) The Tenderer's price shall include all government taxes including duties. etc but only
VAT will be worked out as a percentage of the total in the Summary Page
6) In no case will any expenses incurred by the tenderer in preparation of this tender be
reimbursed.
Section No. 1
PRELIMINARIES
INSTRUCTIONS TO TENDERERS
-1-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
8) The specifications must be priced in Kenya Currency i.e. Shillings and Cents.
9) The quantities given in the bills of quantities are only for guidance. Precise re-measurements will
be done at the end of the contract and the contractor will only be paid for workdone
9. The works shall be carried out in accordance with provisions of the latest Edition of Institution of
Engineering and Technology Wiring Regulations, the most current Kenya Standards governing
such works, NEMA Regulations and relevant provisions of the current Kenya Power by-laws.
The contractor is also presumed to be familiar with the standard General Specifications
governing such works; a copy can however be obtained from our office any working day. The
Particular Specifications have been detailed in the drawings and Bills of Quantities, but the
contractor is advised to seek clarification from the procurement officer on any matter whatsoever
where he has the slightest of doubts.
Section No. 1
PRELIMINARIES
INSTRUCTIONS TO TENDERERS
-2-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 1
PRELIMINARIES
Bill No. 1
PRELIMINARIES
-3-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 2
LOW VOLTAGE 415V 50Hz SWITCHBOARDS
Bill No. 1
AVR By pass Board
-4-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 2
LOW VOLTAGE 415V 50Hz SWITCHBOARDS
Bill No. 2
Generator Selector Board
-5-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
BUSBARS RATINGS
INCOMERS
OUTGOERS
No 1
Section No. 2
LOW VOLTAGE 415V 50Hz SWITCHBOARDS
Bill No. 2
Generator Selector Board
-6-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
INCOMER
OUTGOERS
2/3/2 Allow sum for labelling all the boards and the circuits. SUM
Section No. 2
LOW VOLTAGE 415V 50Hz SWITCHBOARDS
Bill No. 3
New Low Voltage Power Distribution
-7-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 2
Section No. 2
LOW VOLTAGE 415V 50Hz SWITCHBOARDS
-8-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 3
VOLTAGE STABLIZER EQUIPMENT
Bill No. 1
VOLTAGE STABILIZER EQUIPMENT
-9-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
No 1
Section No. 3
VOLTAGE STABLIZER EQUIPMENT
Bill No. 1
VOLTAGE STABILIZER EQUIPMENT
-10-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 4
ELECTRICAL CABLING
Bill No. 1
Electrical Cabling
-11-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 4
ELECTRICAL CABLING
Bill No. 1
Electrical Cabling
-12-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 5
POWER RETICULATION
Bill No. 1
DuctWork and Power Manhole
-13-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 5
POWER RETICULATION
Bill No. 1
DuctWork and Power Manhole
-14-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 6
EARTHING SYSTEM
Bill No. 1
EARTHING INSTALLATIONS
-15-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 6
EARTHING SYSTEM
Bill No. 1
EARTHING INSTALLATIONS
-16-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 7
KENYA POWER DISCONNECTION
Bill No. 1
KPLC Account Closing
-17-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 8
PROPOSAL FOR MAINTENANCE CONTRACT
Bill No. 1
PROPOSAL FOR ROUTINE AND CORRECTIVE MAINT
-18-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
Section No. 9
CONTIGENCY
Bill No. 1
Contigency
-19-
COMMUNICATION AUTHORITY OF KENYA
PROPOSED ELECTRICAL INSTALLATION FOR LOW VOLTAGE SWITCHGEAR
BILLS OF QUANTITIES
FINAL SUMMARY
Section Page Amount
No No
1 PRELIMINARIES 3
4 ELECTRICAL CABLING 12
5 POWER RETICULATION 14
6 EARTHING SYSTEM 16
9 CONTIGENCY 19
-20-