You are on page 1of 8

INVESTMENT OF CORROSION

PROTECTION EQUIPMENT
PROJECT
SHINDONG CONSORTIUM
Doc No.: CHW2204-00-EL-CAL-7301 SIZING CABLE & DROP VOLTAGE
Page 1/8
Rev.: A FOR ELECTRICAL SYSTEM

SIZING CABLE & DROP VOLTAGE FOR


ELECTRICAL SYSTEM
(Blasting & Painting shop BP-WS-1/2/3/4)

VENDOR DOCUMENT REVIEW

1. NO COMENTS

2. MINOR COMENTS
INVESTMENT OF
CORROSION PROTECTION 3. MAJOR COMENTS
EQUIPMENT PROJECT
4. INFORMATION ONY

TECHNICAL REQUISITION No.:


REVIEWED BY:
WF2204-BD-ST-TRD-0033-1
PAKAGE: PROCUREMENT OF
EQUIPMENT/SYSTEM FOR FOUR
(04) BLASTING & PAINTING
PURCHASE ORDER NO.:
DATE:
78-2023/PTSC-KHDT/HD (BP-1/2/3/4)

A 19/05/2023 Issued for Review T.T.H P.T.A N.M.N


REV. DATE PURPOSE PREPARED CHECKED APPROVED
INVESTMENT OF
CORROSION
PROTECTION
EQUIPMENT PROJECT SHINDONG CONSORTIUM

Doc No.: CHW2204-00-EL-CAL-7301 SIZING CABLE & DROP


VOLTAGE FOR ELECTRICAL Page 1/8
Rev.: A SYSTEM

REVISION HISTORY
No Page Content Revision Date Revision No. Note
INFORMATION CALCULATION
Investment of Corrosion Protection Equipment Project
Package: Procurement of Equipment/System for four (04) Blasting & Painting Workshops (BP-
1/2/3/4)
Sizing cable & Drop voltage for Elctrical system
Single Phase: - I : Rated Current (A)
2    L  ( R  cos   X  sin  ) - Vr: Voltage (V)
%V 
  Vr  10 - V: Volt Drop (V)
- R: Cable resistance ():
Three Phase:
1.73    L  ( R  cos   X  sin  ) - X: Inductance resistance ():
%V  - N: No. of conductor for per
  Vr  10
phase
Notes:
1 Derating factor for cable under ground: 0,614
2 Derating factor or cable on tray/ladder: 0,818
3 Calculated current = MF*Rated current
4 Total current of cable = Derating factor*Current
5 In case of Calculated Voltage Drop =< Standard Voltage Drop and Calculated Current =< Total Current of
6 Use cable low voltage for Cable Outdoor or Cable power Supply Equiment Panel: Cu/XLPE/PVC
7 Cable for equiment Lighting, Receptacle indoor use Wiring single core type no amor: Cu/XLPE/PVC

In accordance with IEC 60364-5-52, Table G.51-1

Page 3/8
INVESTMENT OF CORROSION PROTECTION EQUIPMENT PROJECT
Procurement of Equipment/System for Four (04) Blasting & Painting Workshop (BP-1/2/3/4)
Doc. No.: CHW2204-00-EL-CAL-7301 Rev. A
SIZING CABLE AND DROP VOLTAGE FOR ELECTRICAL SYSTEM

SIZING CABLE FOR NON-MOTOR FEEDER


Sizing phase
Cable Data
conductor

Voltage (V)
Calculated Total Cal.
Rated Rated Max.Vol
Current - Installation Der. current Length of Volt
No. From To Power η Cosφ Current No. of R t Drop Remarks
MF 10% Method Core x Size X (Ω/km) at factor of cable cable (m) Drop
(kW) (A) runs per (Ω/km) Current (A) (%)
(A) (mm )
2
0 50 Hz (A) (%)
phase at 90 C

1 (01) Junction Box (JB1) BP-WS-01 3,0 400 0,90 0,90 5,35 5,88 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 26,0 3 0,24 Acceptable
Lighting Panel Lighting Panel Lighting Panel Lighting Panel
(TP-LP1)

2 (02) Junction Box (JB2) BP-WS-01 2,0 400 0,90 0,90 3,56 3,92 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 26,0 3 0,16 Acceptable
3 (03) Junction Box (JB3) BP-WS-01 2,0 400 0,90 0,90 3,56 3,92 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 10,0 3 0,06 Acceptable
4 (04) Junction Box (JB4) BP-WS-01 2,0 400 0,90 0,90 3,56 3,92 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 52,0 3 0,32 Acceptable
5 (01) Junction Box (JB1) BP-WS-02 3,0 400 0,90 0,90 5,35 5,88 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 26,0 3 0,24 Acceptable
(TP-LP2)

6 (02) Junction Box (JB2) BP-WS-02 2,0 400 0,90 0,90 3,56 3,92 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 26,0 3 0,16 Acceptable
7 (03) Junction Box (JB3) BP-WS-02 2,8 400 0,90 0,90 4,99 5,49 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 10,0 3 0,09 Acceptable
8 (04) Junction Box (JB4) BP-WS-02 2,8 400 0,90 0,90 4,99 5,49 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 52,0 3 0,44 Acceptable
9 (01) Junction Box (JB1) BP-WS-03 3,0 400 0,90 0,90 5,35 5,88 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 26,0 3 0,24 Acceptable
(TP-LP3)

10 (02) Junction Box (JB2) BP-WS-03 2,0 400 0,90 0,90 3,56 3,92 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 26,0 3 0,16 Acceptable
11 (03) Junction Box (JB3) BP-WS-03 2,8 400 0,90 0,90 4,99 5,49 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 10,0 3 0,09 Acceptable
12 (04) Junction Box (JB4) BP-WS-03 2,8 400 0,90 0,90 4,99 5,49 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 52,0 3 0,44 Acceptable
13 (01) Junction Box (JB1) BP-WS-04 3,0 400 0,90 0,90 5,35 5,88 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 26,0 3 0,24 Acceptable
(TP-LP4)

14 (02) Junction Box (JB2) BP-WS-04 2,0 400 0,90 0,90 3,56 3,92 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 26,0 3 0,16 Acceptable
15 (03) Junction Box (JB3) BP-WS-04 2,8 400 0,90 0,90 4,99 5,49 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 10,0 3 0,09 Acceptable
16 (04) Junction Box (JB4) BP-WS-04 2,8 400 0,90 0,90 4,99 5,49 In Air 1 4Cx6 3,9424 0,0902 54 0,82 44 52,0 3 0,44 Acceptable
17 (01) String of lights (L1) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 30,5 3 0,14 Acceptable
BP-WS-01 BP-WS-01 BP-WS-01 BP-WS-01
(JB1)

18 (02) String of lights (L3) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 41,5 3 0,19 Acceptable
19 (03) String of lights (L5) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 52,5 3 0,24 Acceptable

20 (01) String of lights (L2) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 36,0 3 0,16 Acceptable
(JB2)

21 (02) String of lights (L4) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 47,0 3 0,21 Acceptable

22 (01) String of lights (L6) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 33,5 3 0,15 Acceptable
(JB3)

23 (02) String of lights (L7) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 29,5 3 0,13 Acceptable

24 (01) String of lights (L8) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 76,5 3 0,35 Acceptable
(JB4)

25 (02) String of lights (L9) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 82,5 3 0,37 Acceptable

Page 4/8
INVESTMENT OF CORROSION PROTECTION EQUIPMENT PROJECT
Procurement of Equipment/System for Four (04) Blasting & Painting Workshop (BP-1/2/3/4)
Doc. No.: CHW2204-00-EL-CAL-7301 Rev. A
SIZING CABLE AND DROP VOLTAGE FOR ELECTRICAL SYSTEM

SIZING CABLE FOR NON-MOTOR FEEDER


Sizing phase
Cable Data
conductor

Voltage (V)
Calculated Total Cal.
Rated Rated Max.Vol
Current - Installation Der. current Length of Volt
No. From To Power η Cosφ Current No. of R t Drop Remarks
MF 10% Method Core x Size X (Ω/km) at factor of cable cable (m) Drop
(kW) (A) runs per (Ω/km) Current (A) (%)
(A) (mm )
2
0 50 Hz (A) (%)
phase at 90 C

26 (01) String of lights (L1) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 30,5 3 0,14 Acceptable
BP-WS-04 BP-WS-04 BP-WS-03 BP-WS-03 BP-WS-03 BP-WS-03 BP-WS-02 BP-WS-02 BP-WS-02 BP-WS-02
(JB1)

27 (02) String of lights (L3) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 41,5 3 0,19 Acceptable
28 (03) String of lights (L5) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 52,5 3 0,24 Acceptable

29 (01) String of lights (L2) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 36,0 3 0,16 Acceptable
(JB2)

30 (02) String of lights (L4) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 47,0 3 0,21 Acceptable

31 (01) String of lights (L6) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 34,0 3 0,22 Acceptable
(JB3)

32 (02) String of lights (L7) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 30,0 3 0,19 Acceptable

33 (01) String of lights (L8) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 77,0 3 0,49 Acceptable
(JB4)

34 (02) String of lights (L9) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 83,0 3 0,53 Acceptable

35 (01) String of lights (L1) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 30,5 3 0,14 Acceptable
(JB1)

36 (02) String of lights (L3) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 41,5 3 0,19 Acceptable
37 (03) String of lights (L5) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 52,5 3 0,24 Acceptable

38 (01) String of lights (L2) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 36,0 3 0,16 Acceptable
(JB2)

39 (02) String of lights (L4) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 47,0 3 0,21 Acceptable

40 (01) String of lights (L6) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 34,0 3 0,22 Acceptable
(JB3)

41 (02) String of lights (L7) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 30,0 3 0,19 Acceptable

42 (01) String of lights (L8) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 77,0 3 0,49 Acceptable
(JB4)

43 (02) String of lights (L9) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 83,0 3 0,53 Acceptable

44 (01) String of lights (L1) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 30,5 3 0,14 Acceptable
(JB1)

45 (02) String of lights (L3) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 41,5 3 0,19 Acceptable
46 (03) String of lights (L5) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 52,5 3 0,24 Acceptable

47 (01) String of lights (L2) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 36,0 3 0,16 Acceptable
(JB2)

48 (02) String of lights (L4) 1,0 400 0,90 0,90 1,78 1,96 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 47,0 3 0,21 Acceptable

Page 5/8
INVESTMENT OF CORROSION PROTECTION EQUIPMENT PROJECT
Procurement of Equipment/System for Four (04) Blasting & Painting Workshop (BP-1/2/3/4)
Doc. No.: CHW2204-00-EL-CAL-7301 Rev. A
SIZING CABLE AND DROP VOLTAGE FOR ELECTRICAL SYSTEM

SIZING CABLE FOR NON-MOTOR FEEDER


Sizing phase
Cable Data
conductor

Voltage (V)
Calculated Total Cal.
Rated Rated Max.Vol
Current - Installation Der. current Length of Volt
No. From To Power η Cosφ Current No. of R t Drop Remarks
MF 10% Method Core x Size X (Ω/km) at factor of cable cable (m) Drop
(kW) (A) runs per (Ω/km) Current (A) (%)
(A) (mm )
2
0 50 Hz (A) (%)
phase at 90 C
Power 5 Power 3 Power 1 BP-WS-04 BP-WS-04

49 (01) String of lights (L6) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 34,0 3 0,22 Acceptable
(JB3)

50 (02) String of lights (L7) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 30,0 3 0,19 Acceptable

51 (01) String of lights (L8) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 77,0 3 0,49 Acceptable
(JB4)

52 (02) String of lights (L9) 1,4 400 0,90 0,90 2,49 2,74 In Air 1 4Cx4 5,9008 0,0953 42 0,82 34 83,0 3 0,53 Acceptable
TP

53 (07) TP-LP1 9,0 400 0,90 0,90 16,04 17,64 In Air 1 4Cx16 1,472 0,0833 100 0,82 82 30 3 0,31 Acceptable
TP

54 (12) TP-LP2 10,6 400 0,90 0,90 18,89 20,78 In Air 1 4Cx16 1,472 0,0833 100 0,82 82 25 3 0,31 Acceptable

55 (06) TP-LP3 10,6 400 0,90 0,90 18,89 20,78 In Air 1 4Cx16 1,472 0,0833 100 0,82 82 44 3 0,54 Acceptable
TP

56 (07) TP-LP4 10,6 400 0,90 0,90 18,89 20,78 In Air 1 4Cx16 1,472 0,0833 100 0,82 82 44 3 0,54 Acceptable

Page 6/8
INVESTMENT OF CORROSION PROTECTION EQUIPMENT PROJECT
Procurement of Equipment/System for Four (04) Blasting & Painting Workshop (BP-1/2/3/4)
Doc. No.: CHW2204-00-EL-CAL-7301 Rev. A
SIZING CABLE AND DROP VOLTAGE FOR ELECTRICAL SYSTEM

SIZING CABLE FOR MOTOR FEEDER

Sizing phase conductor Cable Data Cal.

Voltage (V)
Calculate Total Max.Vol Cal. Volt Max.Volt
Rated Rated Volt
d Current Installation R X Der. current Length of t Drop Drop Drop
No. From To Power η Cosφ Current Drop Remarks
- MF 20% Method No. of runs Core x Size (Ω/km) (Ω/km) Current factor of cable cable (m) Running Running Starting
(kW) (A) 2 Starting
(A) per phase (mm ) 0 (A) (A) (%) (%) (%)
at 90 C at 50 Hz (%)

1 (01) BPS-06A 30,0 400 0,89 0,86 56,57 67,89 Underground 1 4Cx25 0,9306 0,0810 127 0,61 78,0 14,0 3 0,35 5 1,32 Acceptable
2 (02) AHS-1 150,0 400 0,94 0,87 264,74 317,69 Underground 1 4Cx240 0,0965 0,0736 538 0,61 330,2 34,0 3 0,56 5 3,84 Acceptable
Electrical Cabinet (TP

3 (03) VR-50 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 17,0 3 0,30 5 1,51 Acceptable
POWER 1)

4 (04) DC-1200 90,0 400 0,92 0,87 162,30 194,76 Underground 1 4Cx120 0,1958 0,0751 346 0,61 212,4 15,0 3 0,26 5 1,41 Acceptable
5 (05) AHS-4 150,0 400 0,94 0,87 264,74 317,69 Underground 1 4Cx240 0,0965 0,0736 538 0,61 330,2 30,0 3 0,50 5 3,39 Acceptable
6 (06) AHS-5 150,0 400 0,94 0,87 264,74 317,69 Underground 1 4Cx240 0,0965 0,0736 538 0,61 330,2 40,0 3 0,66 5 4,52 Acceptable
8 (07) TK-LP1 9,0 400
9 (08) Spare 1 60,0 400
10 (09) Spare 2 60,0 400
11 (01) BPS-06B 15,0 400 0,88 0,86 28,61 34,33 Underground 1 4Cx16 1,4720 0,0833 100 0,61 61,4 16,0 3 0,31 5 1,13 Acceptable
12 (02) AHS-2 150,0 400 0,94 0,87 264,74 317,69 Underground 1 4Cx240 0,0965 0,0736 538 0,61 330,2 30,0 3 0,50 5 3,39 Acceptable
Electrical Cabinet (TP POWER 2)

13 (03) DC-1200 90,0 400 0,92 0,87 162,30 194,76 Underground 1 4Cx120 0,1958 0,0751 346 0,61 212,4 30,0 3 0,52 5 2,81 Acceptable
14 (04) VR-50 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 13,0 3 0,23 5 1,15 Acceptable
15 (05) Metallizing 35,0 400 0,90 0,86 65,27 78,32 Underground 1 4Cx50 0,4954 0,0778 192 0,61 117,8 10,0 3 0,16 5 0,67 Acceptable
16 (06) Metallizing 35,0 400 0,90 0,86 65,27 78,32 Underground 1 4Cx50 0,4954 0,0778 192 0,61 117,8 10,0 3 0,16 5 0,67 Acceptable
17 (07) Metallizing 35,0 400 0,90 0,86 65,27 78,32 Underground 1 4Cx50 0,4954 0,0778 192 0,61 117,8 10,0 3 0,16 5 0,67 Acceptable
18 (08) Metallizing 35,0 400 0,90 0,86 65,27 78,32 Underground 1 4Cx50 0,4954 0,0778 192 0,61 117,8 10,0 3 0,16 5 0,67 Acceptable
19 (09) Metallizing 35,0 400 0,90 0,86 65,27 78,32 Underground 1 4Cx50 0,4954 0,0778 192 0,61 117,8 10,0 3 0,16 5 0,67 Acceptable
20 (10) Metallizing 35,0 400 0,90 0,86 65,27 78,32 Underground 1 4Cx50 0,4954 0,0778 192 0,61 117,8 10,0 3 0,16 5 0,67 Acceptable
21 (11) DOOR 1 18,0 400 0,89 0,86 33,94 40,73 Underground 1 4Cx35 0,6707 0,0792 158 0,61 97,0 98,0 3 1,07 5 4,27 Acceptable
22 (12) DOOR 2 18,0 400 0,89 0,86 33,94 40,73 Underground 1 4Cx35 0,6707 0,0792 158 0,61 97,0 92,0 3 1,00 5 4,01 Acceptable
23 (13) Spare 1 60,0 400
24 (14) Spare 2 60,0 400
25 (01) DRYCE-800 12,0 400 0,87 0,86 23,15 27,78 Underground 1 4Cx10 2,3424 0,0863 75 0,61 46,0 15,0 3 0,37 5 1,30 Acceptable
26 (02) AFTER COOLER 10,0 400 0,86 0,85 19,75 23,69 Underground 1 4Cx10 2,3424 0,0863 75 0,61 46,0 15,0 3 0,31 5 1,11 Acceptable
Electrical Cabinet (TP POWER 3)

27 (03) COMP 1 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 27,0 3 0,48 5 2,39 Acceptable
28 (04) COMP 2 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 25,0 3 0,44 5 2,21 Acceptable
29 (05) COMP 3 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 23,0 3 0,41 5 2,04 Acceptable
30 (06) COMP 4 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 21,0 3 0,37 5 1,86 Acceptable
31 (07) COMP 5 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 21,0 3 0,37 5 1,86 Acceptable
32 (08) COMP 6 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 23,0 3 0,41 5 2,04 Acceptable
33 (09) COMP 7 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 25,0 3 0,44 5 2,21 Acceptable
34 (10) COMP 8 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 27,0 3 0,48 5 2,39 Acceptable
35 (11) AHS-4 132,0 400 0,94 0,87 232,97 279,57 Underground 1 4Cx240 0,0965 0,0736 538 0,61 330,2 32,0 3 0,47 5 3,18 Acceptable
36 (12) TP-LP2 10,6 400

Page 7/8
Sizing phase conductor Cable Data Cal.

Voltage (V)
Calculate Total Max.Vol Cal. Volt Max.Volt
Rated Rated Volt
d Current Installation R X Der. current Length of t Drop Drop Drop
No. From To Power η Cosφ Current Drop Remarks
- MF 20% Method No. of runs Core x Size (Ω/km) (Ω/km) Current factor of cable cable (m) Running Running Starting
(kW) (A) 2 Starting
(A) per phase (mm ) 0 (A) (A) (%) (%) (%)
at 90 C at 50 Hz (%)

37 (13) Spare 1 60,0 400


38 (14) Spare 2 60,0 400
39 (01) DRYCE-600 8,0 400 0,85 0,83 16,37 19,64 Underground 1 4Cx10 2,3424 0,0863 75 0,61 46,0 20,0 3 0,34 5 1,23 Acceptable
Electrical Cabinet (TP POWER 4)

40 (02) AFTER COOLER 7,5 400 0,85 0,83 15,34 18,41 Underground 1 4Cx10 2,3424 0,0863 75 0,61 46,0 15,0 3 0,24 5 0,86 Acceptable
41 (03) COMP 1 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 14,0 3 0,25 5 1,24 Acceptable
42 (04) COMP 2 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 15,0 3 0,27 5 1,33 Acceptable
43 (05) COMP 3 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 16,0 3 0,28 5 1,42 Acceptable
44 (06) COMP 4 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 17,0 3 0,30 5 1,51 Acceptable
45 (07) COMP 5 75,0 400 0,92 0,87 135,25 162,30 Underground 1 4Cx95 0,2470 0,0758 298 0,61 182,9 18,0 3 0,32 5 1,59 Acceptable
46 (08) AC-2000 132,0 400 0,94 0,87 232,97 279,57 Underground 1 4Cx240 0,0965 0,0736 538 0,61 330,2 25,0 3 0,36 5 2,49 Acceptable
47 (09) DOOR-3 18,0 400 0,89 0,86 33,94 40,73 Underground 1 4Cx35 0,6707 0,0792 158 0,61 97,0 85,0 3 0,93 5 3,71 Acceptable
48 (10) Spare 1 50,0 400
49 (11) Spare 2 50,0 400
50 (01) AC-2000 132,0 400 0,94 0,87 232,97 279,57 Underground 1 4Cx240 0,0965 0,0736 538 0,61 330,2 25,0 3 0,36 5 2,49 Acceptable
Electrical Cabinet (TP

51 (02) AC-2000 132,0 400 0,94 0,87 232,97 279,57 Underground 1 4Cx240 0,0965 0,0736 538 0,61 330,2 25,0 3 0,36 5 2,49 Acceptable
50 (03) DOOR-4 18,0 400 0,88 0,86 34,33 41,20 Underground 1 4Cx35 0,6707 0,0792 158 0,61 97,0 90,0 3 0,99 5 3,97 Acceptable
POWER 5)

51 (04) DOOR-5 18,0 400 0,88 0,86 34,33 41,20 Underground 1 4Cx35 0,6707 0,0792 158 0,61 97,0 80,0 3 0,88 5 3,53 Acceptable
52 (05) DOOR-6 18,0 400 0,88 0,86 34,33 41,20 Underground 1 4Cx35 0,6707 0,0792 158 0,61 97,0 90,0 3 0,99 5 3,97 Acceptable
53 (06) TP-LP3 10,6 400
54 (07) TP-LP4 10,6 400
55 (08) Spare 60,0 400

Notes:
1. Derating factor for cable under groun 0,614
2. Derating factor or cable on tray/ladde 0,818
3. Calculated current = MF*Rated current = 120%xRated current (Motor); 110%xRated current (Non Motor)
4. Total current of cable = Derating factor*Current
5. In case of Calculated Voltage Drop =< Maximum Voltage Drop and Calculated Current =< Total Current of Cable, the result of calculation is Acceptable

Page 8/8